If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-111-24325 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.67,"lon":-81.2,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Monroe | |
Municipality: Washington Township | |
Operator Name: GULFPORT APPALACHIA LLC | |
Well Pad ID: US-OH-000471 | |
Farm/Lease Name: WHITACRE ENTERPRISES INC | |
License Status: Producing | |
License Date: 2012-04-05 | |
Spud Date: 2013-05-17 | |
Spud Drilling Contractor: H A D INC | |
Final Drill Date: 2013-11-06 | |
Well Total Depth: 16316.00 ft | |
Configuration: Horizontal | |
Latitude: 39.670000 | |
Longitude: -81.200000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2012-04-05 | Proposed Formations:UTICA SHALE, Issued Date:4/5/2012, Expired Date:4/5/2014 12:00:00 PM, Drilling unit acres:484.286, Proposed Well Type:OG, Proposed Well Class:EDPW |
Reached Total Depth | 2013-11-06 | |
Construction Permit Expires | 2014-04-05 | |
Completion Report Received | 2014-08-13 | |
Change of Owner | 2015-02-25 | Operator changed from 8793, HG ENERGY LLC to 9193, AMERICAN ENERGY UTICA LLC |
Change of Owner | 2015-06-19 | Operator changed from 9193, AMERICAN ENERGY UTICA LLC to 8799, GULFPORT ENERGY CORPORATION |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2014-09-29 | 8860 | 14251 | 390 |
8860 | 14251 | 390 | |
8860 | 14251 | 390 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2014-05-05 | H2O | 0 | 6675 Bbl | 315000 | Producers Service Corporation | Stage 37 to be stimulated- 50 perforations in 5 staggered clusters, solid completion plug at 10,704'.
STAGES 1-36,38-40 SEE IMAGES |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | AMERICAN ENERGY UTICA LLC | 1929331 | 0 | 182 |
2015 | GULFPORT ENERGY CORPORATION | 1346489 | 0 | 316 |
2016 | GULFPORT ENERGY CORPORATION | 799068 | 0 | 277 |
2017 | GULFPORT ENERGY CORPORATION | 271159 | 0 | 173 |
2018 | GULFPORT ENERGY CORPORATION | 412218 | 0 | 362 |
2019 | GULFPORT ENERGY CORPORATION | 83299 | 0 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | AMERICAN ENERGY UTICA LLC | Brine | 30723 | 182 |
2015 | GULFPORT ENERGY CORPORATION | Brine | 10390 | 285 |
2016 | GULFPORT ENERGY CORPORATION | Brine | 10077 | 277 |
2017 | GULFPORT ENERGY CORPORATION | Brine | 17065 | 173 |
2018 | GULFPORT ENERGY CORPORATION | Brine | 13801 | 362 |
2019 | GULFPORT ENERGY CORPORATION | Brine | 2451 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1628865842 | 2013-10-21 0:00 | DD | No Violations | 1.50 |
-2121296254 | 2013-10-22 0:00 | DD | No Violations | |
-221810204 | 2015-6-18 0:00: | PL | No Violations | 1.00 |
-269026449 | 2017-6-27 0:00: | PW | No Violations | 0.50 |
-280740846 | 2013-11-7 0:00: | DD | No Violations | 2.30 |
-469282613 | 2013-5-17 0:00: | DD | No Violations | |
-600292661 | 2020-3-24 0:00: | PW | No Violations | 1.00 |
0221810204 | 2015-06-18 | Preliminary Restoration | No Violations | Preliminary Restoration Status check inspection found the well location meets 1509.072 with vegetation established and erosion control in place. The well has been drilled and stimulated. There is 6 gas processing units on place on location to support each of the 6 wells present in which at this current time all 6 have been drilled but only 3 completed and in production with a total of 6 -210 barrel capacity production fluid tanks present in a plastic lined metal containment dike. In conversation with the newly acquired owners Gulfport Energy they intend on making changes to the well pad perimeter containment by adding functional drain valves at the discharge points along with rebuilding the well pad earthen containment berm. |
0269026449 | 2017-06-27 | Production Wells | No Violations | Status check inspection found 6 wells present on location and in production. All wells are equipped with tubing heads and the production valves are in the open position. A total of 6 gas processing units are present on location. A total of 6 production tanks are present inside a polymer lined steel containment dike area. Proper signage is posted at the well pad entrance on the day of my inspection. |
0280740846 | 2013-11-07 | Drill / Deepen / Reopen | No Violations | Status check inspection after receiving notification from the company man on site that the total drilling depth has been reached at 16,316, at casing tally was received and the company is running production casing. |
0469282613 | 2013-05-17 | Drill / Deepen / Reopen | No Violations | The said well was spudded on this day with 80 of 3/8 wall- 20 diameter conductor being set with no annular space. |
1318573238 | 2014-05-05 | Completion Testing | No Violations | Stage 37 to be stimulated in cased hole by Producers services with 50 perforations in 5 clusters from 10,579 to 10,679 with a solid completion plug at 10,704 and a treating pressure of 8,079 psi. The annular pressure is being monitored electronically. |
1381846492 | 2013-10-15 | Drill / Deepen / Reopen | No Violations | Status check inspection found that the drilling rig HAD 105 is rigged up on the hole preparing to respud, after they complete some rig repairs. |
1382914500 | 2013-10-27 | Drill / Deepen / Reopen | No Violations | Inspection of the drill site and update on the drilling progress found the current drilling depth to be 8377 with the company running in the hole with their directional tools to begin drilling their horizontal curve on oil based drilling fluid. Records were received from the recent 9.625 casing string set at a measured depth of 8343 at the casing shoe. |
1395254425 | 2014-03-19 | Completion Testing | No Violations | Status check on site inspection to witness the 5.5 production casing pressure test, the casing and well head assembly was tested as one part on the low pressure side at 500 psi, the well head lower valve was the closed and the well head pressure tested to 9995 psi, the pressure was the bled off and the main valve opened and the casing tested in 3 pressure increments beginning at 1500 psi then 2500 psi and a final pressure of 7700 psi and the pressure was held for 15 minuets with no recorded loss, the casing toe sleeve valve was the opened by increasing the pressure to 8700 psi completing the test procedure. |
1424966955 | 2015-02-26 | Preliminary Restoration | No Violations | Preliminary Restoration status check inspection found a production tree present at the well head with the production valve in the open position with a flow line leading into a gas processing unit. There is 6-200 barrel capacity production tanks located inside a mechanical dike area. Preliminary Restoration passed on this day. |
1628865842 | 2013-10-21 | Drill / Deepen / Reopen | No Violations | Accompanied Inspector Bill Stolarik on inspection. Total depth at the time of inspection was 6805 ft. A 12.25 in drill bit was being used at that time. Spoke with company men on site. |
1630250101 | 2013-10-21 | Drill / Deepen / Reopen | No Violations | Status check inspection of the drilling process found the current drilling depth to be 6806 using a 12.250 diameter hammer drill bit assembly. |
2121296254 | 2013-10-22 | Drill / Deepen / Reopen | No Violations | Inspection found the company running back in the hole with their drill string after a 12.250bit change. |
For data sources see[9]