If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-059-24139 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.0426675126,"lon":-81.5651378743,"icon":""}]} |
| County: | |
| Municipality: | |
| Operator Name: | |
| Well Pad ID: | |
| Farm/Lease Name: | |
| First Permit Date: | |
| Last Permit Date: | |
| Spud Date: 2010-04-23 | |
| Unconventional: | |
| Horizontal: | |
| Producing: No | |
| Violations: 0 | |
| Latitude: 40.0426675126 | |
| Longitude: -81.5651378743 |
| PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
|---|
| PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
|---|
| INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
|---|---|---|---|---|---|---|
| -1104040330 | 2010-07-19 | On site to witness frac job,7-300 bbl tanks were used for job 1460 psi was breakdown pressure and 1040 was ISIP and 985 PSI after 5 min shut in pressure,Producers Services preformed frac work at site.
There was 1 sand truck and 1 blender and 2 pumps trucks and 1 iron truck on site during frac job. |
||||
| 1272536742 | 2010-04-28 | On site to witness testing of blowout preventer,instructed rig operator to close BOP and pressure up to 500 psi and we monitored pressure for 15 min with no decline in pressure, while monitoring pressure we checked choke lines and assembly for any leakage none found.
Note: Right side choke assembly in need of possible replacement. |
||||
| 1272730282 | 2010-04-30 | Stopped by drilling rig(Bowman Drilling) they were drilling ahead@3620' noted on geolograph that top of big lime@3464' and top of Oriskany sand was@3554' hole still dry at that point | ||||
| 1273089775 | 2010-05-04 | Stopped by drilling operation to check on drilling depth they were 4750' drilling in Newburg section they put soap on hole@4705' encountered small amount of water, driller stated if all goes well they should be at total depth by late evening. | ||||
| 1626494468 | 2010-09-13 | Restoration work at site satisfactory pit has been filled in and site restored and vegetation has been established.
Note: Well is equipped with pumping unit and tubing and rods and 2-100 bbl tanks and 1-50 bbl plastic tank and separator with dike in place. |
||||
| 66472217 | 2010-07-16 | On site to witness running of bond log to determine cement top it was located@4240' and also witness perforations being shot perfed at 5048'-5110' 61 shots will frac well 7/19/10. |