34-029-21813

Well Details

Well ID: 34-029-21813
Loading map...
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2013-07-08
Unconventional:
Horizontal:
Producing: No
Violations: 0
Latitude: 40.6852648666
Longitude: -80.9152115926

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
1373981969 2013-04-17 I went to the site and conducted a pre-construction site inspection with Steve Ault, Chesapeake Field Representative.
1377620091 2013-08-07
1459494311 2013-07-08 I stopped at the drilling pad to check on the conductor rig move-in progress. I found the pad largely built. The chain link fence to surround the pad was not yet installed. The dirt work appeared completed, and erosion prevention measures have been taken. The conductor rig was not yet on location. While there, a truck with conductor casing did arrive. The Pitts 22-14-4 3H and 8H were both staked. I took GPS readings for both wells, and the access road entry.
2115648082 2013-08-05
216272362 2013-07-14 While in the area for a cement job at another location, I stopped by to check on the move-in progress of the drilling rig. I found that preparations were underway, but no rig equipment was on site. Mat boards were down, secondary containment was staged, and a number of frac tanks and light plants were in place.
25229357 2013-07-09