X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-111-24325

Well Details

Well ID: 34-111-24325
Loading map...
Country: United States
State: Ohio
County: Monroe
Municipality: Washington Township
Operator Name: GULFPORT APPALACHIA LLC
Well Pad ID: US-OH-000471
Farm/Lease Name: WHITACRE ENTERPRISES INC
License Status: Producing
License Date: 2012-04-05
Spud Date: 2013-05-17
Spud Drilling Contractor: H A D INC
Final Drill Date: 2013-11-06
Well Total Depth: 16316.00 ft
Configuration: Horizontal
Latitude: 39.670000
Longitude: -81.200000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2012-04-05 Proposed Formations:UTICA SHALE, Issued Date:4/5/2012, Expired Date:4/5/2014 12:00:00 PM, Drilling unit acres:484.286, Proposed Well Type:OG, Proposed Well Class:EDPW
Reached Total Depth 2013-11-06
Construction Permit Expires 2014-04-05
Completion Report Received 2014-08-13
Change of Owner 2015-02-25 Operator changed from 8793, HG ENERGY LLC to 9193, AMERICAN ENERGY UTICA LLC
Change of Owner 2015-06-19 Operator changed from 9193, AMERICAN ENERGY UTICA LLC to 8799, GULFPORT ENERGY CORPORATION
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2014-09-29 8860 14251 390
8860 14251 390
8860 14251 390

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2014-05-05 H2O 0 6675 Bbl 315000 Producers Service Corporation Stage 37 to be stimulated- 50 perforations in 5 staggered clusters, solid completion plug at 10,704'.

STAGES 1-36,38-40 SEE IMAGES

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2014 AMERICAN ENERGY UTICA LLC 1929331 0 182
2015 GULFPORT ENERGY CORPORATION 1346489 0 316
2016 GULFPORT ENERGY CORPORATION 799068 0 277
2017 GULFPORT ENERGY CORPORATION 271159 0 173
2018 GULFPORT ENERGY CORPORATION 412218 0 362
2019 GULFPORT ENERGY CORPORATION 83299 0 90

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2014 AMERICAN ENERGY UTICA LLC Brine 30723 182
2015 GULFPORT ENERGY CORPORATION Brine 10390 285
2016 GULFPORT ENERGY CORPORATION Brine 10077 277
2017 GULFPORT ENERGY CORPORATION Brine 17065 173
2018 GULFPORT ENERGY CORPORATION Brine 13801 362
2019 GULFPORT ENERGY CORPORATION Brine 2451 90

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1628865842 2013-10-21 0:00 DD No Violations 1.50
-2121296254 2013-10-22 0:00 DD No Violations
-221810204 2015-6-18 0:00: PL No Violations 1.00
-269026449 2017-6-27 0:00: PW No Violations 0.50
-280740846 2013-11-7 0:00: DD No Violations 2.30
-469282613 2013-5-17 0:00: DD No Violations
-600292661 2020-3-24 0:00: PW No Violations 1.00
0221810204 2015-06-18 Preliminary Restoration No Violations Preliminary Restoration Status check inspection found the well location meets 1509.072 with vegetation established and erosion control in place. The well has been drilled and stimulated. There is 6 gas processing units on place on location to support each of the 6 wells present in which at this current time all 6 have been drilled but only 3 completed and in production with a total of 6 -210 barrel capacity production fluid tanks present in a plastic lined metal containment dike. In conversation with the newly acquired owners Gulfport Energy they intend on making changes to the well pad perimeter containment by adding functional drain valves at the discharge points along with rebuilding the well pad earthen containment berm.
0269026449 2017-06-27 Production Wells No Violations Status check inspection found 6 wells present on location and in production. All wells are equipped with tubing heads and the production valves are in the open position. A total of 6 gas processing units are present on location. A total of 6 production tanks are present inside a polymer lined steel containment dike area. Proper signage is posted at the well pad entrance on the day of my inspection.
0280740846 2013-11-07 Drill / Deepen / Reopen No Violations Status check inspection after receiving notification from the company man on site that the total drilling depth has been reached at 16,316, at casing tally was received and the company is running production casing.
0469282613 2013-05-17 Drill / Deepen / Reopen No Violations The said well was spudded on this day with 80 of 3/8 wall- 20 diameter conductor being set with no annular space.
1318573238 2014-05-05 Completion Testing No Violations Stage 37 to be stimulated in cased hole by Producers services with 50 perforations in 5 clusters from 10,579 to 10,679 with a solid completion plug at 10,704 and a treating pressure of 8,079 psi. The annular pressure is being monitored electronically.
1381846492 2013-10-15 Drill / Deepen / Reopen No Violations Status check inspection found that the drilling rig HAD 105 is rigged up on the hole preparing to respud, after they complete some rig repairs.
1382914500 2013-10-27 Drill / Deepen / Reopen No Violations Inspection of the drill site and update on the drilling progress found the current drilling depth to be 8377 with the company running in the hole with their directional tools to begin drilling their horizontal curve on oil based drilling fluid. Records were received from the recent 9.625 casing string set at a measured depth of 8343 at the casing shoe.
1395254425 2014-03-19 Completion Testing No Violations Status check on site inspection to witness the 5.5 production casing pressure test, the casing and well head assembly was tested as one part on the low pressure side at 500 psi, the well head lower valve was the closed and the well head pressure tested to 9995 psi, the pressure was the bled off and the main valve opened and the casing tested in 3 pressure increments beginning at 1500 psi then 2500 psi and a final pressure of 7700 psi and the pressure was held for 15 minuets with no recorded loss, the casing toe sleeve valve was the opened by increasing the pressure to 8700 psi completing the test procedure.
1424966955 2015-02-26 Preliminary Restoration No Violations Preliminary Restoration status check inspection found a production tree present at the well head with the production valve in the open position with a flow line leading into a gas processing unit. There is 6-200 barrel capacity production tanks located inside a mechanical dike area. Preliminary Restoration passed on this day.
1628865842 2013-10-21 Drill / Deepen / Reopen No Violations Accompanied Inspector Bill Stolarik on inspection. Total depth at the time of inspection was 6805 ft. A 12.25 in drill bit was being used at that time. Spoke with company men on site.
1630250101 2013-10-21 Drill / Deepen / Reopen No Violations Status check inspection of the drilling process found the current drilling depth to be 6806 using a 12.250 diameter hammer drill bit assembly.
2121296254 2013-10-22 Drill / Deepen / Reopen No Violations Inspection found the company running back in the hole with their drill string after a 12.250bit change.

For data sources see[9]

References