If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-021-20046 | |
Operator Name: ALLIANCE PETROLEUM CORP | |
First Permit Date: 1975-01-22 | |
Last Permit Date: 1975-01-22 | |
Spud Date: 1800-01-01 | |
Unconventional: No | |
Horizontal: No | |
Violations: None | |
Latitude: 40.695858 | |
Longitude: -78.718874 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2011-0 | 2341.68 | 365.0 | 0.0 | 0.0 | 0.01 | 365.0 |
2010-0 | 983.0 | 365.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2009-0 | 1163.0 | 365.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2009-0 | 969.0 | 365.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2007-0 | 1017.0 | 365.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2006-0 | 398.0 | 365.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2005-0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2004-0 | 106.0 | 365.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2003-0 | 338.0 | 363.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2002-0 | 507.0 | 365.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2001-0 | 451.0 | 365.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2000-0 | 113.0 | 365.0 | 0.0 | 0.0 | 0.0 | 0.0 |
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2011-0 | PRODUCED FLUID | 80.48 | Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0020346 | PUNXSUTAWNEY BORO STP | PUNXSUTAWNEY | PA |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
1891291 | 2010-06-09 | No Violations Noted | According to well records, permit was granted on 1/9/75 and well was drilled on 2/17/75 to depth of 3722 ft. Well head consisted of 8¿ pipe reduced to 4¿ reducer to 2¿ production line with multiple shut off valves. Production equipment consisted of data logger (10/5 psi), separator and 100 bbl brine tank (< 10 bbl fluid). Outside of brine tank heavily stained from former overspills. No signs of leakage of gas around wellhead. At the time of inspection, no E&S issues and possible IW issues with brine tank. |