If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-067-21266 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.2540800885,"lon":-81.1674736196,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2013-12-05 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 0 | |
Latitude: 40.2540800885 | |
Longitude: -81.1674736196 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
-1649217841 | 2013-12-11 | I am on site today per request from American Energy Partners request to meet with me to go over the permit requirements and drilling questions they had for the Jones wells. | ||||
-1755861209 | 2013-12-05 | Express Drilling Rig is on site today to drill the 30" inch diameter conductor hole. They set 100 ft and O-Tex Cementing c/w 250 sks. | ||||
-427458697 | 2013-12-09 | I am here today to check on the conductor cement. Nomac 138 is moving in today, they have two trucks stuck on the hill and I received a call about it. | ||||
1389835155 | 2014-01-15 | I am on site tonight to witness the running and the cementing of the 16" casing string. Nomac Drilling Rig # 137 drilled a 22" inch diameter hole to 643 ft and set 631 ft of casing. O-Tex Cementing Service c/w 1020 sks of class H cement at 15.6 lbs and a yield of 1.2 - Had problems getting casing in the hole and the job ran over. | ||||
1391702375 | 2014-02-03 | Nomac Drilling Rig # 137 is finished with the well. They will be moving to the # 1-H well next. | ||||
1895988969 | 2014-01-29 | Nomac Drilling Rig # 137 is at 9148 ft drilling a 8.75 " inch diameter hole. They will move to the # 1-H after this well is complete. | ||||
1926895854 | 2013-01-22 | I am on site today to check on the drilling status of Nomac Drilling Rig # 137 and found them drilling at 2484 ft dusting while drilling a 9-7/8" inch diameter hole. | ||||
770319064 | 2014-01-15 | I arrived today to check on the drilling status of Nomac Drilling Rig # 137 because I had received a phone call at 5:30 this morning to inform me that they would be ready around noon. When I did not hear from them at 2 pm I wanted to check to make sure that they did not forget to call. I found that they are only at 450 ft and should be ready early this evening. |