X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-121-24507

Well Details

Well ID: 34-121-24507
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date:
Unconventional:
Horizontal:
Producing:
Violations:
Latitude:
Longitude:

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
-1287043149 2014-07-14 I am onsite to witness the cementing operations of the conductor casing string. Express energy ran 100' of twenty-six inch weld casing. Express also cemented the casing in place with 330 sacks of class A cement. I witnessed twenty barrels of cement return to surface.
1164043278 2014-07-15 My inspection to day finds Express Energy Services has drilled a 32' hole to a depth of 100'. They then ran 100' of 26" 98 pound casing. Allied Oil and Gas Services cemented the casing in place with 330 sacks of class A cement. I witnessed good cement returns to surface.
1408578897 2014-08-20 I am onsite to witness the surface casing cementing operations. I tested the mix water with a low range Quantab which indicated the total chlorides were at 37 ppm. Dallas Morris 24 ran 371' of 18.625" casing. Allied Oil and Gas Services circulated 730 sacks of class A cement into place. The casing was pressured up to 800 pounds and lost only five percent.