If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 34-115-24670 | | Well ID: 34-115-24670 | ||
− | | style="height=100%; align=center" rowspan="15" | {{#display_map: 39. | + | | style="height=100%; align=center" rowspan="15" | {{#display_map: 39.74412944, -81.90770132 | width=100% | height=100% }} |
|- | |- | ||
− | | County: | + | | County: [[Morgan County, Ohio|Morgan]] |
|- | |- | ||
− | | Municipality: | + | | Municipality: |
|- | |- | ||
− | | Operator Name: | + | | Operator Name: [[NGO DEVELOPMENT CORP.]] |
|- | |- | ||
− | | Well Pad ID: | + | | Well Pad ID: |
|- | |- | ||
− | | Farm/Lease Name: | + | | Farm/Lease Name: |
|- | |- | ||
− | | First Permit Date: | + | | First Permit Date: |
|- | |- | ||
− | | Last Permit Date: | + | | Last Permit Date: |
|- | |- | ||
| Spud Date: 2012-10-01 | | Spud Date: 2012-10-01 | ||
|- | |- | ||
− | | Unconventional: | + | | Unconventional: No |
|- | |- | ||
− | | | + | | Configuration: Vertical |
|- | |- | ||
− | | Producing | + | | Well Status: Producing |
|- | |- | ||
| Violations: 0 | | Violations: 0 | ||
|- | |- | ||
− | | Latitude: 39. | + | | Latitude: 39.74412944 |
|- | |- | ||
− | | Longitude: -81. | + | | Longitude: -81.90770132 |
|- | |- | ||
|} | |} | ||
Line 43: | Line 43: | ||
!scope="col" | OIL QUANTITY | !scope="col" | OIL QUANTITY | ||
!scope="col" | OIL PRODUCTION DAYS | !scope="col" | OIL PRODUCTION DAYS | ||
+ | |- | ||
+ | | 2013-0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 241.0 | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2014-0 | ||
+ | | style="text-align:right;" | 0.0 | ||
+ | | style="text-align:right;" | 365.0 | ||
+ | | | ||
+ | | | ||
+ | | style="text-align:right;" | 424.0 | ||
+ | | style="text-align:right;" | 365.0 | ||
+ | |- | ||
|} | |} | ||
− | + | For data sources see<ref>{{cite web | |
− | + | | title = Ohio Department of Natural Resources RBDMS | |
− | + | | publisher = [http://oilandgas.ohiodnr.gov/] | |
− | + | | date = 2015-06-19 | |
− | + | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production | |
− | + | | accessdate = 2015-06-20 }}</ref> | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
== Inspection Data == | == Inspection Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 64: | Line 76: | ||
!scope="col" | VIOLATION ID | !scope="col" | VIOLATION ID | ||
!scope="col" | VIOLATION CODE | !scope="col" | VIOLATION CODE | ||
− | !scope="col" | | + | !scope="col" | VIOLATION COMMENT |
|- | |- | ||
| -1047811803 | | -1047811803 | ||
| 2012-10-25 | | 2012-10-25 | ||
− | | | + | | |
| Warren rig 7 is plugging back from roserun sandstone to 200'below the clinton sandstone. Formation is placing the plugs. Bottom plug is at 6338-6138. The point pleasant/utica plug is at 5745-5545'. The Buffer plug below the clinton is at 4996-4796'. The well will be sold to NGO. | | Warren rig 7 is plugging back from roserun sandstone to 200'below the clinton sandstone. Formation is placing the plugs. Bottom plug is at 6338-6138. The point pleasant/utica plug is at 5745-5545'. The Buffer plug below the clinton is at 4996-4796'. The well will be sold to NGO. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | 128310938 | ||
+ | | 2013-04-30 | ||
+ | | | ||
+ | | Location does not meet preliminary restoration. Access road was completely muddy due to recent rain so I will return when area is more accessible for vehicles. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 1350488898 | ||
+ | | 2012-10-17 | ||
+ | | | ||
+ | | I arrived on location and Artex was currently drilling after changing to a PDC bit. They had finished drilling through the Clinton last night and are now drilling through the Queenston. Depth at this time is ~4460' and the ROP is around 5-8 min/foot. Stratigraph muddlogers are on site. | ||
+ | | | ||
+ | | | ||
+ | | | ||
+ | |- | ||
+ | |- | ||
+ | | 2012187468 | ||
+ | | 2012-10-09 | ||
+ | | | ||
+ | | Jake Glascock and I stopped in to check Warren Drilling rig. They are setting cement plugs to heal a Theif zone at the gray shale in the Ohio Shale. Artex is pin pointing where the lost circulation zone is so they can case off in the wells in the future. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
| -431134910 | | -431134910 | ||
| 2012-10-02 | | 2012-10-02 | ||
− | | | + | | |
| On 10-1-12 Formation Cementing cemented 11.75''conductor pipe in to 100'. I was out witnessing the pressure test since I missed the conductor job. The test passed 300psi for 15 minutes. | | On 10-1-12 Formation Cementing cemented 11.75''conductor pipe in to 100'. I was out witnessing the pressure test since I missed the conductor job. The test passed 300psi for 15 minutes. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
+ | |- | ||
+ | |- | ||
+ | | 437848927 | ||
+ | | 2014-09-30 | ||
+ | | | ||
+ | | Site now correctly meets 1509.072 preliminary requirements. | ||
+ | | | ||
+ | | | ||
+ | | | ||
|- | |- | ||
|- | |- | ||
| -903125184 | | -903125184 | ||
| 2012-10-04 | | 2012-10-04 | ||
− | | | + | | |
| Artex is setting surface pipe and Warren rig 7 is placing pipe. Universal is on location to cement pipe in place. There is 1636'of 11''open hole. There is 1574 of 8.625''casing @24lb/ft. Baffle is set at 1531'. As plug was landed at 550psi the company took pressure up to 1000 psi for 15 min.and bled back to lift pressure which is at 550psi. | | Artex is setting surface pipe and Warren rig 7 is placing pipe. Universal is on location to cement pipe in place. There is 1636'of 11''open hole. There is 1574 of 8.625''casing @24lb/ft. Baffle is set at 1531'. As plug was landed at 550psi the company took pressure up to 1000 psi for 15 min.and bled back to lift pressure which is at 550psi. | ||
− | | | + | | |
− | | | + | | |
− | | | + | | |
|- | |- | ||
|- | |- | ||
| -909179358 | | -909179358 | ||
| 2012-10-24 | | 2012-10-24 | ||
− | | | + | | |
| Stopped in at Warren rig 7 and talked with Artex on plug placement. Will call when pipe on bottom to set plugs. | | Stopped in at Warren rig 7 and talked with Artex on plug placement. Will call when pipe on bottom to set plugs. | ||
− | + | | | |
− | + | | | |
− | + | | | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | | | ||
− | | | ||
− | | | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Ohio Department of Natural Resources RBDMS | ||
+ | | publisher = [http://oilandgas.ohiodnr.gov/] | ||
+ | | date = 2015-06-19 | ||
+ | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection | ||
+ | | accessdate = 2015-06-20 }}</ref> | ||
+ | == References == | ||
+ | {{reflist}} | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Wells]] | [[Category:Wells]] |
Well ID: 34-115-24670 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.74412944,"lon":-81.90770132,"icon":""}]} |
County: Morgan | |
Municipality: | |
Operator Name: NGO DEVELOPMENT CORP. | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2012-10-01 | |
Unconventional: No | |
Configuration: Vertical | |
Well Status: Producing | |
Violations: 0 | |
Latitude: 39.74412944 | |
Longitude: -81.90770132 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2013-0 | 0.0 | 241.0 | ||||
2014-0 | 0.0 | 365.0 | 424.0 | 365.0 |
For data sources see[1]
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION COMMENT |
---|---|---|---|---|---|---|
-1047811803 | 2012-10-25 | Warren rig 7 is plugging back from roserun sandstone to 200'below the clinton sandstone. Formation is placing the plugs. Bottom plug is at 6338-6138. The point pleasant/utica plug is at 5745-5545'. The Buffer plug below the clinton is at 4996-4796'. The well will be sold to NGO. | ||||
128310938 | 2013-04-30 | Location does not meet preliminary restoration. Access road was completely muddy due to recent rain so I will return when area is more accessible for vehicles. | ||||
1350488898 | 2012-10-17 | I arrived on location and Artex was currently drilling after changing to a PDC bit. They had finished drilling through the Clinton last night and are now drilling through the Queenston. Depth at this time is ~4460' and the ROP is around 5-8 min/foot. Stratigraph muddlogers are on site. | ||||
2012187468 | 2012-10-09 | Jake Glascock and I stopped in to check Warren Drilling rig. They are setting cement plugs to heal a Theif zone at the gray shale in the Ohio Shale. Artex is pin pointing where the lost circulation zone is so they can case off in the wells in the future. | ||||
-431134910 | 2012-10-02 | On 10-1-12 Formation Cementing cemented 11.75conductor pipe in to 100'. I was out witnessing the pressure test since I missed the conductor job. The test passed 300psi for 15 minutes. | ||||
437848927 | 2014-09-30 | Site now correctly meets 1509.072 preliminary requirements. | ||||
-903125184 | 2012-10-04 | Artex is setting surface pipe and Warren rig 7 is placing pipe. Universal is on location to cement pipe in place. There is 1636'of 11open hole. There is 1574 of 8.625casing @24lb/ft. Baffle is set at 1531'. As plug was landed at 550psi the company took pressure up to 1000 psi for 15 min.and bled back to lift pressure which is at 550psi. | ||||
-909179358 | 2012-10-24 | Stopped in at Warren rig 7 and talked with Artex on plug placement. Will call when pipe on bottom to set plugs. |
For data sources see[2]