X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-111-20309"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-111-20309
 
| Well ID: 37-111-20309
| style="height=100%; align=center" rowspan="14" | {{#display_map: 39.743556, -79.357639 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 39.743556, -79.357639 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 23: Line 23:
 
| Spud Date:  
 
| Spud Date:  
 
|-
 
|-
| Permit Date: 7/15/2011
+
| Permit Date: 2011-07-15
 
|-
 
|-
 
| Unconventional Well: Y
 
| Unconventional Well: Y
Line 49: Line 49:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 98: Line 123:
 
| 2088108
 
| 2088108
 
| Primary Facility
 
| Primary Facility
| 01/08/2012
+
| 2012-01-08
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 105: Line 130:
 
| 2093090
 
| 2093090
 
| Primary Facility
 
| Primary Facility
| 06/12/2012
+
| 2012-06-12
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 112: Line 137:
 
| 2094699
 
| 2094699
 
| Primary Facility
 
| Primary Facility
| 08/06/2012
+
| 2012-08-06
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 119: Line 144:
 
| 2094795
 
| 2094795
 
| Primary Facility
 
| Primary Facility
| 08/14/2012
+
| 2012-08-14
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 126: Line 151:
 
| 2095563
 
| 2095563
 
| Primary Facility
 
| Primary Facility
| 08/28/2012
+
| 2012-08-28
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 133: Line 158:
 
| 2107617
 
| 2107617
 
| Primary Facility
 
| Primary Facility
| 10/09/2012
+
| 2012-10-09
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 140: Line 165:
 
| 2120850
 
| 2120850
 
| Primary Facility
 
| Primary Facility
| 11/30/2012
+
| 2012-11-30
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 147: Line 172:
 
| 2123099
 
| 2123099
 
| Primary Facility
 
| Primary Facility
| 12/12/2012
+
| 2012-12-12
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 154: Line 179:
 
| 2337764
 
| 2337764
 
| Primary Facility
 
| Primary Facility
| 01/12/2015
+
| 2015-01-12
 
| Plugging(Includes Plugged/Mined Through)
 
| Plugging(Includes Plugged/Mined Through)
 
| No Violations Noted
 
| No Violations Noted
Line 189: Line 214:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Revision as of 06:16, 2 August 2019

Well Details

Well ID: 37-111-20309
Loading map...
Country: United States
State: Pennsylvania
County: Somerset
Municipality: Addison Township
Operator Name: CHIEF OIL & GAS LLC
Well Pad ID:
Farm/Lease Name: PMG ALLEN UNIT 2H
License Status:
Spud Date:
Permit Date: 2011-07-15
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 39.743556
Longitude: -79.357639

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0

For data sources see[4]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2088108 Primary Facility 2012-01-08 Routine/Complete Inspection No Violations Noted Routine inspection. No issues noted.
2093090 Primary Facility 2012-06-12 Routine/Complete Inspection No Violations Noted At the time of inspection, no E&S issues were present at the site.
2094699 Primary Facility 2012-08-06 Routine/Complete Inspection No Violations Noted At the time of inspection, no E&S issues were present at the site. Gas well was not in production
2094795 Primary Facility 2012-08-14 Routine/Complete Inspection No Violations Noted At the time of inspection, no E&S issues were present at the site. Gas well was not in production
2095563 Primary Facility 2012-08-28 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Gas well was not in production
2107617 Primary Facility 2012-10-09 Routine/Complete Inspection No Violations Noted At the time of inspection the Operator indicated that the well has not been drilled. The Erosion and Sedimentation plan was onsite and appeared to installed as outlined in the plan. No observation of accelerated erosion or sedimentation in relation to the well pad area or access road. The Department suggest the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site is maintained.
2120850 Primary Facility 2012-11-30 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Surface casing was set at 25feet from grade with 30 sacks of Type I (24” pipe).
2123099 Primary Facility 2012-12-12 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Conductor casing was set at 38feet from grade with 30 sacks of Type I (24” pipe). Water Protection pipe (16”) was set at 413 feet and was cemented with 421 sacks of Class A with 17 bbl. of return cement. Cement was completed on 12/12/12 at 1:00 hrs.
2337764 Primary Facility 2015-01-12 Plugging(Includes Plugged/Mined Through) No Violations Noted DEP inspected plugging of abandoned well on Penndot property. Yost drilling company set up on well. Yost opened well to 5200 feet. Gas was encountered at 1,400 feet. No other gas zones were encountered 9 5/8 inch pipe depth was 1460 feet. The remaining hole was open to bottom at 5,208 feet Wireline was run and was determined to set 6 cement plugs based on wireline results. In addition, the top 200 feet will be cemented with Class A cement and graded to Penndot specification at surface. At the time of inspection, no E&S issues were present at the site

For data sources see[5]

References