X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-167-23905"

m
m
Line 1: Line 1:
__TOC__
+
__TOC__
 
== Well Details ==
 
== Well Details ==
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-167-23905
 
| Well ID: 34-167-23905
| style="height=100%; align=center" rowspan="15" | {{#display_map: 39.38597577, -81.63124976 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 39.386097432, -81.63112261 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Washington County, Ohio|Washington]]
+
| Country: United States
 
|-
 
|-
| Municipality:  
+
| State: Ohio
 
|-
 
|-
| Operator Name: [[TRI-CITY DRILL JOINT VENT]]
+
| County: [[Washington_County,_Ohio|Washington]]
 +
|-
 +
| Municipality: [[Barlow_Township,_Washington_County,_Ohio|Barlow Township]]
 +
|-
 +
| Operator Name: [[TRI-CITY DRILLING JOINT VENTUR]]
 
|-
 
|-
 
| Well Pad ID:  
 
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:  
+
| Farm/Lease Name: CARVER NORVAL
 
|-
 
|-
| First Permit Date:  
+
| License Status: Producing
 
|-
 
|-
| Last Permit Date:  
+
| License Date: 1982-12-28
 
|-
 
|-
 
| Spud Date: 1977-09-25
 
| Spud Date: 1977-09-25
 
|-
 
|-
| Unconventional: No
+
| Spud Drilling Contractor:  
 +
|-
 +
| Final Drill Date: 1977-10-20
 +
|-
 +
| Well Total Depth: 1287 ft
 
|-
 
|-
 
| Configuration: Vertical
 
| Configuration: Vertical
 
|-
 
|-
| Well Status: Producing
+
| Latitude: 39.386097432
 +
|-
 +
| Longitude: -81.63112261
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Well Status
 +
!scope="col" style="width: 15%;text-align: center"| Well Status Date
 +
!scope="col" style="text-align: center"| Comment
 +
|-
 +
| Original Spud
 +
| 1977-09-25
 +
 +
|-
 +
| Completed
 +
| 1977-10-20
 +
 
|-
 
|-
| Violations: 0
+
| Reached Total Depth
 +
| 1977-10-20
 +
 
|-
 
|-
| Latitude: 39.38597577
+
| CO
 +
| 1982-12-28
 +
| 1331  TRI-CITY DRILL JOINT VENT  GeoDate  12/28/82
 
|-
 
|-
| Longitude: -81.63124976
+
| Record Last Modified
 +
| 2013-10-03
 +
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Well and WellHistry Tables
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
<!--== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Perforation Date
 +
!scope="col" style="text-align: center"| Interval Top (ft)
 +
!scope="col" style="text-align: center"| Interval Base (ft)
 +
!scope="col" style="text-align: center"| Number of Shots
 +
|-
 +
|}-->
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Job Number
 +
!scope="col" style="text-align: center"| Job Start Date
 +
!scope="col" style="text-align: center"| Job End Date
 +
!scope="col" style="text-align: center"| True Vertical Depth (ft)
 +
!scope="col" style="text-align: center"| Total Water Volume (gal)
 +
!scope="col" style="text-align: center"| Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" style="width: 100%"
 +
!scope="col" style="text-align: center"| Job Number
 +
!scope="col" style="text-align: center"| Trade Name
 +
!scope="col" style="text-align: center"| Supplier
 +
!scope="col" style="text-align: center"| Purpose
 +
!scope="col" style="text-align: center"| Ingredient Name
 +
!scope="col" style="white-space: nowrap;text-align: center"| CAS Number
 +
!scope="col" style="text-align: center"| Additive Percentage by Mass
 +
!scope="col" style="text-align: center"| Job Percentage by Mass
 +
!scope="col" style="text-align: center"| Mass Used (lb)
 +
|-
 +
|}-->
 +
<!--== Stimulations Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Stimulation Date
 +
!scope="col" style="text-align: center"| Chemical Agent
 +
!scope="col" style="text-align: center"| Chemical Agent Concentration (%)
 +
!scope="col" style="text-align: center"| Fracking Fluid Volume
 +
!scope="col" style="text-align: center"| Mass of Proppant Used (lb)
 +
!scope="col" style="text-align: center"| Fracking Company
 +
!scope="col" style="text-align: center"| Comments
 +
|-
 +
|}-->
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Period
 +
!scope="col" style="text-align: center"| Operator Name
 +
!scope="col" style="text-align: center"| Gas Quantity (mcf)
 +
!scope="col" style="text-align: center"| Oil Quantity (bbl)
 +
!scope="col" style="text-align: center"| Production Days
 +
|-
 +
| 2018
 +
| [[TRI-CITY DRILLING JOINT VENTUR]]
 +
| style="text-align: right;" | 278
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 365
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Production Table - Oil and Gas Data
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
<ref>{{cite web
 +
| title = Combined Production - Oil and Gas Data
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date = 2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Waste Data ==
 +
{| class="wikitable sortable"
 +
!scope="col" style="text-align: center"| Period
 +
!scope="col" style="text-align: center"| Operator Name
 +
!scope="col" style="text-align: center"| Waste Type
 +
!scope="col" style="text-align: center"| Quantity (bbl)
 +
!scope="col" style="text-align: center"| Production Days
 +
|-
 +
| 2018
 +
| [[TRI-CITY DRILLING JOINT VENTUR]]
 +
| Brine
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 365
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Production Table - Brine Data
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
<ref>{{cite web
 +
| title = Combined Production - Brine Data
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date = 2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" style="text-align: center"| Inspection ID
!scope="col" | DATE
+
!scope="col" style="text-align: center"| Inspection Date
!scope="col" | DESCRIPTION
+
!scope="col" style="text-align: center"| Inspection Type
!scope="col" | COMMENT
+
!scope="col" style="text-align: center"| Inspection Result
!scope="col" | VIOLATION ID
+
!scope="col" style="text-align: center"| Inspection Comments
!scope="col" | VIOLATION CODE
 
!scope="col" | VIOLATION COMMENT
 
 
|-
 
|-
| 858515313
+
| 0858515313
 
| 2006-08-16
 
| 2006-08-16
|  
+
| Production Wells
| Inspection this day found well producing with jack, tank has good ID's, needs more dike.
+
| No Violations
|  
+
| Inspection this day found well producing with jack, tank has good IDs, needs more dike.
|  
+
|-
|  
+
| 0905130921
 +
| 2018-08-17
 +
| Production Wells
 +
| Violations Noted
 +
| On this day, I am conducting an inspection in reference to Complaint #5927. Landowner, Connie and Randall Reid expressed concerns of safety with an exposed 1 inch diameter plastic flowline along their drive. They requested that the flowline be buried.  I found approximately 125 feet of exposed 1 inch plastic line along the drive. The well is equipped with 4.5 inch diameter casing and 2.375 inch diameter tubing with the production valves open. The well appears to show signs of recent activity. There are (2) 100 barrel steel tanks, but only 1 within an earthen dike. It will be noted that there is a vertical separator near the wellhead, within less than 20 feet, which does not meet the spacing requirements of 50 feet minimum spacing from the wellhead. The identification at the tank is faded and needs updated, and annual production has never been reported. Multiple pictures were taken. An attempt to contact Tri-City Drilling was made on 8/21/2018, and spoke with Greg Nuzum, to inform him of the issues and time frame for remediation. To bring the well within compliance, the following will need to be conducted. 1) Bury the gas line approximately 24 inches 2) Move the separator within 50 feet minimum of the wellhead 3) Properly identify the wellhead and/or tanks.
 +
|-
 +
| 0996162826
 +
| 2018-09-26
 +
| Production Wells
 +
| No Violations
 +
| On this day, I am conducting a compliance notice follow-up inspection in regard to Complaint #5927. There has been no progress made to remediate the issues and get the well back within compliance. The section of pipeline that was requested to be buried is above ground, the identification is not updated, and the separator has not been adjusted to the minimum 50 setback from the wellhead. Updated pictures were taken. An attempt to contact Greg at Tri-City Drilling was made on 9/26/18, with no answer, and a voicemail left requesting a callback.
 +
|-
 +
| 1543419519
 +
| 2018-11-28
 +
| Production Wells
 +
| No Violations
 +
| On this day, I am conducting a compliance notice follow-up inspection in regard to Complaint #5927. No progress has been conducted to regain compliance. On 11/28/2018, I spoke with Greg Nuzum of Tri-City Drilling, and he indicated that he has made contact with his contractor, but the contractor has been unavailable due to engagements with other activities. I reiterated that progress needs to be made, and he will need to attempt to commence work to address the issues.
 +
|-
 +
| 1919256692
 +
| 2018-08-20
 +
| Production Wells
 +
| No Violations
 +
| On this day, I am conducting a follow-up inspection from 08/17/2018 to gather additional information regarding the footage spacing of the separator.
 +
|-
 +
| 1962306577
 +
| 2019-04-12
 +
| Production Wells
 +
| No Violations
 +
| On this day, I am conducting a compliance notice follow-up inspection in regard to Complaint #5927. No progress has been made to gain compliance. On 4/12/19, I spoke with Greg Nuzum of Tri-City Drilling, and he stated that the weather and health issues had prohibited the work to be conducted throughout the winter months. I explained that progress needs to be made, and he is attempting to contact a contractor. Updated pictures were taken.
 +
|-
 +
|}
 +
==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Inspection ID
 +
!scope="col" style="text-align: center"| Violation ID
 +
!scope="col" style="text-align: center"| Violation Date
 +
!scope="col" style="text-align: center"| Violation Code
 +
!scope="col" style="text-align: center"| Violation Comments
 +
|-
 +
| 0905130921
 +
| US-OH-130330
 +
| 2018-08-30
 +
| 9-10-05
 +
| Failure to properly bury pipeline
 +
|-
 +
| 0905130921
 +
| US-OH-130331
 +
| 2018-08-30
 +
| 9-9-02
 +
| General Safety
 +
|-
 +
| 0905130921
 +
| US-OH-130332
 +
| 2018-08-30
 +
| 9-9-05(A)10
 +
| Failure to legibly identify well
 +
|-
 +
| 0905130921
 +
| US-OH-130333
 +
| 2018-08-30
 +
| 9-9-05(A)5
 +
| Violation of separator spacing requirements
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Ohio Department of Natural Resources RBDMS
+
  | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables
  | publisher = [http://oilandgas.ohiodnr.gov/]
+
  |publisher = [[Ohio Department of Natural Resources]]
  | date = 2015-06-19
+
  | date = 2019-05-07
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
+
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2015-06-20 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
== References ==
+
==References==
{{reflist}}
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Ohio Wells]]

Revision as of 06:11, 30 July 2019

Well Details

Well ID: 34-167-23905
Loading map...
Country: United States
State: Ohio
County: Washington
Municipality: Barlow Township
Operator Name: TRI-CITY DRILLING JOINT VENTUR
Well Pad ID:
Farm/Lease Name: CARVER NORVAL
License Status: Producing
License Date: 1982-12-28
Spud Date: 1977-09-25
Spud Drilling Contractor:
Final Drill Date: 1977-10-20
Well Total Depth: 1287 ft
Configuration: Vertical
Latitude: 39.386097432
Longitude: -81.63112261

For data sources see[1]

Well History

Well Status Well Status Date Comment
Original Spud 1977-09-25
Completed 1977-10-20
Reached Total Depth 1977-10-20
CO 1982-12-28 1331 TRI-CITY DRILL JOINT VENT GeoDate 12/28/82
Record Last Modified 2013-10-03

For data sources see[2]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2018 TRI-CITY DRILLING JOINT VENTUR 278 0 365

For data sources see[3] [4]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2018 TRI-CITY DRILLING JOINT VENTUR Brine 0 365

For data sources see[5] [6]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0858515313 2006-08-16 Production Wells No Violations Inspection this day found well producing with jack, tank has good IDs, needs more dike.
0905130921 2018-08-17 Production Wells Violations Noted On this day, I am conducting an inspection in reference to Complaint #5927. Landowner, Connie and Randall Reid expressed concerns of safety with an exposed 1 inch diameter plastic flowline along their drive. They requested that the flowline be buried. I found approximately 125 feet of exposed 1 inch plastic line along the drive. The well is equipped with 4.5 inch diameter casing and 2.375 inch diameter tubing with the production valves open. The well appears to show signs of recent activity. There are (2) 100 barrel steel tanks, but only 1 within an earthen dike. It will be noted that there is a vertical separator near the wellhead, within less than 20 feet, which does not meet the spacing requirements of 50 feet minimum spacing from the wellhead. The identification at the tank is faded and needs updated, and annual production has never been reported. Multiple pictures were taken. An attempt to contact Tri-City Drilling was made on 8/21/2018, and spoke with Greg Nuzum, to inform him of the issues and time frame for remediation. To bring the well within compliance, the following will need to be conducted. 1) Bury the gas line approximately 24 inches 2) Move the separator within 50 feet minimum of the wellhead 3) Properly identify the wellhead and/or tanks.
0996162826 2018-09-26 Production Wells No Violations On this day, I am conducting a compliance notice follow-up inspection in regard to Complaint #5927. There has been no progress made to remediate the issues and get the well back within compliance. The section of pipeline that was requested to be buried is above ground, the identification is not updated, and the separator has not been adjusted to the minimum 50 setback from the wellhead. Updated pictures were taken. An attempt to contact Greg at Tri-City Drilling was made on 9/26/18, with no answer, and a voicemail left requesting a callback.
1543419519 2018-11-28 Production Wells No Violations On this day, I am conducting a compliance notice follow-up inspection in regard to Complaint #5927. No progress has been conducted to regain compliance. On 11/28/2018, I spoke with Greg Nuzum of Tri-City Drilling, and he indicated that he has made contact with his contractor, but the contractor has been unavailable due to engagements with other activities. I reiterated that progress needs to be made, and he will need to attempt to commence work to address the issues.
1919256692 2018-08-20 Production Wells No Violations On this day, I am conducting a follow-up inspection from 08/17/2018 to gather additional information regarding the footage spacing of the separator.
1962306577 2019-04-12 Production Wells No Violations On this day, I am conducting a compliance notice follow-up inspection in regard to Complaint #5927. No progress has been made to gain compliance. On 4/12/19, I spoke with Greg Nuzum of Tri-City Drilling, and he stated that the weather and health issues had prohibited the work to be conducted throughout the winter months. I explained that progress needs to be made, and he is attempting to contact a contractor. Updated pictures were taken.

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
0905130921 US-OH-130330 2018-08-30 9-10-05 Failure to properly bury pipeline
0905130921 US-OH-130331 2018-08-30 9-9-02 General Safety
0905130921 US-OH-130332 2018-08-30 9-9-05(A)10 Failure to legibly identify well
0905130921 US-OH-130333 2018-08-30 9-9-05(A)5 Violation of separator spacing requirements

For data sources see[7]

References