X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-089-26131

Well Details

Well ID: 34-089-26131
Loading map...
Country: United States
State: Ohio
County: Licking
Municipality: Harrison Township
Operator Name: KNOX ENERGY INC.
Well Pad ID:
Farm/Lease Name: FOOR R
License Status: Producing
License Date: 2013-05-17
Spud Date: 2013-05-20
Spud Drilling Contractor: KILBARGER DRLG
Final Drill Date: 2013-05-24
Well Total Depth: 2197.00 ft
Configuration: Vertical
Latitude: 40.040000
Longitude: -82.640000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-05-17 Proposed Formations:OHIO SHALE THRU CLINTON (MAY NOT PRODUCE BEREA), Issued Date:5/17/2013, Expired Date:5/17/2015 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:EW
Reached Total Depth 2013-05-24 `
Correction to Well 2013-06-05 CORRECTION TO Y COORDINATE
Completion Report Received 2014-05-01 `
Construction Permit Expires 2014-05-17 `
Record Last Modified 2018-02-28 `

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2014-05-08 2092 2097 11
2092 2097 11
2092 2097 11

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2018-01-17 H2O 0 37000 Gal 20000 Producers Service Corporation I witnessed this frac job today. Knox Energy President Mark Jordan and Bill Mitton was on location for the job. Knox Energy contracted Producers Service Corp. (PSC) to frac the well. PSC used approximately 900 barrels of water, 200 sacks of sand, and 300 gallons of acid during the job.

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2014 KNOX ENERGY INC. 2832.00 0.00 231
2015 KNOX ENERGY INC. 7322.00 0.00 365
2016 KNOX ENERGY INC. 7998.00 0.00 365
2017 KNOX ENERGY INC. 3801.00 54.00 365
2018 KNOX ENERGY INC. 5107.00 476.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2014 KNOX ENERGY INC. Brine 0 231
2015 KNOX ENERGY INC. Brine 0 365
2016 KNOX ENERGY INC. Brine 0 365
2017 KNOX ENERGY INC. Brine 0 365
2018 KNOX ENERGY INC. Brine 4810 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1881198709 2013-9-19 0:00: PL No Violations
-2078736284 2020-3-26 0:00: PW No Violations 0.50
-542674342 2013-5-22 0:00: DD No Violations
-805673941 2018-1-17 0:00: CT No Violations 1.00
0325949942 2013-11-25 Preliminary Restoration No Violations This inspection was conducted as a preliminary restoration status check. The well does not require a pumping unit. A GPS reading was taken at the wellhead. The area around the well has been restored. The well produces into a tank battery that consists of (1) 100 barrel tank, separator, and drip inside an earthen dike. Identification was posted at the tank battery. Inspection meets ORC 1509.072 requirements. Weather: 22 degrees F, Clear
0542674342 2013-05-22 Drill / Deepen / Reopen No Violations I witnessed the cementing of the 8 inch surface casing today for Knox Energy on Kilbarger rig 5. Donnie with Knox Energy was on location. Petroset Cementing contracted to cement the casing. Circulation was established and good cement returns were observed. Cement stayed at the surface. No cement basket.
0645637213 2013-05-22 Drill / Deepen / Reopen No Violations An inspection of drilling operations revealed Kilbarger rig 5 drilling on fluid during inspection. Depth approximately 515 feet during inspection. No violations this date.
0805673941 2018-01-17 Completion Testing No Violations I witnessed the frac job on this well today. The well was not fraced after it was drilled. Knox Energy contracted Producers Service Corporation for the job. The job began at 11:30 AM and finished at 1:00 PM. No problems were encountered during the job. Knox Energy President Mark Jordan and Bill Mitton were on location. I received the ticket when the job was complete. Refer to the stimulation report for details. Time of inspection: 10:30 AM. Weather: 10*F, Snowing.
1797057356 2013-05-21 Drill / Deepen / Reopen No Violations I inspected drilling operations today. Kilbarger rig 5 drilling on fluid during inspection. Depth approximately 350 feet. No violations noted this date.
1881198709 2013-09-19 Preliminary Restoration No Violations This inspection was conducted as a preliminary restoration status check. The well was shut-in and does not have production lines hooked up. The area around the well has been graded and straw has been applied. Vegetation is starting to grow. Inspection revealed (1) 100 barrel tank on location not being used for production of the well. Preliminary restoration will be complete when tank is removed.
325949942 2013-11-25 0:00 PL No Violations
645637213 2013-5-22 0:00: DD No Violations

For data sources see[9]

References