Spud Date: 2005-10-28
Unconventional:
Horizontal:
Producing: No
Violations: 0
Latitude: 41.6587552925
Longitude: -81.3710626297

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
-1113554821 2009-12-02 A fix on the tank battery location was obtained. There were no violations.
-1623169524 2006-04-26 well not ready for perl restoration area graded
1357229771 2012-12-17 The unit is comprised of a two-tank battery (1 210-barrel production and 1 100-barrel brine) and a wellhead with mechanical plunger lift, and mechanical separator, each in separate wood board-on-board enclosures. The well is currently in production. The tank and well spacing is in accordance with 1509:9-9-05 . Unit identification is present and legible at the tank battery. The tank battery secondary containment is adequate although the dike drain is open. I did not observe any leaks, spills, or other signs of contamination. The gates are locked. I called Tim Reilly with Great Plains and advised him about the open dike drain. He advised that the item would be addressed by the pumper.
1936959199 2005-10-30 surface
374671345 2013-09-10 The producing unit consists of a wellhead with pumpjack system and aboveground storage tank battery. The battery, separator, and wellhead are in separate board-on-board enclosures. The battery is comprised of 1 210-barrel steel production tank, one 100-barrel steel brine tank, and separator unit. There is adequate secondary containment. There is no safety equipment as required by 1501:9-9-05E. Locks and signage are present. No signs of leaks, spills or problems. Preliminary restoration is pending the installation of safety equipment.