34-115-24684

Well Details

Well ID: 34-115-24684
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date:
Unconventional:
Horizontal:
Producing:
Violations:
Latitude:
Longitude:

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
-1787874090 2014-01-29 I was on location to witness Universal Cement Company set the 13 3/8 casing with 1417 sacks of cement. Operator used 9 centralizers. They had good circulation and had 45 bbls of cement returns. They locked in at 700psi for 5 minutes with no issues.
-853103158 2014-01-25 Witnessed the cementing of the surface casing. Good circulation and good returns were observed. 341 ft of 20 in casing was ran in 368 ft of 24 in hole. About 20 plus barrels of returns were observed at the surface. Spoke with drilling consultant on site.
1390497553 2014-01-23 I arrived on location for a site inspection. Express Energy was grouting the mousehole, and Dave Gray stated they will let it sit for 12 hours before they resume drilling the surface casing hole. There are no issues to report at this time.
1390843244 2014-01-27 I met PDC's EH&S specialist Tony Long, out on location today. The liner was cut in the corner of the location exposing one of the pad drainage vaults. They are going to move the vehicles on top of the spot and check the vault and repair the liner this week. Tony will call me when they are ready to perform job.
1391105560 2014-01-30 I was on location to witness the testing of the BOP.
1406823971 2014-07-31 PDC is currently on Stage 14 of their completion operation. The average treating pressure has been around 7500-8000 psi at 80 bbls/min. Breakdown pressure for this stage was witnessed at 7310'.
1410191474 2014-09-08 PDC has removed all of the completion equipment off location and the wells are currently producing flowback water. The dike has been constructed and consists of six 500bbl tanks. Energy Services Corporation was installing equipment at the wellhead in order to monitor the surface casing pressures, and H & L Services was unloading flowback from one of the tanks.
406366972 2014-03-24 PDC is currently drilling the horizotal lateral and mudloggers are on location taking samples. They are currently at 8571' MD.
725912596 2014-02-05 I arrived on location and they were in the process of hooking up the wireline truck in order to run the gyro.
762080886 2014-07-31 Witnessed partial frac with inspector Jake Glascock. The company was beginning the 12th stage of their lateral frac. Formation breakdown pressure was 7200 psi.