X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0154180316000

Well Details

Well ID: 0154180316000
Loading map...
Location: 00/16-03-015-18W4/0
Location Alias: 00/16-03-15-18 W4M
Location Alias 2: 00/16-03-015-18 W4/00
Country: Canada
Province: Alberta
Township: 015
Meridian: 4
Range: 18
Section: 03
County/Municipality: Municipal District of Taber
Well Name: TANDEM LBOW 16-3-15-18
Operator Name: Tandem Energy Corporation
License Number: 0085111
License Date: 1980-08-21
License Status: Abandoned
Spud Date: 1980-08-27
Final Drill Date: 1980-09-03
Well Total Depth: 1110.00 m
Surface Hole Latitude: 50.235836
Surface Hole Longitude: -112.388105

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-08-21 Obtained License
1980-09-03 Finished Drilling
1980-09-04 Drill Stem Test Performed
1980-09-05 Drill Stem Test Performed
1980-09-06 Production Casing Operation Performed
1980-11-10 Perforation Treatment Performed - Cement Squeeze
1980-11-10 Perforation Treatment Performed - Jet Perforation
1980-11-12 Perforation Treatment Performed - Jet Perforation
1980-11-21 Well Mode changed to Drilled and Cased
1986-06-21 Well Began Production
1986-06-21 Well Fluid changed to Gas
1986-06-21 Well Mode changed to Flowing
2011-01-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-01-22 Perforation Treatment Performed - Cement Squeeze
2011-01-22 Plug Back Performed
2011-01-22 Well Fluid changed to Gas
2011-01-22 Well Mode changed to Abandoned Zone
2011-02-24 Well Log Performed
2011-06-14 Perforation Treatment Performed - Cement Squeeze
2011-06-14 Perforation Treatment Performed - Jet Perforation
2011-07-22 Perforation Treatment Performed - Jet Perforation
2011-07-22 Well Log Performed
2011-07-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-07-23 Perforation Treatment Performed - Cement Squeeze
2011-12-02 Perforation Treatment Performed - Jet Perforation
2011-12-02 Well Log Performed
2012-01-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-01-12 Perforation Treatment Performed - Cement Squeeze
2012-01-12 Well Abandoned
2012-01-12 Well Fluid changed to Gas
2012-01-12 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-11-10 Perforation 895.00 895.00 0
2011-07-23 Packing Device Capped w/Cement 173.80 185.80 0
2011-12-02 Perforation 173.00 177.00 17
2012-01-12 Cement Squeeze 173.00 177.00 0
2012-01-12 Packing Device Capped w/Cement 158.50 167.50 0
1980-11-10 Cement Squeeze 845.00 895.00 0
1980-11-12 Perforation 891.00 892.00 7
2011-01-22 Cement Squeeze 891.00 892.00 0
2011-01-22 Packing Device Capped w/Cement 878.80 886.80 0
2011-06-14 Perforation 286.00 290.00 17
2011-06-14 Cement Squeeze 286.00 290.00 0
2011-07-22 Perforation 193.00 197.00 17
2011-07-23 Cement Squeeze 193.00 197.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 2718 0.0 0.0 0.0
1987 7336 0.0 0.0 0.0
1988 5797 0.0 0.0 0.0
1989 6941 0.0 0.0 0.0
1990 7883 0.0 0.0 0.0
1991 7844 0.0 0.0 0.0
1992 8453 0.0 0.0 0.0
1993 7985 0.0 0.0 0.0
1994 8319 0.0 0.0 0.0
1995 8725 0.0 0.0 0.0
1996 7797 0.0 0.0 0.0
1997 7517 0.0 0.0 0.0
1998 7683 0.0 0.0 0.0
1999 7367 0.0 0.0 0.0
2000 8233 0.0 0.0 0.0
2001 5376 0.0 0.0 0.0
2002 7896 0.0 0.0 0.0
2003 5350 0.0 0.0 0.0
2004 7885 0.0 0.0 0.0
2005 6441 0.0 0.0 0.0
2006 1564 0.0 0.0 0.0
2007 56 0.0 0.0 0.0
2008 17 0.0 0.0 0.0

For data sources see[5]

References