If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-029-21813 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.68,"lon":-80.91,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Columbiana | |
Municipality: Franklin Township | |
Operator Name: EAP OHIO LLC | |
Well Pad ID: US-OH-000717 | |
Farm/Lease Name: PITTS 22-14-4 | |
License Status: Producing | |
License Date: 2013-05-20 | |
Spud Date: 2013-07-08 | |
Spud Drilling Contractor: NOMAC DRILLING CORP | |
Final Drill Date: 2013-08-14 | |
Well Total Depth: 13277.00 ft | |
Configuration: Horizontal | |
Latitude: 40.680000 | |
Longitude: -80.910000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-05-09 | Proposed Formations:TRENTON BLACK RIVER, Issued Date:5/9/2013, Expired Date:5/9/2015 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2013-05-20 | Proposed Formations:POINT PLEASANT, Issued Date:5/20/2013, Expired Date:5/20/2015 12:00:00 PM, Drilling unit acres:149.34, Proposed Well Type:OG, Proposed Well Class:EDPW |
Reached Total Depth | 2013-08-14 | |
Correction to Well | 2013-12-20 | CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGE AND COORDINATES) FROM AS DRILLED SURVEY PLAT. ELEVATION CHANGED TO 1168' AND UNIT SIZE INCREASED TO 459.64 ACRES. |
Correction to Well | 2014-07-11 | CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. |
Completion Report Received | 2015-01-09 | |
Construction Permit Expires | 2015-05-20 | |
Record Last Modified | 2019-06-11 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2014-11-04 | 8038 | 13023 | 540 |
8038 | 13023 | 540 | |
8038 | 13023 | 540 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 07/30/2014 | 08/02/2014 | 7883 | 4,774,980.0 | 336938 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Recycled Produced Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 4.884 | 0 |
Fresh Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 80.9895 | 0 | |
A264, B244, B317, D047, J218, J475,
J580, J609, J610, L058, Acid, Hydrochloric 15pct, Northern White Sand, 100 Mesh Sand |
SCHLUMBERGER | Anti-Bacterial Agent, Breaker, Corrosion Inhibitor, Cross Linker, Defoaming Agent, Friction Reducer, Gelling Agent, Iron Control Agent, Scale Inhibitor, Acid, Proppant - Natural | Potassium Hydroxide | 001310-58-3 | 15 | 0.00363 | 0 | |
Aliphatic acid | NA | 30 | 0.00056 | 0 | ||||
Carbohydrate polymer | NA | 100 | 0.04358 | 0 | ||||
Ammonium Sulfate | 007783-20-2 | 30 | 0.02037 | 0 | ||||
Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 100 | 9.08048 | 0 | ||||
Propargyl Alcohol (2-Propynol) | 000107-19-7 | 10 | 0.00019 | 0 | ||||
Sodium Erythorbate | 006381-77-7 | 100 | 0.0006 | 0 | ||||
Hydrogen Chloride | 007647-01-0 | 15 | 0.16233 | 0 | ||||
Glutaraldehyde (Pentanediol) | 000111-30-8 | 25 | 0.00569 | 0 | ||||
Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 100 | 3.78719 | 0 | ||||
Polypropylene glycol | 025322-69-4 | 100 | 0.00021 | 0 | ||||
Aliphatic amine polymer | NA | 30 | 0.02037 | 0 | ||||
Aliphatic alcohols, ethoxylated # 1 | NA | 30 | 0.00056 | 0 | ||||
Methanol (Methyl Alcohol) | 000067-56-1 | 40 | 0.00075 | 0 | ||||
Ammonium Persulfate | 007727-54-0 | 100 | 0.00183 | 0 | ||||
Trisodium Ortho Phosphate | 007601-54-9 | 5 | 0.00066 | 0 | ||||
Water | 007732-18-5 | 85 | 0.91985 | 0 | ||||
Ethylene Glycol | 000107-21-1 | 5 | 0.00066 | 0 | ||||
Aliphatic polyol | NA | 30 | 0.00726 | 0 | ||||
Ammonium Persulfate | 007727-54-0 | 100 | 0.00052 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2014-07-30 | H2O | 15 | 4146 Bbl | 335941 | Schlumberger | STAGE 1/18
30 SHOTS STAGES 2-17 SEE IMAGES |
2014-08-02 | H2O | 15 | 3950 Bbl | 332381 | Schlumberger | STAGE 18/18
30 SHOTS |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | CHESAPEAKE EXPLORATION LLC | 199880 | 1633 | 47 |
2015 | CHESAPEAKE EXPLORATION LLC | 834762 | 1822 | 336 |
2016 | CHESAPEAKE EXPLORATION LLC | 539639 | 655 | 351 |
2017 | CHESAPEAKE EXPLORATION LLC | 356478 | 272 | 365 |
2018 | CHESAPEAKE EXPLORATION LLC | 273221 | 129 | 365 |
2019 | CHESAPEAKE EXPLORATION LLC | 61257 | 25 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | CHESAPEAKE EXPLORATION LLC | Brine | 4587 | 47 |
2015 | CHESAPEAKE EXPLORATION LLC | Brine | 3623 | 336 |
2016 | CHESAPEAKE EXPLORATION LLC | Brine | 2219 | 351 |
2017 | CHESAPEAKE EXPLORATION LLC | Brine | 2578 | 365 |
2018 | CHESAPEAKE EXPLORATION LLC | Brine | 1444 | 365 |
2019 | CHESAPEAKE EXPLORATION LLC | Brine | 312 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-318589889 | 2016-3-29 0:00: | PW | No Violations | |
-85996772 | 2017-1-30 0:00: | PW | No Violations | 1.00 |
0025229357 | 2013-07-09 | Casing String Witnessed | No Violations | |
0085996772 | 2017-01-30 | Production Wells | No Violations | The purpose for my inspection was to conduct a status check on well (#2-1813-00- |
0216272362 | 2013-07-14 | Drill / Deepen / Reopen | No Violations | While in the area for a cement job at another location, I stopped by to check on the move-in progress of the drilling rig. I found that preparations were underway, but no rig equipment was on site. Mat boards were down, secondary containment was staged, and a number of frac tanks and light plants were in place. |
0318589889 | 2016-03-29 | Production Wells | No Violations | I was on location for a status check. My inspection found the access road gate locked and the
access road is in good repair. An identification sign at the access road entrance, well, and tank battery. The pad is fenced and all man doors are locked. The #3H well is in production. The well is equipped with a christmas tree valve assembly. There is a steel dike around the tank battery. The equipment on the pad consists of the following: 6 - Storage tanks 400 bbl 1 - Vapor recovery unit (VRU) 6 - Gas processing units (GPU) 1 - Vertical separator 6 - Sand separator 1 - Thermal electric generator 6 - Producing wells Site fenced and man doors locked |
1373981969 | 2013-04-17 | Surface Facility Construction | No Violations | I went to the site and conducted a pre-construction site inspection with Steve Ault, Chesapeake Field Representative. |
1377620091 | 2013-08-07 | Casing String Witnessed | No Violations | |
1459494311 | 2013-07-08 | Drill / Deepen / Reopen | No Violations | I stopped at the drilling pad to check on the conductor rig move-in progress. I found the pad largely built. The chain link fence to surround the pad was not yet installed. The dirt work appeared completed, and erosion prevention measures have been taken. The conductor rig was not yet on location. While there, a truck with conductor casing did arrive. The Pitts 22-14-4 3H and 8H were both staked. I took GPS readings for both wells, and the access road entry. |
1827520055 | 2014-12-11 | Preliminary Restoration | No Violations
-lined and sealed secondary containment. There are concrete barriers protecting the containment from vehicles. There are e-stops outside the barriers, and the tanks are grounded, and have static dissipaters. There is a truck grounding area for trucks collecting condensate and/or produced water. Along the interior of the chain link fence there are two site drains installed. There is an earthen berm, with well-established ground cover. The soil stockpile is well stabilized with vegetation. Crops, woodlands and/or underbrush are growing normally outside the area of disturbance. Drainage and erosion controls outside the pad are in place and functioning. A closed-loop, above-ground drilling pit system was used, so there are no earthen pits requiring closure. Preliminary | |
2115648082 | 2013-08-05 | Casing String Witnessed | No Violations | |
216272362 | 2013-7-14 0:00: | DD | No Violations | |
25229357 | 2013-7-9 0:00:0 | CS | No Violations | |
604802667 | 2020-7-8 0:00:0 | PW | No Violations | 1.00 |
For data sources see[10]