If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0234180912020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.943826,"lon":-112.467945,"icon":""}]} |
| Location: 02/12-09-023-18W4/0 | |
| Location Alias: 02/12-09-23-18 W4M | |
| Location Alias 2: 02/12-09-023-18 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 023 | |
| Meridian: 4 | |
| Range: 18 | |
| Section: 09 | |
| County/Municipality: County of Newell | |
| Well Name: EDALIS ENERGY 02 COUNTESS 12-9-23-18 | |
| Operator Name: Edalis Energy Inc. | |
| License Number: 0269749 | |
| License Date: 2002-05-03 | |
| License Status: Issued | |
| Spud Date: 2002-05-07 | |
| Final Drill Date: 2002-05-12 | |
| Well Total Depth: 1290.00 m | |
| Surface Hole Latitude: 50.943826 | |
| Surface Hole Longitude: -112.467945 |
| Date | Event |
|---|---|
| 2002-05-03 | Obtained License |
| 2002-05-08 | Surface Casing Operation Performed |
| 2002-05-12 | Finished Drilling |
| 2002-05-12 | Well Log Performed |
| 2002-05-14 | Drill Stem Test Performed |
| 2002-05-14 | Production Casing Operation Performed |
| 2002-05-14 | Rig Released |
| 2002-05-14 | Well Mode changed to Drilled and Cased |
| 2002-05-27 | Well Log Performed |
| 2002-05-28 | Perforation Treatment Performed - Jet Perforation |
| 2002-05-28 | Well Log Performed |
| 2002-05-30 | Well Log Performed |
| 2002-05-31 | Perforation Treatment Performed - Chemical Squeeze |
| 2002-07-10 | Well Log Performed |
| 2002-07-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2002-07-14 | Perforation Treatment Performed - Fractured |
| 2002-10-01 | Well Began Production |
| 2002-10-01 | Well Fluid changed to Crude Oil |
| 2002-10-01 | Well Mode changed to Pumping |
| 2002-12-29 | Perforation Treatment Performed - Jet Perforation |
| 2002-12-31 | Perforation Treatment Performed - Cement Squeeze |
| 2002-12-31 | Plug Back Performed |
| 2002-12-31 | Well Fluid changed to Crude Oil |
| 2002-12-31 | Well Mode changed to Abandoned Zone |
| 2003-06-13 | Well Log Performed |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2002-05-28 | Perforation | 1253.00 | 1254.00 | 17 |
| 2002-05-28 | Perforation | 1257.00 | 1258.50 | 17 |
| 2002-05-31 | Chemical Squeeze | 1253.00 | 1254.00 | 0 |
| 2002-07-14 | Acid Treatment | 1253.00 | 1254.00 | 0 |
| 2002-07-14 | Fracture | 1253.00 | 1254.00 | 0 |
| 2002-12-29 | Perforation | 1264.00 | 1274.00 | 13 |
| 2002-12-31 | Cement Squeeze | 1253.00 | 1258.50 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2002 | 152 | 0.0 | 0.0 | 0.0 |
For data sources see[5]