If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-115-24670 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.74,"lon":-81.9,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Morgan | |
Municipality: Bloom Township | |
Operator Name: DIVERSIFIED PRODUCTION LLC | |
Well Pad ID: | |
Farm/Lease Name: MAUTZ-CATON UNIT | |
License Status: Producing | |
License Date: 2012-09-05 | |
Spud Date: 2012-10-01 | |
Spud Drilling Contractor: WARREN DRLG | |
Final Drill Date: 2012-10-25 | |
Well Total Depth: 6735.00 ft | |
Configuration: Vertical | |
Latitude: 39.740000 | |
Longitude: -81.900000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2012-09-05 | Proposed Formations:KNOX, Issued Date:9/5/2012, Expired Date:9/5/2014 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:EDPW |
Correction to Well | 2012-09-07 | CORRECTION TO LEASE NAME. |
Plugged Back | 2012-10-25 | |
Reached Total Depth | 2012-10-25 | |
Change of Owner | 2012-10-30 | Operator changed from 5352, ARTEX OIL COMPANY to 98, NGO DEVELOPMENT CORP. |
Completion Report Received | 2013-06-19 | |
Construction Permit Expires | 2014-09-05 | |
Change of Owner | 2018-03-07 | Operator changed from 98, NGO DEVELOPMENT CORP. to 8685, M & R INVESTMENTS OHIO LLC |
Record Last Modified | 2018-03-08 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2013-06-20 | 4361 | 4457 | 37 |
4361 | 4457 | 37 | |
4361 | 4457 | 37 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 11/09/2012 | 11/09/2012 | 6736 | 81807 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Other Chemicals | water | 7732-18-5 | 100 | 92.4 | 0 | ||
ProClaFirm(LP) | WFD | Clay Stabilizer | Ethylene Glycol | 107-21-1 | 60 | 0.0072 | 0 | |
2-Propen-1-aminium,N,Ndimethyl-N-2propenyl-,chloride,
homopolymer |
26062-79-3 | 40 | 0.0048 | 0 | ||||
ProBreak 4 | Rhodia Inc | breaker | Sucrose | 57-50-1 | 46 | 0.00046 | 0 | |
Ethylene Glycol | 107-21-1 | 14 | 0.00014 | 0 | ||||
FLC | CESI Chemical | Fluid Loss | Polysaccharide | 9005-25-8 | 0 | 0.1281 | 0 | |
Silica, Crystalline Quartz | 14808-60-7 | 65 | 0.2379 | 0 | ||||
Buffer 1 | WFD | buffer | Sulfamic Acid | 5329-14-6 | 100 | 0.061 | 0 | |
Pro Clear Slik-2 | WFD | Friction Reducer | Polymer | mixture | 60 | 0.042 | 0 | |
Irontrol | WFD | Iron Stabilizer | Sulfamic Acid | 5329-14-6 | 70 | 0.122 | 0 | |
ProGel 4 | International Polymerics | gel | Guar Gum Blend | 9000-30-0 | 100 | 0.305 | 0 | |
Silica Sand | US Silica | proppant | Crystalline Silica (quartz | 308075-07-2 | 99.9 | 5.942 | 0 | |
IC Acid | Ashland | Acid | Hydrochloric Acid | 7647-01-0 | 40 | 0.733 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2012-11-09 | H2O | 15 | 81807 Gal | 40000 | BAKER-HUGHES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | NGO DEVELOPMENT CORP. | 0.00 | 241.00 | 131 |
2014 | NGO DEVELOPMENT CORP. | 0.00 | 424.00 | 365 |
2015 | NGO DEVELOPMENT CORP. | 0.00 | 67.00 | 365 |
2016 | NGO DEVELOPMENT CORP. | 0.00 | 51.00 | 365 |
2017 | NGO DEVELOPMENT CORP. | 0.00 | 0.00 | 365 |
2018 | M & R INVESTMENTS OHIO LLC | 0.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | NGO DEVELOPMENT CORP. | Brine | 1777 | 131 |
2014 | NGO DEVELOPMENT CORP. | Brine | 3888 | 365 |
2015 | NGO DEVELOPMENT CORP. | Brine | 1555 | 365 |
2016 | NGO DEVELOPMENT CORP. | Brine | 252 | 365 |
2017 | NGO DEVELOPMENT CORP. | Brine | 0 | 365 |
2018 | NGO DEVELOPMENT CORP. | Brine | 0 | 0 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1047811803 | 2012-10-25 0:00 | PB | No Violations | 6.50 |
-431134910 | 2012-10-2 0:00: | DD | No Violations | 5.00 |
-903125184 | 2012-10-4 0:00: | DD | No Violations | 4.00 |
-909179358 | 2012-10-24 0:00 | DD | No Violations | 2.00 |
0128310938 | 2013-04-30 | Production Wells | No Violations | Location does not meet preliminary restoration. Access road was completely muddy due to recent rain so I will return when area is more accessible for vehicles. |
0431134910 | 2012-10-02 | Drill / Deepen / Reopen | No Violations | On 10-1-12 Formation Cementing cemented 11.75conductor pipe in to 100. I was out witnessing the pressure test since I missed the conductor job. The test passed 300psi for 15 minutes. |
0437848927 | 2014-09-30 | Preliminary Restoration | No Violations | Site now correctly meets 1509.072 preliminary requirements. |
0903125184 | 2012-10-04 | Drill / Deepen / Reopen | No Violations | Artex is setting surface pipe and Warren rig 7 is placing pipe. Universal is on location to cement pipe in place. There is 1636of 11open hole. There is 1574 of 8.625casing @24lb/ft. Baffle is set at 1531. As plug was landed at 550psi the company took pressure up to 1000 psi for 15 min.and bled back to lift pressure which is at 550psi. |
0909179358 | 2012-10-24 | Drill / Deepen / Reopen | No Violations | Stopped in at Warren rig 7 and talked with Artex on plug placement. Will call when pipe on bottom to set plugs. |
1047811803 | 2012-10-25 | Plug / Plug Back | No Violations | Warren rig 7 is plugging back from roserun sandstone to 200below the clinton sandstone. Formation is placing the plugs. Bottom plug is at 6338-6138. The point pleasant/utica plug is at 5745-5545. The Buffer plug below the clinton is at 4996-4796. The well will be sold to NGO. |
128310938 | 2013-4-30 0:00: | PW | No Violations | 0.70 |
1350488898 | 2012-10-17 | Drill / Deepen / Reopen | No Violations | I arrived on location and Artex was currently drilling after changing to a PDC bit. They had finished drilling through the Clinton last night and are now drilling through the Queenston. Depth at this time is ~4460 and the ROP is around 5-8 min/foot. Stratigraph muddlogers are on site. |
2012187468 | 2012-10-09 | Drill / Deepen / Reopen | No Violations | Jake Glascock and I stopped in to check Warren Drilling rig. They are setting cement plugs to heal a Theif zone at the gray shale in the Ohio Shale. Artex is pin pointing where the lost circulation zone is so they can case off in the wells in the future. |
437848927 | 2014-9-30 0:00: | PL | No Violations |
For data sources see[10]