Well Details

Well ID: 34-155-24036
Loading map...
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2011-01-25
Unconventional:
Horizontal:
Producing: No
Violations: 0
Latitude: 41.1902577202
Longitude: -80.5810074844

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
1024673898 2013-10-24 My inspection found the well in production. The well was equipped with a plunger lift unit. The separator was in good condition. There were chain link fences surrounding the well and separator with no locks. The tank battery contained a 210 barrel production tank and a 50 barrel brine tank. Both tanks were anchored to concrete blocks. The dike met containment requirements. The proper identification signs were posted at the well and production tank. There was no safety equipment installed on the production tank. The site was graded and vegetation was well established. All debris was removed. Drainage and erosion controls were in place. The lease road was in good working condition. I called the well tender, Rusty, at 330-519-3761. I instructed Rusty to install locks on the fence gates at the well and separator. Also, I told Rusty that safety equipment needed to be installed on the production tank.
1134179649 2011-10-31
1299157079 2011-02-10 Met with Justin Caldwell w/ Pac Drilling , Alex Kostra w/ Army Corp of Engineers and Ed Wilk w/ OEPA On wellsite area . We walked over wellsite and lease road areas . We then discussed possible wetlands impact where culverts were plased in lease road . Ed or Alex could not make a determination if wetlands had been affected or not . Ed advised me the Corp or OEPA Needed to be contacted if any stream was to be crossed before any construction occurred to determine possible wetland impact . NOTE: Verbal approval from Alex Kostra to place mud boat in main stream to Myself and Justin Caldwell if Justin applied for tempoary permit for stream crossing .
1305290941 2011-01-13 On site for well construction .
1318603317 2011-10-14 The 210 barrel and a poly tank were both anchored down. The dike walls need built-up. The well and tank battery need a fence.