X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0234180912020

Well Details

Well ID: 0234180912020
Loading map...
Location: 02/12-09-023-18W4/0
Location Alias: 02/12-09-23-18 W4M
Location Alias 2: 02/12-09-023-18 W4/00
Country: Canada
Province: Alberta
Township: 023
Meridian: 4
Range: 18
Section: 09
County/Municipality: County of Newell
Well Name: EDALIS ENERGY 02 COUNTESS 12-9-23-18
Operator Name: Edalis Energy Inc.
License Number: 0269749
License Date: 2002-05-03
License Status: Issued
Spud Date: 2002-05-07
Final Drill Date: 2002-05-12
Well Total Depth: 1290.00 m
Surface Hole Latitude: 50.943826
Surface Hole Longitude: -112.467945

For data sources see[1][2]

Well History

Date Event
2002-05-03 Obtained License
2002-05-08 Surface Casing Operation Performed
2002-05-12 Finished Drilling
2002-05-12 Well Log Performed
2002-05-14 Drill Stem Test Performed
2002-05-14 Production Casing Operation Performed
2002-05-14 Rig Released
2002-05-14 Well Mode changed to Drilled and Cased
2002-05-27 Well Log Performed
2002-05-28 Perforation Treatment Performed - Jet Perforation
2002-05-28 Well Log Performed
2002-05-30 Well Log Performed
2002-05-31 Perforation Treatment Performed - Chemical Squeeze
2002-07-10 Well Log Performed
2002-07-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-07-14 Perforation Treatment Performed - Fractured
2002-10-01 Well Began Production
2002-10-01 Well Fluid changed to Crude Oil
2002-10-01 Well Mode changed to Pumping
2002-12-29 Perforation Treatment Performed - Jet Perforation
2002-12-31 Perforation Treatment Performed - Cement Squeeze
2002-12-31 Plug Back Performed
2002-12-31 Well Fluid changed to Crude Oil
2002-12-31 Well Mode changed to Abandoned Zone
2003-06-13 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-05-28 Perforation 1253.00 1254.00 17
2002-05-28 Perforation 1257.00 1258.50 17
2002-05-31 Chemical Squeeze 1253.00 1254.00 0
2002-07-14 Acid Treatment 1253.00 1254.00 0
2002-07-14 Fracture 1253.00 1254.00 0
2002-12-29 Perforation 1264.00 1274.00 13
2002-12-31 Cement Squeeze 1253.00 1258.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 152 0.0 0.0 0.0

For data sources see[5]

References