If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0154201307000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.256568,"lon":-112.62551,"icon":""}]} |
Location: 00/07-13-015-20W4/0 | |
Location Alias: 00/07-13-15-20 W4M | |
Location Alias 2: 00/07-13-015-20 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 015 | |
Meridian: 4 | |
Range: 20 | |
Section: 13 | |
County/Municipality: Vulcan County | |
Well Name: ZARGON LBOW 7-13-15-20 | |
Operator Name: Zargon Oil & Gas Ltd. | |
License Number: 0085817 | |
License Date: 1980-09-23 | |
License Status: Issued | |
Spud Date: 1980-09-30 | |
Final Drill Date: 1980-10-08 | |
Well Total Depth: 1266.70 m | |
Surface Hole Latitude: 50.256568 | |
Surface Hole Longitude: -112.625510 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1980-09-23 | Obtained License |
1980-10-08 | Finished Drilling |
1980-10-09 | Drill Stem Test Performed |
1980-10-10 | Drill Stem Test Performed |
1980-10-11 | Production Casing Operation Performed |
1980-10-12 | Well Mode changed to Drilled and Cased |
1980-11-30 | Perforation Treatment Performed - Jet Perforation |
1980-12-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1980-12-03 | Perforation Treatment Performed - Jet Perforation |
1980-12-05 | Perforation Treatment Performed - Jet Perforation |
2002-02-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-02-08 | Perforation Treatment Performed - Jet Perforation |
2002-02-08 | Well Log Performed |
2002-05-22 | Well Began Production |
2002-05-22 | Well Fluid changed to Gas |
2002-05-22 | Well Mode changed to Flowing |
2004-01-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2004-01-23 | Plug Back Performed |
2004-01-23 | Well Fluid changed to Gas |
2004-01-23 | Well Log Performed |
2004-01-23 | Well Mode changed to Abandoned Zone |
2004-01-24 | Perforation Treatment Performed - Jet Perforation |
2004-01-25 | Perforation Treatment Performed - Jet Perforation |
2004-02-17 | Perforation Treatment Performed - Jet Perforation |
2004-02-17 | Well Log Performed |
2004-02-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2004-02-19 | Plug Back Performed |
2004-02-19 | Well Log Performed |
2004-02-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2004-02-20 | Perforation Treatment Performed - Jet Perforation |
2004-02-20 | Plug Back Performed |
2004-02-20 | Well Log Performed |
2005-10-15 | Perforation Treatment Performed - Jet Perforation |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1980-11-30 | Perforation | 1241.50 | 1246.20 | 13 |
2004-02-17 | Perforation | 1003.00 | 1003.70 | 17 |
2004-02-19 | Packing Device Capped w/Cement | 995.00 | 999.00 | 0 |
2004-02-20 | Packing Device Capped w/Cement | 979.00 | 983.00 | 0 |
2004-02-20 | Perforation | 944.50 | 946.00 | 17 |
2005-10-15 | Perforation | 389.00 | 391.00 | 17 |
1980-12-02 | Packing Device Capped w/Cement | 1240.00 | 1240.00 | 0 |
1980-12-03 | Perforation | 1221.50 | 1223.50 | 13 |
1980-12-05 | Perforation | 1195.00 | 1195.30 | 13 |
2002-02-08 | Packing Device Capped w/Cement | 1190.50 | 1193.50 | 0 |
2002-02-08 | Perforation | 1185.00 | 1187.00 | 17 |
2004-01-23 | Packing Device Capped w/Cement | 1174.00 | 1182.00 | 0 |
2004-01-24 | Perforation | 1002.00 | 1003.00 | 17 |
2004-01-25 | Perforation | 985.00 | 986.50 | 17 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2002 | 5441 | 0.0 | 0.0 | 0.0 |
2003 | 1179 | 0.0 | 0.0 | 0.0 |
For data sources see[5]