If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0154180316000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.235836,"lon":-112.388105,"icon":""}]} |
Location: 00/16-03-015-18W4/0 | |
Location Alias: 00/16-03-15-18 W4M | |
Location Alias 2: 00/16-03-015-18 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 015 | |
Meridian: 4 | |
Range: 18 | |
Section: 03 | |
County/Municipality: Municipal District of Taber | |
Well Name: TANDEM LBOW 16-3-15-18 | |
Operator Name: Tandem Energy Corporation | |
License Number: 0085111 | |
License Date: 1980-08-21 | |
License Status: Abandoned | |
Spud Date: 1980-08-27 | |
Final Drill Date: 1980-09-03 | |
Well Total Depth: 1110.00 m | |
Surface Hole Latitude: 50.235836 | |
Surface Hole Longitude: -112.388105 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1980-08-21 | Obtained License |
1980-09-03 | Finished Drilling |
1980-09-04 | Drill Stem Test Performed |
1980-09-05 | Drill Stem Test Performed |
1980-09-06 | Production Casing Operation Performed |
1980-11-10 | Perforation Treatment Performed - Cement Squeeze |
1980-11-10 | Perforation Treatment Performed - Jet Perforation |
1980-11-12 | Perforation Treatment Performed - Jet Perforation |
1980-11-21 | Well Mode changed to Drilled and Cased |
1986-06-21 | Well Began Production |
1986-06-21 | Well Fluid changed to Gas |
1986-06-21 | Well Mode changed to Flowing |
2011-01-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-01-22 | Perforation Treatment Performed - Cement Squeeze |
2011-01-22 | Plug Back Performed |
2011-01-22 | Well Fluid changed to Gas |
2011-01-22 | Well Mode changed to Abandoned Zone |
2011-02-24 | Well Log Performed |
2011-06-14 | Perforation Treatment Performed - Cement Squeeze |
2011-06-14 | Perforation Treatment Performed - Jet Perforation |
2011-07-22 | Perforation Treatment Performed - Jet Perforation |
2011-07-22 | Well Log Performed |
2011-07-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-07-23 | Perforation Treatment Performed - Cement Squeeze |
2011-12-02 | Perforation Treatment Performed - Jet Perforation |
2011-12-02 | Well Log Performed |
2012-01-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2012-01-12 | Perforation Treatment Performed - Cement Squeeze |
2012-01-12 | Well Abandoned |
2012-01-12 | Well Fluid changed to Gas |
2012-01-12 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1980-11-10 | Perforation | 895.00 | 895.00 | 0 |
2011-07-23 | Packing Device Capped w/Cement | 173.80 | 185.80 | 0 |
2011-12-02 | Perforation | 173.00 | 177.00 | 17 |
2012-01-12 | Cement Squeeze | 173.00 | 177.00 | 0 |
2012-01-12 | Packing Device Capped w/Cement | 158.50 | 167.50 | 0 |
1980-11-10 | Cement Squeeze | 845.00 | 895.00 | 0 |
1980-11-12 | Perforation | 891.00 | 892.00 | 7 |
2011-01-22 | Cement Squeeze | 891.00 | 892.00 | 0 |
2011-01-22 | Packing Device Capped w/Cement | 878.80 | 886.80 | 0 |
2011-06-14 | Perforation | 286.00 | 290.00 | 17 |
2011-06-14 | Cement Squeeze | 286.00 | 290.00 | 0 |
2011-07-22 | Perforation | 193.00 | 197.00 | 17 |
2011-07-23 | Cement Squeeze | 193.00 | 197.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1986 | 2718 | 0.0 | 0.0 | 0.0 |
1987 | 7336 | 0.0 | 0.0 | 0.0 |
1988 | 5797 | 0.0 | 0.0 | 0.0 |
1989 | 6941 | 0.0 | 0.0 | 0.0 |
1990 | 7883 | 0.0 | 0.0 | 0.0 |
1991 | 7844 | 0.0 | 0.0 | 0.0 |
1992 | 8453 | 0.0 | 0.0 | 0.0 |
1993 | 7985 | 0.0 | 0.0 | 0.0 |
1994 | 8319 | 0.0 | 0.0 | 0.0 |
1995 | 8725 | 0.0 | 0.0 | 0.0 |
1996 | 7797 | 0.0 | 0.0 | 0.0 |
1997 | 7517 | 0.0 | 0.0 | 0.0 |
1998 | 7683 | 0.0 | 0.0 | 0.0 |
1999 | 7367 | 0.0 | 0.0 | 0.0 |
2000 | 8233 | 0.0 | 0.0 | 0.0 |
2001 | 5376 | 0.0 | 0.0 | 0.0 |
2002 | 7896 | 0.0 | 0.0 | 0.0 |
2003 | 5350 | 0.0 | 0.0 | 0.0 |
2004 | 7885 | 0.0 | 0.0 | 0.0 |
2005 | 6441 | 0.0 | 0.0 | 0.0 |
2006 | 1564 | 0.0 | 0.0 | 0.0 |
2007 | 56 | 0.0 | 0.0 | 0.0 |
2008 | 17 | 0.0 | 0.0 | 0.0 |
For data sources see[5]