INSPECTION ID
|
DATE
|
DESCRIPTION
|
COMMENT
|
VIOLATION ID
|
VIOLATION CODE
|
VIOLATION_COMMENT
|
-1600707107
|
2004-10-18
|
|
Pits are closed and pipe has been cut off below ground level. No leaks noted
|
|
|
|
-1645700414
|
2004-10-08
|
|
Had to run tubing in hole to set the rest of plugs on cement.The tubing got stuck and after working it pulled out and check bottom joint.Cut slots in bottom joint and ran back in to 990 ft.Set cement plug from 990 ft. to 600 ft. Set next plug at 400 ft. to 0ft. Had cement drop down hole.W/O cement to set up and top off again and this time it held at surface.Cement remained at surface and did not drop off after job was complete.
|
|
|
|
-437086348
|
2004-10-07
|
|
Rip 4 inch at 2700ft. Set bridge plug at 2650 ft. and fill with 4.5 tons clay.Return later and found all 4 inch out and pulling 8 inch next.
|
|
|
|
1299006499
|
2004-09-24
|
|
Check for rig again today and did not find rig.Contact Altier Brothers and found that rig is delayed on another plug.
|
|
|
|
1521995339
|
2004-10-06
|
|
Set 4 tons clay on bottom 3714 to 3200 ft.
|
|
|
|
1591262186
|
2004-09-23
|
|
Rig was to have moved in today and check on rig status.Did not find rig today ?
|
|
|
|
592938085
|
2007-01-11
|
|
Meets requirements for restoration final .
|
|
|
|