X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0154201307000

Well Details

Well ID: 0154201307000
Loading map...
Location: 00/07-13-015-20W4/0
Location Alias: 00/07-13-15-20 W4M
Location Alias 2: 00/07-13-015-20 W4/00
Country: Canada
Province: Alberta
Township: 015
Meridian: 4
Range: 20
Section: 13
County/Municipality: Vulcan County
Well Name: ZARGON LBOW 7-13-15-20
Operator Name: Zargon Oil & Gas Ltd.
License Number: 0085817
License Date: 1980-09-23
License Status: Issued
Spud Date: 1980-09-30
Final Drill Date: 1980-10-08
Well Total Depth: 1266.70 m
Surface Hole Latitude: 50.256568
Surface Hole Longitude: -112.625510

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-09-23 Obtained License
1980-10-08 Finished Drilling
1980-10-09 Drill Stem Test Performed
1980-10-10 Drill Stem Test Performed
1980-10-11 Production Casing Operation Performed
1980-10-12 Well Mode changed to Drilled and Cased
1980-11-30 Perforation Treatment Performed - Jet Perforation
1980-12-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-12-03 Perforation Treatment Performed - Jet Perforation
1980-12-05 Perforation Treatment Performed - Jet Perforation
2002-02-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-02-08 Perforation Treatment Performed - Jet Perforation
2002-02-08 Well Log Performed
2002-05-22 Well Began Production
2002-05-22 Well Fluid changed to Gas
2002-05-22 Well Mode changed to Flowing
2004-01-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-01-23 Plug Back Performed
2004-01-23 Well Fluid changed to Gas
2004-01-23 Well Log Performed
2004-01-23 Well Mode changed to Abandoned Zone
2004-01-24 Perforation Treatment Performed - Jet Perforation
2004-01-25 Perforation Treatment Performed - Jet Perforation
2004-02-17 Perforation Treatment Performed - Jet Perforation
2004-02-17 Well Log Performed
2004-02-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-02-19 Plug Back Performed
2004-02-19 Well Log Performed
2004-02-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-02-20 Perforation Treatment Performed - Jet Perforation
2004-02-20 Plug Back Performed
2004-02-20 Well Log Performed
2005-10-15 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-11-30 Perforation 1241.50 1246.20 13
2004-02-17 Perforation 1003.00 1003.70 17
2004-02-19 Packing Device Capped w/Cement 995.00 999.00 0
2004-02-20 Packing Device Capped w/Cement 979.00 983.00 0
2004-02-20 Perforation 944.50 946.00 17
2005-10-15 Perforation 389.00 391.00 17
1980-12-02 Packing Device Capped w/Cement 1240.00 1240.00 0
1980-12-03 Perforation 1221.50 1223.50 13
1980-12-05 Perforation 1195.00 1195.30 13
2002-02-08 Packing Device Capped w/Cement 1190.50 1193.50 0
2002-02-08 Perforation 1185.00 1187.00 17
2004-01-23 Packing Device Capped w/Cement 1174.00 1182.00 0
2004-01-24 Perforation 1002.00 1003.00 17
2004-01-25 Perforation 985.00 986.50 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 5441 0.0 0.0 0.0
2003 1179 0.0 0.0 0.0

For data sources see[5]

References