INSPECTION ID
|
DATE
|
DESCRIPTION
|
COMMENT
|
VIOLATION ID
|
VIOLATION CODE
|
VIOLATION_COMMENT
|
-1381874188
|
2012-08-16
|
|
Received phone call from Randy Ferguson from PDC. He stated that he was going to hire Columbus Environmental Consultants to inspect sites and give recommendations for remediation. After that they will hire a contractor to do the work. They want to seed the sites in September.
|
|
|
|
-2106859502
|
2011-08-17
|
|
Witnessed cementing of intermediate string. 2650 feet of 7" pipe was ran. Good circulation achieved.
|
|
|
|
-775203851
|
2011-08-15
|
|
Checked on status of drilling rig. Depth was 1230 feet. Driller stated that drill pipe had to be tripped out due clog.
|
|
|
|
1314189380
|
2011-08-13
|
|
Witnessed cementing of surface casing. Good circulation and good cement returns were observed. Cement fell back about 15 feet after pumping. Will be topped off after intermediate string job. Blowout preventer will be attached after cement sets up.
|
|
|
|
1345463254
|
2012-08-15
|
|
Spoke with Jeff Glossa from PDC at 3:29 pm. We spoke about the preliminary restoration on this well and another (p# 3603). I told him that it was past due and needed to be completed as soon as possible. I also made mention of the lack of vegetation and erosion problems. He stated that PDC's environmental compliance person had been on scene and was evaluating the situation. He then stated that he would have Randal Ferguson call me. He also works with their environmental department. Mr. Glossa also reported that he had been in contact with Columbus as far as the completion of the well and had submitted all necessary paperwork.
|
|
|
|
1348747682
|
2012-01-06
|
|
No vegetation had been established. Pits have been closed and equipment had been removed. Accompanied by inspector Kip Thompson.
|
|
|
|
1555269932
|
2012-10-31
|
|
Received phone call from Mr. Randy Ferguson at 10:34 am stating that this well has been transferred to Jim Kilbarger.
|
|
|
|
1930258575
|
2012-08-29
|
|
Met with Mr. Mike Reeves from CEC (Civil and Environmental Contractors). They are a third party contractor for PDC Energy and will be making recommendations for the completion of the preliminary restoration on this well site. We inspected the site together and came to a consensus on how to remedy the erosion problems.
|
|
|
|
357026960
|
2011-08-22
|
|
Checked status of drilling rig. Total depth was at 4654 feet. Water had broke in on well bore. Logs were being ran.
|
|
|
|
46567211
|
2011-08-18
|
|
Witnessed Blowout preventer test. 365 psi was held for 10 minutes, then pressure was held at 500 psi for 1.5 minutes, then blown down.
|
|
|
|