Well ID: 34-111-24161 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.64,"lon":-80.87,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: <County> | |
Municipality: | |
Operator Name: VIRCO INC | |
Well Pad ID: | |
Farm/Lease Name: BRADFIELD M # 1-23 | |
License Status: Producing | |
License Date: 2008-01-18 | |
Spud Date: 2008-05-10 | |
Spud Drilling Contractor: ALPHA DRILLING | |
Final Drill Date: 2008-05-16 | |
Well Total Depth: 6122.00 ft | |
Configuration: Vertical | |
Latitude: 39.640000 | |
Longitude: -80.870000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2008-01-18 | 7434 VIRCO INC Proposed Formation DEVNIAN SHALE/ ORISKANY Issued Date 1/18/2008 Expired Date 1/17/2009 6:00:00 AM |
Reached Total Depth | 2008-05-16 | |
Completion Report Received | 2008-10-06 | |
Construction Permit Expires | 2009-01-17 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2008-11-21 | 5888 | 5988 | 108 |
5888 | 5988 | 108 | |
5888 | 5988 | 108 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 15 | 16000 Bbl | 213000 | 2000 GALLONS HCL ACID |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2008 | VIRCO INC | 3577.00 | 84.00 | 56 |
2009 | VIRCO INC | 16686.00 | 73.00 | 365 |
2010 | VIRCO INC | 11031.00 | 77.00 | 365 |
2011 | VIRCO INC | 6801.00 | 0.00 | 365 |
2012 | VIRCO INC | 8345.00 | 0.00 | 366 |
2013 | VIRCO INC | 6112.00 | 0.00 | 365 |
2014 | VIRCO INC | 3911.00 | 0.00 | 365 |
2015 | VIRCO INC | 3369.00 | 0.00 | 365 |
2016 | VIRCO INC | 3559.00 | 0.00 | 366 |
2017 | VIRCO INC | 0.00 | 0.00 | 0 |
2018 | VIRCO INC | 9034.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2008 | VIRCO INC | Brine | 12604 | 56 |
2009 | VIRCO INC | Brine | 958 | 365 |
2010 | VIRCO INC | Brine | 291 | 365 |
2011 | VIRCO INC | Brine | 42 | 365 |
2012 | VIRCO INC | Brine | 0 | 366 |
2013 | VIRCO INC | Brine | 66 | 365 |
2014 | VIRCO INC | Brine | 55 | 365 |
2015 | VIRCO INC | Brine | 0 | 365 |
2016 | VIRCO INC | Brine | 0 | 366 |
2017 | VIRCO INC | Brine | 0 | 0 |
2018 | VIRCO INC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-424992700 | 2010-6-30 0:00: | PL | No Violations | 1.50 |
0424992700 | 2010-06-30 | Preliminary Restoration | No Violations | FOLLOW UP TO NOV # 1303226660 FOLLOW UP TO NOV # 1279911484 On day of inspection well is supplied with pump jack and 9 5/8 cas,7cas,4.5cas,2 3/8tubing.There is a 210 bbl tank and 100bbl tank. The dike and id are in place. There is an erosion issue and some reseeding and mulching. Called Virco on the NOC and they will get in there with in two weeks and do the required work. I talked to Palmer and Hanshumacher. The restoration did not pass on day of inspection. |
0763636147 | 2008-11-25 | Production Wells | No Violations | WELL IS SUPPLIED WITH A RABBIT AND WANTED TO SEE IF PIT WAS CLOSED OVER.BEEN GRADED AND SEEDED BACK.WILL CHECK BACK LATER. |
1279911484 | 2010-06-30 | Preliminary Restoration | No Violations | On day of inspection well is supplied with pump jack and 9 5/8 cas,7cas,4.5cas,2 3/8tubing.There is a 210 bbl tank and 100bbl tank. The dike and id are in place. There is an erosion issue and some reseeding and mulching. Called Virco on the NOC and they will get in there with in two weeks and do the required work. I talked to Palmer and Hanshumacher. The restoration did not pass on day of inspection. |
1303226660 | 2010-06-30 | Preliminary Restoration | No Violations | FOLLOW UP TO NOV # 1279911484 On day of inspection well is supplied with pump jack and 9 5/8 cas,7cas,4.5cas,2 3/8tubing.There is a 210 bbl tank and 100bbl tank. The dike and id are in place. There is an erosion issue and some reseeding and mulching. Called Virco on the NOC and they will get in there with in two weeks and do the required work. I talked to Palmer and Hanshumacher. The restoration did not pass on day of inspection. |
1370439014 | 2013-06-05 | Production Wells | No Violations | Upon inspection a producing well was found with the production valves open, A single 100 & 210 barrel production tanks are located in an established dike area with a separator and gas sales meter present; Proper well identification is posted. I will note that there is a unresolved violation written by Inspector Pat Shreve on 06/30 2010 for lack of vegetation. On this day I observed light vegetation sufficient to hold vegetation but will note that it is evident that during the initial site construction good management practices were not use to save sufficient top soil to properly re establish vegetation. Restoration passed and prior compliance notice resolved on this day. |
1710130203 | 2010-06-30 | Preliminary Restoration | No Violations | FOLLOW UP TO NOV # 1279911484 On day of inspection well is supplied with pump jack and 9 5/8 cas,7cas,4.5cas,2 3/8tubing.There is a 210 bbl tank and 100bbl tank. The dike and id are in place. There is an erosion issue and some reseeding and mulching. Called Virco on the NOC and they will get in there with in two weeks and do the required work. I talked to Palmer and Hanshumacher. The restoration did not pass on day of inspection. |
1732494069 | 2010-10-12 | Production Wells | No Violations | On day of inspection I called Bob Hanshumacher at Virco and met him at the site. There was a little erosion starting. Bob would get there tomorrow and rectify. Reseed and mulch. |
763636147 | 2008-11-25 0:00 | PW | No Violations |
For data sources see[9]