If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-073-23601 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.48,"lon":-82.47,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Hocking | |
Municipality: Washington Township | |
Operator Name: HOCKING HILLS ENERGY AND WELL | |
Well Pad ID: | |
Farm/Lease Name: CATHER | |
License Status: Well Drilled | |
License Date: 2011-08-03 | |
Spud Date: 2011-08-12 | |
Spud Drilling Contractor: BOWMAN DRILLING | |
Final Drill Date: 2011-08-21 | |
Well Total Depth: 4664.00 ft | |
Configuration: Vertical | |
Latitude: 39.480000 | |
Longitude: -82.470000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2011-08-03 | Proposed Formations:QUEENSTON THRU ROSE RUN, Issued Date:8/3/2011, Expired Date:8/2/2013 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:EOUT |
Reached Total Depth | 2011-08-21 | |
Completion Report Received | 2012-04-30 | |
Construction Permit Expires | 2012-08-02 | |
Change of Owner | 2012-11-02 | Operator changed from 8595, PDC ENERGY INC to 8416, LOGAN GAS INC |
Change of Owner | 2014-05-19 | Operator changed from 8416, LOGAN GAS INC to 5755, HOCKING HILLS ENERGY WELL SERV |
Record Last Modified | 2018-12-19 |
For data sources see[2]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
0 | 0 | 0 |
For data sources see[3]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2012 | LOGAN GAS INC | 0.00 | 0.00 | 0 |
2014 | HOCKING HILLS ENERGY AND WELL | 0.00 | 0.00 | 365 |
2015 | HOCKING HILLS ENERGY AND WELL | 0.00 | 0.00 | 365 |
2016 | HOCKING HILLS ENERGY AND WELL | 0.00 | 0.00 | 365 |
2017 | HOCKING HILLS ENERGY AND WELL | 0.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2012 | LOGAN GAS INC | Brine | 0 | 0 |
2014 | HOCKING HILLS ENERGY AND WELL | Brine | 0 | 365 |
2015 | HOCKING HILLS ENERGY AND WELL | Brine | 0 | 365 |
2016 | HOCKING HILLS ENERGY AND WELL | Brine | 0 | 365 |
2017 | HOCKING HILLS ENERGY AND WELL | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1381874188 | 2012-8-16 0:00: | AM | No Violations | 0.50 |
-2106859502 | 2011-8-17 0:00: | DD | No Violations | 2.50 |
-529878226 | 2019-2-7 0:00:0 | PL | No Violations | 0.30 |
-775203851 | 2011-8-15 0:00: | DD | No Violations | 1.50 |
0046567211 | 2011-08-18 | Drill / Deepen / Reopen | No Violations | Witnessed Blowout preventer test. 365 psi was held for 10 minutes, then pressure was held at 500 psi for 1.5 minutes, then blown down. |
0357026960 | 2011-08-22 | Drill / Deepen / Reopen | No Violations | Checked status of drilling rig. Total depth was at 4654 feet. Water had broke in on well bore. Logs were being ran. |
0529878226 | 2019-02-07 | Preliminary Restoration | No Violations | I conducted a preliminary restoration status check on this well location today. My inspection revealed that vegetation was sparse but adequate to meet ORC 1509.072 requirements. I did not observe any erosional issues at the well location or on the lease road. I took several photos of the well location. Time of inspection: 11:25 AM. Weather: 56 degrees F, Rain |
0775203851 | 2011-08-15 | Drill / Deepen / Reopen | No Violations | Checked on status of drilling rig. Depth was 1230 feet. Driller stated that drill pipe had to be tripped out due clog. |
1314189380 | 2011-08-13 | Drill / Deepen / Reopen | No Violations | Witnessed cementing of surface casing. Good circulation and good cement returns were observed. Cement fell back about 15 feet after pumping. Will be topped off after intermediate string job. Blowout preventer will be attached after cement sets up. |
1345463254 | 2012-08-15 | Administrative Inspection | No Violations | Spoke with Jeff Glossa from PDC at 3:29 pm. We spoke about the preliminary restoration on this well and another (p# 3603). I told him that it was past due and needed to be completed as soon as possible. I also made mention of the lack of vegetation and erosion problems. He stated that PDCs environmental compliance person had been on scene and was evaluating the situation. He then stated that he would have Randal Ferguson call me. He also works with their environmental department. Mr. Glossa also reported that he had been in contact with Columbus as far as the completion of the well and had submitted all necessary paperwork. |
1348747682 | 2012-01-06 | Preliminary Restoration | No Violations | No vegetation had been established. Pits have been closed and equipment had been removed. Accompanied by inspector Kip Thompson. |
1381874188 | 2012-08-16 | Administrative Inspection | No Violations | Received phone call from Randy Ferguson from PDC. He stated that he was going to hire Columbus Environmental Consultants to inspect sites and give recommendations for remediation. After that they will hire a contractor to do the work. They want to seed the sites in September. |
1549638902 | 2019-02-07 | Production Wells | No Violations | My inspection of the well revealed that it was not capable of production. The well was equipped with a 4.5 inch to 2 inch swage with a valve on it. The well was shut in and was not connected to any production lines. According to production reports the well has never produced any gas or oil. I took several photos of the well location. I left a voicemail message for Doug Kitchen at 2:16 PM on 2/8/2019. The well owner/operator shall submit a written plugging schedule to Brandon Mitchell at 5880 Memory Road Zanesville, Ohio 43701-9553 within 30 days, per ORC 1509:13(B)(7), and plug the well within 180 days. The well owner/operator will be notified if the plugging schedule is approved or denied. Time of inspection: 11:25 AM. Weather: 56 degrees F, Rain |
1555269932 | 2012-10-31 | Administrative Inspection | No Violations | Received phone call from Mr. Randy Ferguson at 10:34 am stating that this well has been transferred to Jim Kilbarger. |
1580757933 | 2020-2-3 0:00:0 | PW | No Violations | 0.50 |
1930258575 | 2012-08-29 | Preliminary Restoration | No Violations | Met with Mr. Mike Reeves from CEC (Civil and Environmental Contractors). They are a third party contractor for PDC Energy and will be making recommendations for the completion of the preliminary restoration on this well site. We inspected the site together and came to a consensus on how to remedy the erosion problems. |
2106859502 | 2011-08-17 | Drill / Deepen / Reopen | No Violations | Witnessed cementing of intermediate string. 2650 feet of 7 pipe was ran. Good circulation achieved. |
357026960 | 2011-8-22 0:00: | DD | No Violations | 1.00 |
46567211 | 2011-8-18 0:00: | DD | No Violations | 2.00 |
For data sources see[8]