If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-067-21324 |
County: |
Municipality: |
Operator Name: |
Well Pad ID: |
Farm/Lease Name: |
First Permit Date: |
Last Permit Date: |
Spud Date: |
Unconventional: |
Horizontal: |
Producing: |
Violations: |
Latitude: |
Longitude: |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
-271988729 | 2014-05-15 | Rocky Mountain Drilling has a top hole rig on site to drill and set the conductor casing. Ready later today. | ||||
574881462 | 2014-05-15 | On the day of my inspection I found that Rocky Mountain Drilling had drilled a 26" hole to a depth of 120' with and auger rig. They ran new 20" conductor casing to 120'. Universal Well Services cemented the casing to surface with 245 sacks of class A cement. There were approximately 12 barrels of cement circulated to the surface. |