If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-019-22563 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.4957740044,"lon":-81.0597729012,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2014-03-31 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 0 | |
Latitude: 40.4957740044 | |
Longitude: -81.0597729012 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
-1126447087 | 2014-04-01 | A general inspection of the Holmes pad revealed that this will be the last two of the eight conductors to be set. The site in general is in good shape. The road is complete the pad is complete. Precision Rat Hole is the drilling contractor and Allied is the cement contractor. The conductors were installed with no difficulty. No violations found. | ||||
-1207324183 | 2014-04-21 | I was on location to observe the cementing of the 9.625" intermediate casing. No violations identified. | ||||
-1253485944 | 2014-04-19 | I was on location to observe the cementing of the 13.375" surface casing. Surface casing was ran to a depth of 834' . Schlumberger cemented with 770 sacks of cement. Cement was returned back to surface in the amount of 25 barrels ( bbl). No violations were observed. | ||||
1399136259 | 2014-04-18 | I was on location to observe the drilling progress og Patterson Rig # 329. The hole was spudded on 4/18/2014 . The rig was drilling a 17.5" hole at 196' kelly bushing ( KB). No violations were identified. | ||||
396456190 | 2014-04-01 | A general inspection of the Holmes pad revealed that two of the eight conductors have been set. The site in general is in good shape. The road is complete and ninety percent of the pad is complete. The center still needs a top coat of limestone and the cellars have been cemented on the outside. Precision Rat Hole is the drilling contractor and O-tex is the cement contractor. No violations found. |