34-073-23601

Well Details

Well ID: 34-073-23601
Loading map...
Country: United States
State: Ohio
County: Hocking
Municipality: Washington Township
Operator Name: HOCKING HILLS ENERGY AND WELL
Well Pad ID:
Farm/Lease Name: CATHER
License Status: Well Drilled
License Date: 2011-08-03
Spud Date: 2011-08-12
Spud Drilling Contractor: BOWMAN DRILLING
Final Drill Date: 2011-08-21
Well Total Depth: 4664.00 ft
Configuration: Vertical
Latitude: 39.480000
Longitude: -82.470000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2011-08-03 Proposed Formations:QUEENSTON THRU ROSE RUN, Issued Date:8/3/2011, Expired Date:8/2/2013 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:EOUT
Reached Total Depth 2011-08-21
Completion Report Received 2012-04-30
Construction Permit Expires 2012-08-02
Change of Owner 2012-11-02 Operator changed from 8595, PDC ENERGY INC to 8416, LOGAN GAS INC
Change of Owner 2014-05-19 Operator changed from 8416, LOGAN GAS INC to 5755, HOCKING HILLS ENERGY WELL SERV
Record Last Modified 2018-12-19

For data sources see[2]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
0 0 0

For data sources see[3]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2012 LOGAN GAS INC 0.00 0.00 0
2014 HOCKING HILLS ENERGY AND WELL 0.00 0.00 365
2015 HOCKING HILLS ENERGY AND WELL 0.00 0.00 365
2016 HOCKING HILLS ENERGY AND WELL 0.00 0.00 365
2017 HOCKING HILLS ENERGY AND WELL 0.00 0.00 365

For data sources see[4] [5]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2012 LOGAN GAS INC Brine 0 0
2014 HOCKING HILLS ENERGY AND WELL Brine 0 365
2015 HOCKING HILLS ENERGY AND WELL Brine 0 365
2016 HOCKING HILLS ENERGY AND WELL Brine 0 365
2017 HOCKING HILLS ENERGY AND WELL Brine 0 365

For data sources see[6] [7]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1381874188 2012-8-16 0:00: AM No Violations 0.50
-2106859502 2011-8-17 0:00: DD No Violations 2.50
-529878226 2019-2-7 0:00:0 PL No Violations 0.30
-775203851 2011-8-15 0:00: DD No Violations 1.50
0046567211 2011-08-18 Drill / Deepen / Reopen No Violations Witnessed Blowout preventer test. 365 psi was held for 10 minutes, then pressure was held at 500 psi for 1.5 minutes, then blown down.
0357026960 2011-08-22 Drill / Deepen / Reopen No Violations Checked status of drilling rig. Total depth was at 4654 feet. Water had broke in on well bore. Logs were being ran.
0529878226 2019-02-07 Preliminary Restoration No Violations I conducted a preliminary restoration status check on this well location today. My inspection revealed that vegetation was sparse but adequate to meet ORC 1509.072 requirements. I did not observe any erosional issues at the well location or on the lease road. I took several photos of the well location. Time of inspection: 11:25 AM. Weather: 56 degrees F, Rain
0775203851 2011-08-15 Drill / Deepen / Reopen No Violations Checked on status of drilling rig. Depth was 1230 feet. Driller stated that drill pipe had to be tripped out due clog.
1314189380 2011-08-13 Drill / Deepen / Reopen No Violations Witnessed cementing of surface casing. Good circulation and good cement returns were observed. Cement fell back about 15 feet after pumping. Will be topped off after intermediate string job. Blowout preventer will be attached after cement sets up.
1345463254 2012-08-15 Administrative Inspection No Violations Spoke with Jeff Glossa from PDC at 3:29 pm. We spoke about the preliminary restoration on this well and another (p# 3603). I told him that it was past due and needed to be completed as soon as possible. I also made mention of the lack of vegetation and erosion problems. He stated that PDCs environmental compliance person had been on scene and was evaluating the situation. He then stated that he would have Randal Ferguson call me. He also works with their environmental department. Mr. Glossa also reported that he had been in contact with Columbus as far as the completion of the well and had submitted all necessary paperwork.
1348747682 2012-01-06 Preliminary Restoration No Violations No vegetation had been established. Pits have been closed and equipment had been removed. Accompanied by inspector Kip Thompson.
1381874188 2012-08-16 Administrative Inspection No Violations Received phone call from Randy Ferguson from PDC. He stated that he was going to hire Columbus Environmental Consultants to inspect sites and give recommendations for remediation. After that they will hire a contractor to do the work. They want to seed the sites in September.
1549638902 2019-02-07 Production Wells No Violations My inspection of the well revealed that it was not capable of production. The well was equipped with a 4.5 inch to 2 inch swage with a valve on it. The well was shut in and was not connected to any production lines. According to production reports the well has never produced any gas or oil. I took several photos of the well location. I left a voicemail message for Doug Kitchen at 2:16 PM on 2/8/2019. The well owner/operator shall submit a written plugging schedule to Brandon Mitchell at 5880 Memory Road Zanesville, Ohio 43701-9553 within 30 days, per ORC 1509:13(B)(7), and plug the well within 180 days. The well owner/operator will be notified if the plugging schedule is approved or denied. Time of inspection: 11:25 AM. Weather: 56 degrees F, Rain
1555269932 2012-10-31 Administrative Inspection No Violations Received phone call from Mr. Randy Ferguson at 10:34 am stating that this well has been transferred to Jim Kilbarger.
1580757933 2020-2-3 0:00:0 PW No Violations 0.50
1930258575 2012-08-29 Preliminary Restoration No Violations Met with Mr. Mike Reeves from CEC (Civil and Environmental Contractors). They are a third party contractor for PDC Energy and will be making recommendations for the completion of the preliminary restoration on this well site. We inspected the site together and came to a consensus on how to remedy the erosion problems.
2106859502 2011-08-17 Drill / Deepen / Reopen No Violations Witnessed cementing of intermediate string. 2650 feet of 7 pipe was ran. Good circulation achieved.
357026960 2011-8-22 0:00: DD No Violations 1.00
46567211 2011-8-18 0:00: DD No Violations 2.00

For data sources see[8]

References