If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-111-24161 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.6493941149,"lon":-80.8727298107,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2008-05-10 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 0 | |
Latitude: 39.6493941149 | |
Longitude: -80.8727298107 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
-424992700 | 2010-06-30 | FOLLOW UP TO NOV # 1303226660 FOLLOW UP TO NOV # 1279911484 On day of inspection well is supplied with pump jack and 9 5/8 cas,7cas,4.5cas,2 3/8tubing.There is a 210 bbl tank and 100bbl tank. The dike and id are in place. There is an erosion issue and some reseeding and mulching. Called Virco on the NOC and they will get in there with in two weeks and do the required work. I talked to Palmer and Hanshumacher. The restoration did not pass on day of inspection. | ||||
1279911484 | 2010-06-30 | On day of inspection well is supplied with pump jack and 9 5/8 cas,7cas,4.5cas,2 3/8tubing.There is a 210 bbl tank and 100bbl tank. The dike and id are in place. There is an erosion issue and some reseeding and mulching. Called Virco on the NOC and they will get in there with in two weeks and do the required work. I talked to Palmer and Hanshumacher. The restoration did not pass on day of inspection. | ||||
1303226660 | 2010-06-30 | FOLLOW UP TO NOV # 1279911484 On day of inspection well is supplied with pump jack and 9 5/8 cas,7cas,4.5cas,2 3/8tubing.There is a 210 bbl tank and 100bbl tank. The dike and id are in place. There is an erosion issue and some reseeding and mulching. Called Virco on the NOC and they will get in there with in two weeks and do the required work. I talked to Palmer and Hanshumacher. The restoration did not pass on day of inspection. | ||||
1370439014 | 2013-06-05 | Upon inspection a producing well was found with the production valves open, A single 100 & 210 barrel production tanks are located in an established dike area with a separator and gas sales meter present; Proper well identification is posted. I will note that there is a unresolved violation written by Inspector Pat Shreve on 06/30 2010 for lack of vegetation. On this day I observed light vegetation sufficient to hold vegetation but will note that it is evident that during the initial site construction good management practices were not use to save sufficient top soil to properly re establish vegetation. Restoration passed and prior compliance notice resolved on this day. | ||||
1710130203 | 2010-06-30 | FOLLOW UP TO NOV # 1279911484 On day of inspection well is supplied with pump jack and 9 5/8 cas,7cas,4.5cas,2 3/8tubing.There is a 210 bbl tank and 100bbl tank. The dike and id are in place. There is an erosion issue and some reseeding and mulching. Called Virco on the NOC and they will get in there with in two weeks and do the required work. I talked to Palmer and Hanshumacher. The restoration did not pass on day of inspection. | ||||
1732494069 | 2010-10-12 | On day of inspection I called Bob Hanshumacher at Virco and met him at the site. There was a little erosion starting. Bob would get there tomorrow and rectify. Reseed and mulch. | ||||
763636147 | 2008-11-25 | WELL IS SUPPLIED WITH A RABBIT AND WANTED TO SEE IF PIT WAS CLOSED OVER.BEEN GRADED AND SEEDED BACK.WILL CHECK BACK LATER. |