Well Details

Well ID: 34-059-24139
Loading map...
Country: United States
State: Ohio
County: Guernsey
Municipality: Cambridge Township
Operator Name: DAVID R HILL INC
Well Pad ID:
Farm/Lease Name: MOSSER GLASS UNIT
License Status: Producing
License Date: 2010-01-04
Spud Date: 2010-04-23
Spud Drilling Contractor: BOWMAN DRILLING
Final Drill Date: 2010-05-05
Well Total Depth: 5275.00 ft
Configuration: Vertical
Latitude: 40.040000
Longitude: -81.560000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2010-01-04 Proposed Formations:CLINTON/MEDINA, Issued Date:1/4/2010, Expired Date:1/4/2011 6:00:00 AM, Drilling unit acres:49.493, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2010-05-05
Completion Report Received 2010-11-26
Construction Permit Expires 2011-01-04
Record Last Modified 2017-10-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2010-12-13 5048 5110 61
5048 5110 61
5048 5110 61

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 15 80000 Gal 40000 Producers Service Corporation

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2010 DAVID R HILL INC 541.00 715.00 123
2011 DAVID R HILL INC 4179.00 2252.00 365
2012 DAVID R HILL INC 3019.00 1175.00 366
2013 DAVID R HILL INC 2252.00 962.00 365
2014 DAVID R HILL INC 2064.00 663.00 365
2015 DAVID R HILL INC 1671.00 680.00 365
2016 DAVID R HILL INC 0.00 370.00 365
2017 DAVID R HILL INC 0.00 314.00 365
2018 DAVID R HILL INC 0.00 924.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2010 DAVID R HILL INC Brine 490 123
2011 DAVID R HILL INC Brine 345 365
2012 DAVID R HILL INC Brine 44 366
2013 DAVID R HILL INC Brine 80 365
2014 DAVID R HILL INC Brine 35 365
2015 DAVID R HILL INC Brine 224 365
2016 DAVID R HILL INC Brine 99 365
2017 DAVID R HILL INC Brine 0 365
2018 DAVID R HILL INC Brine 150 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1104040330 2010-7-19 0:00: CT No Violations 3.00
0066472217 2010-07-16 Completion Testing No Violations On site to witness running of bond log to determine cement top it was located@4240 and also witness perforations being shot perfed at 5048-5110 61 shots will frac well 7/19/10.
1010227288 2016-10-25 Production Wells No Violations On the day of my inspection I witnessed the production equipment included 2-140 barrel tanks, a 37 barrel polymer tank, a vertical separator, a drip, a 2 inch salesmeter with a .375 inch orifice and a chart recorder all within an earthen dike. The well was equipped with 8.625 inch casing, 4.5 inch casing, 2.875 inch tubing, 1.5 inch tubing, rods, a Bethlehem pumping unit powered by electricity with the power in the off position and all valves in closed position. Identification was present and production records were current.
1104040330 2010-07-19 Completion Testing No Violations On site to witness frac job,7-300 bbl tanks were used for job 1460 psi was breakdown pressure and 1040 was ISIP and 985 PSI after 5 min shut in pressure,Producers Services preformed frac work at site.

There was 1 sand truck and 1 blender and 2 pumps trucks and 1 iron truck on site during frac job.

1272536742 2010-04-28 Drill / Deepen / Reopen No Violations On site to witness testing of blowout preventer,instructed rig operator to close BOP and pressure up to 500 psi and we monitored pressure for 15 min with no decline in pressure, while monitoring pressure we checked choke lines and assembly for any leakage none found.

Note: Right side choke assembly in need of possible replacement.

1272730282 2010-04-30 Drill / Deepen / Reopen No Violations Stopped by drilling rig(Bowman Drilling) they were drilling ahead@3620 noted on geolograph that top of big lime@3464 and top of Oriskany sand was@3554 hole still dry at that point
1273089775 2010-05-04 Drill / Deepen / Reopen No Violations Stopped by drilling operation to check on drilling depth they were 4750 drilling in Newburg section they put soap on hole@4705 encountered small amount of water, driller stated if all goes well they should be at total depth by late evening.
1626494468 2010-09-13 Preliminary Restoration No Violations Restoration work at site satisfactory pit has been filled in and site restored and vegetation has been established.

Note: Well is equipped with pumping unit and tubing and rods and 2-100 bbl tanks and 1-50 bbl plastic tank and separator with dike in place.

66472217 2010-7-16 0:00: CT No Violations

For data sources see[9]

References