If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-089-26131 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.0421504525,"lon":-82.6477893522,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2013-05-20 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 0 | |
Latitude: 40.0421504525 | |
Longitude: -82.6477893522 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
-1881198709 | 2013-09-19 | This inspection was conducted as a preliminary restoration status check. The well was shut-in and does not have production lines hooked up. The area around the well has been graded and straw has been applied. Vegetation is starting to grow. Inspection revealed (1) 100 barrel tank on location not being used for production of the well. Preliminary restoration will be complete when tank is removed. | ||||
-542674342 | 2013-05-22 | I witnessed the cementing of the 8 inch surface casing today for Knox Energy on Kilbarger rig 5. Donnie with Knox Energy was on location. Petroset Cementing contracted to cement the casing. Circulation was established and good cement returns were observed. Cement stayed at the surface. No cement basket. | ||||
1797057356 | 2013-05-21 | I inspected drilling operations today. Kilbarger rig 5 drilling on fluid during inspection. Depth approximately 350 feet. No violations noted this date. | ||||
325949942 | 2013-11-25 | This inspection was conducted as a preliminary restoration status check. The well does not require a pumping unit. A GPS reading was taken at the wellhead. The area around the well has been restored. The well produces into a tank battery that consists of (1) 100 barrel tank, separator, and drip inside an earthen dike. Identification was posted at the tank battery. Inspection meets ORC 1509.072 requirements. Weather: 22 degrees F, Clear | ||||
645637213 | 2013-05-22 | An inspection of drilling operations revealed Kilbarger rig 5 drilling on fluid during inspection. Depth approximately 515 feet during inspection. No violations this date. |