If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-073-21224 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.5095983904,"lon":-82.4040043042,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 1966-05-17 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 9 | |
Latitude: 39.5095983904 | |
Longitude: -82.4040043042 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
-1387179794 | 2004-06-02 | Follow-up on NOV, In-Compliance. | ||||
-139507890 | 2008-11-24 | A follow-up inspection revealed that the final restoration does not meet requirements. It was noted that the tanks have now been removed. The area surrounding this location (earthen dike) has been graded, seeded and mulched. The flowline to include steel and plastic and joint of 8" casing have not been removed from property. Spoke with Mr. Ron McBride, Chieftain Energy Contractor, at the location. He states that they will finish the restoration by the end of the week. | ||||
-1459066347 | 2008-11-03 | A follow-up inspection revealed non-compliance. Seed and straw observed along the lease road and well site. Flowline still remains along with tanks. In addition, the earthen dike will need to be graded. | ||||
-1537650522 | 2003-06-25 | Follow-up on NOV, In-Compliance. | ||||
-1679982956 | 2008-03-07 | Witnessed bottom plug. | ||||
-1681677063 | 2009-07-23 | A follow-up inspection revealed non-compliance. | ||||
-1799055055 | 2008-03-11 | Checked on plugging. Clay has been washed to the surface. Doug Kitchen was informed to address the lease road once all vehicles have left the well site. The lease road is eroding onto Nickel Plate Road. | ||||
-1801685770 | 2009-07-20 | A follow-up inspection to a Notice of Violation and Compliance Agreement Schedule revealed non-compliance. It was noted that the company is working towards compliance. More production line will need to be removed though. Prior to this inspection, a 7/14/2009 meeting had been conducted with both Mr. Doug Kitchen, the well owner, and Mr. Ron McBride, Chieftain Energy Contractor. During the meeting a Compliance Schedule was agreed upon by both parties. The deadline for compliance was 7/17/2009. | ||||
-2030185879 | 2009-07-22 | A follow-up inspection to a Notice of Violation and Compliance Agreement Schedule revealed non-compliance. The well owner is working towards compliance, as evidence of production line removal since 7/20/2009. | ||||
-2115363081 | 2006-01-05 | Follow-up on NOV, In-Complaince, acoording to Doug Kitchen well is selling gas. | ||||
-234571408 | 2005-11-09 | An inspection of the well revealed the well has not produced for several years, according to landowner. All equipment on well. | NONE | |||
-234571408 | 2005-11-09 | An inspection of the well revealed the well has not produced for several years, according to landowner. All equipment on well. | NONE12 | |||
-234571408 | 2005-11-09 | An inspection of the well revealed the well has not produced for several years, according to landowner. All equipment on well. | NONE2 | |||
-287520654 | 2008-03-10 | Witnessed lime plug. | ||||
-49803210 | 2009-07-28 | A follow-up inspection was conducted with Mr. Robert Stonerock, Oil & Gas South Region Supervisor. During the inspection, it was noted that production line has been removed. Final Restoration meets requirements. | ||||
-68644682 | 2008-09-11 | An inspection revealed that the final restoration does not meet requirements. The lease road was observed to contain 2-4' ruts starting from entrance to a turn around located at the top of the hill. 1-3' ruts were observed around the well site. Flowline consisting of plastic and steel were observed in several locations around the well site and tank battery. (2) 100 bbl tanks surrounded by an earthen dike were observed along the hillside of Nickel Plate Road. A bare area was observed directly below this dike to include a roadside ditch. Salt crystals were also observed at this location. Quantab placed in fluid showed 6.8 units. A letter had been sent to Mr. Doug Kitchen serving as a reminder that the final restoration would be due on 9/11/2008. | NONEA | |||
-68644682 | 2008-09-11 | An inspection revealed that the final restoration does not meet requirements. The lease road was observed to contain 2-4' ruts starting from entrance to a turn around located at the top of the hill. 1-3' ruts were observed around the well site. Flowline consisting of plastic and steel were observed in several locations around the well site and tank battery. (2) 100 bbl tanks surrounded by an earthen dike were observed along the hillside of Nickel Plate Road. A bare area was observed directly below this dike to include a roadside ditch. Salt crystals were also observed at this location. Quantab placed in fluid showed 6.8 units. A letter had been sent to Mr. Doug Kitchen serving as a reminder that the final restoration would be due on 9/11/2008. | NONEB | |||
-711368116 | 2008-10-22 | A follow-up inspection revealed non-compliance. | ||||
-93093346 | 2008-03-14 | Checked on status of lease road. The inspection revealed no discharge onto the road. | ||||
-987830318 | 2004-04-27 | Follow-up on NOV, Non-Compliance. | ||||
1020380830 | 2008-01-02 | Meeting with Mr. Doug Kitchen and Mr. Joe Hoerst regarding Chiefs Order. Mr. Kitchen has agreed to plug this well within 30 days. | ||||
1027536469 | 2008-09-30 | Checked on status of final restoration. Chieftain Energy has acquired a contractor to perform the grading of the well site and lease road. At the time of the inspection, work was being performed on the well site. | ||||
1101787089 | 2009-06-18 | A follow-up inspection revealed non-compliance. Plastic and steel line remains on the property. | ||||
1149518553 | 2009-05-27 | A follow-up inspection revealed non-compliance. | ||||
1196434521 | 2007-11-29 | A follow-up inspection revealed non-compliance. Request Chiefs Order. | ||||
1306548072 | 2007-03-12 | A follow-up inspection revealed that well is not in-compliance. Mr. Doug Kitchen, Chieftain Energy, states that the well is capable of producing, but is not making any oil. Production records show that the last year of production was 2003. Mr. Kitchen states that he will be plugging this well. | ||||
1361765712 | 2008-02-25 | Checked on status of well. It was noted that Mr. Doug Kitchen has pulled the rods from this well with his crane. Currently, he is working on pulling the tubing. | ||||
1402458383 | 2008-03-06 | An inspection revealed that a plugging rig has moved onto the well. | ||||
1463694852 | 2009-05-15 | An inspection revealed that the final restoration does not meet requirements. Steel and plastic line remain on the property. | NONEA | |||
149772676 | 2002-10-29 | An inspection of the well revealed the well is idle and not in production. According to landowner he has not received any money from well in 6 or 7 yrs., also well has not produced for at least that amount of time. WELL NEEDS TO BE PUT INTO PRODUCTION AN | ||||
1499788287 | 2008-08-14 | A telephone message was left for Mr. Doug Kitchen to serve as a reminder that the final restoration is due on 9/11/2008. | ||||
1556938612 | 2008-12-08 | A follow-up inspection revealed non-compliance. Chieftain Energy has not removed flowline and joint of 8" casing. | ||||
1701049259 | 2004-03-30 | Follow-up on NOV, Non-Compliance. | ||||
2103010799 | 2008-10-15 | A follow-up inspection revealed non-compliance. | ||||
2140344413 | 2003-01-24 | Follow-up on NOV, Non-Compliance, according to landowner well still idle, still have not received any monies. | ||||
248537466 | 2008-02-05 | A follow-up inspection revealed non-compliance. Mr. Doug Kitchen stated that his crew was removing the tanks and would begin pulling rods. Mr. Kitchen had also stated that he would be utilizing his crane to pull the rods. No observed activity or equipment. | ||||
259850739 | 2008-11-12 | A follow-up inspection revealed non-compliance. | ||||
26534711 | 2008-10-07 | A follow-up inspection revealed non-compliance. The lease road and well site has been graded. No vegetation was observed during the inspection. Chieftain Energy will be applying seed and straw. The 100 bbl tanks need removed and earthen dike graded. Flowline still observed near the well site and tank battery. | ||||
374941389 | 2008-03-18 | Checked on status of lease road. It was noted that more work would be needed when final restoration is performed. Mr. Doug Kitchen has placed bails of hay at edge of lease road. | ||||
406440200 | 2009-01-09 | A follow-up inspection revealed that the previously noted violations have been resolved. The company has removed flowline and a culvert located at the entrance into the property. Due to winter conditions (i.e. snow cover), the final restoration will be evaluated in the Spring to ensure that vegetative cover has been established. | ||||
648985236 | 2008-03-13 | Checked on status of the lease road to ensure that soil was not discharging onto Nickel Plate Road. It was noted that the lease road is no longer washing onto the road. The lease road was observed to be washing into a roadside ditch. Also noted was that the placement of soil at top of the lease road has allowed for a discharge over a hill and into roadside ditch. Mr. Kitchen was given a BMP manual. | ||||
803485790 | 2007-07-16 | On 7/16/2007, a telephone message was left for Mr. Doug Kitchen at 9:20am regarding the status of the Armstrong #2, Cribbs #1, England Pace #1 and Vinton County wells, all of which have exceeded compliance deadlines. Furthermore, stating that if these wells are not placed back into production or plugged a Chiefs Order will be issued. | ||||
897707156 | 2006-12-05 | A complaint was received by the ODNR. This complaint was alleging that the Thomas Cribbs #1 well was idle. An inspection conducted on 12/5/2006 revealed that this well was idle. According to the production records, the last year of production was 2003. Chieftain Energy was contacted and instructed to plug or produce this well. | NONE | |||
927095943 | 2007-07-30 | Contacted Mr. Doug Kitchen on 7/30/2007 at 9:25am. Mr. Kitchen states that he has a plugging application for the Cribbs #1 well. Furthermore, stating that he will be submitting this application to the Division. | ||||
980399962 | 2004-02-25 | An inspection of the well revealed no ID at the well or tank battery, dike does not meet SPCC requirements. | 9-9-05(A)10 | |||