X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-029-21813

Well Details

Well ID: 34-029-21813
Loading map...
Country: United States
State: Ohio
County: Columbiana
Municipality: Franklin Township
Operator Name: EAP OHIO LLC
Well Pad ID: US-OH-000717
Farm/Lease Name: PITTS 22-14-4
License Status: Producing
License Date: 2013-05-20
Spud Date: 2013-07-08
Spud Drilling Contractor: NOMAC DRILLING CORP
Final Drill Date: 2013-08-14
Well Total Depth: 13277.00 ft
Configuration: Horizontal
Latitude: 40.680000
Longitude: -80.910000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-05-09 Proposed Formations:TRENTON BLACK RIVER, Issued Date:5/9/2013, Expired Date:5/9/2015 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2013-05-20 Proposed Formations:POINT PLEASANT, Issued Date:5/20/2013, Expired Date:5/20/2015 12:00:00 PM, Drilling unit acres:149.34, Proposed Well Type:OG, Proposed Well Class:EDPW
Reached Total Depth 2013-08-14
Correction to Well 2013-12-20 CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGE AND COORDINATES) FROM AS DRILLED SURVEY PLAT. ELEVATION CHANGED TO 1168' AND UNIT SIZE INCREASED TO 459.64 ACRES.
Correction to Well 2014-07-11 CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT.
Completion Report Received 2015-01-09
Construction Permit Expires 2015-05-20
Record Last Modified 2019-06-11

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2014-11-04 8038 13023 540
8038 13023 540
8038 13023 540

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 07/30/2014 08/02/2014 7883 4,774,980.0 336938

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Recycled Produced Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 4.884 0
Fresh Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 80.9895 0
A264, B244, B317, D047, J218, J475,

J580, J609, J610, L058, Acid, Hydrochloric 15pct, Northern White Sand, 100 Mesh Sand

SCHLUMBERGER Anti-Bacterial Agent, Breaker, Corrosion Inhibitor, Cross Linker, Defoaming Agent, Friction Reducer, Gelling Agent, Iron Control Agent, Scale Inhibitor, Acid, Proppant - Natural Potassium Hydroxide 001310-58-3 15 0.00363 0
Aliphatic acid NA 30 0.00056 0
Carbohydrate polymer NA 100 0.04358 0
Ammonium Sulfate 007783-20-2 30 0.02037 0
Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 100 9.08048 0
Propargyl Alcohol (2-Propynol) 000107-19-7 10 0.00019 0
Sodium Erythorbate 006381-77-7 100 0.0006 0
Hydrogen Chloride 007647-01-0 15 0.16233 0
Glutaraldehyde (Pentanediol) 000111-30-8 25 0.00569 0
Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 100 3.78719 0
Polypropylene glycol 025322-69-4 100 0.00021 0
Aliphatic amine polymer NA 30 0.02037 0
Aliphatic alcohols, ethoxylated # 1 NA 30 0.00056 0
Methanol (Methyl Alcohol) 000067-56-1 40 0.00075 0
Ammonium Persulfate 007727-54-0 100 0.00183 0
Trisodium Ortho Phosphate 007601-54-9 5 0.00066 0
Water 007732-18-5 85 0.91985 0
Ethylene Glycol 000107-21-1 5 0.00066 0
Aliphatic polyol NA 30 0.00726 0
Ammonium Persulfate 007727-54-0 100 0.00052 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2014-07-30 H2O 15 4146 Bbl 335941 Schlumberger STAGE 1/18

30 SHOTS STAGES 2-17 SEE IMAGES

2014-08-02 H2O 15 3950 Bbl 332381 Schlumberger STAGE 18/18

30 SHOTS

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2014 CHESAPEAKE EXPLORATION LLC 199880 1633 47
2015 CHESAPEAKE EXPLORATION LLC 834762 1822 336
2016 CHESAPEAKE EXPLORATION LLC 539639 655 351
2017 CHESAPEAKE EXPLORATION LLC 356478 272 365
2018 CHESAPEAKE EXPLORATION LLC 273221 129 365
2019 CHESAPEAKE EXPLORATION LLC 61257 25 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2014 CHESAPEAKE EXPLORATION LLC Brine 4587 47
2015 CHESAPEAKE EXPLORATION LLC Brine 3623 336
2016 CHESAPEAKE EXPLORATION LLC Brine 2219 351
2017 CHESAPEAKE EXPLORATION LLC Brine 2578 365
2018 CHESAPEAKE EXPLORATION LLC Brine 1444 365
2019 CHESAPEAKE EXPLORATION LLC Brine 312 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-318589889 2016-3-29 0:00: PW No Violations
-85996772 2017-1-30 0:00: PW No Violations 1.00
0025229357 2013-07-09 Casing String Witnessed No Violations
0085996772 2017-01-30 Production Wells No Violations The purpose for my inspection was to conduct a status check on well (#2-1813-00-
0216272362 2013-07-14 Drill / Deepen / Reopen No Violations While in the area for a cement job at another location, I stopped by to check on the move-in progress of the drilling rig. I found that preparations were underway, but no rig equipment was on site. Mat boards were down, secondary containment was staged, and a number of frac tanks and light plants were in place.
0318589889 2016-03-29 Production Wells No Violations I was on location for a status check. My inspection found the access road gate locked and the

access road is in good repair. An identification sign at the access road entrance, well, and tank battery. The pad is fenced and all man doors are locked. The #3H well is in production. The well is equipped with a christmas tree valve assembly. There is a steel dike around the tank battery. The equipment on the pad consists of the following: 6 - Storage tanks 400 bbl 1 - Vapor recovery unit (VRU) 6 - Gas processing units (GPU) 1 - Vertical separator 6 - Sand separator

1 - Thermal electric generator 6 - Producing wells Site fenced and man doors locked

1373981969 2013-04-17 Surface Facility Construction No Violations I went to the site and conducted a pre-construction site inspection with Steve Ault, Chesapeake Field Representative.
1377620091 2013-08-07 Casing String Witnessed No Violations
1459494311 2013-07-08 Drill / Deepen / Reopen No Violations I stopped at the drilling pad to check on the conductor rig move-in progress. I found the pad largely built. The chain link fence to surround the pad was not yet installed. The dirt work appeared completed, and erosion prevention measures have been taken. The conductor rig was not yet on location. While there, a truck with conductor casing did arrive. The Pitts 22-14-4 3H and 8H were both staked. I took GPS readings for both wells, and the access road entry.
1827520055 2014-12-11 Preliminary Restoration No Violations

-lined and sealed secondary containment. There are concrete barriers protecting the containment from vehicles. There are e-stops outside the barriers, and the tanks are grounded, and have static dissipaters. There is a truck grounding area for trucks collecting condensate and/or produced water. Along the interior of the chain link fence there are two site drains installed. There is an earthen berm, with well-established ground cover. The soil stockpile is well stabilized with vegetation. Crops, woodlands and/or underbrush are growing normally outside the area of disturbance. Drainage and erosion controls outside the pad are in place and functioning. A closed-loop, above-ground drilling pit system was used, so there are no earthen pits requiring closure. Preliminary

2115648082 2013-08-05 Casing String Witnessed No Violations
216272362 2013-7-14 0:00: DD No Violations
25229357 2013-7-9 0:00:0 CS No Violations
604802667 2020-7-8 0:00:0 PW No Violations 1.00

For data sources see[10]

References