34-119-24439

Well Details

Well ID: 34-119-24439
Loading map...
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 1978-10-22
Unconventional:
Horizontal:
Producing: No
Violations: 0
Latitude: 39.7706008347
Longitude: -81.8155588826

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
-1058107363 2012-10-10 Inspection revealed that injection pump was not in operation during my inspection.

Note: Exposed portion of liner in tank area needs to be covered with material so sunlight does not rot it out and open trash pit next to tank area needs to be filled in and trash hauled to a landfill.

-132140294 2011-12-29 On day of inspection no violations noted.Facility is in compliance.
-1830867540 2013-12-12 Inspection revealed that injection pump was not in operation during my inspection and it was noted that one company owned vacuum truck was unloading at facility during my inspection.
-1864179793 2012-03-22 On day of inspection well is not pumping. There are no violations present.
-2092381962 2013-04-03 Inspection revealed that injection pump was not in operation during my inspection and it was noted that one company owned vacuum truck was unloading at facility during my inspection.

Note: Walked flow line area to check for possible leaks none were found today.

-319232259 2012-12-05 Inspection revealed that injection pump was not in operation during my inspection and it was noted that exposed portion of pit liner still needs to be covered with stone to help prevent rotting due to exposure to sunlight.
-369072198 2012-01-25 On day of inspection there were no violations noted.Well was not pumping.
-536715201 2012-05-17 On day of inspection no violation noted.Dave Ball made suggestion of gravel on pit liner because of break down.
-582380800 2014-07-21 Inspection revealed that injection pump was not in operation during my inspection.
-689855329 2014-01-29 Inspection revealed that injection pump was in operation during my inspection and it was noted that one Enervest Operating vacuum truck was unloading at facility during my inspection.
-825196087 2013-09-18 Inspection revealed that injection pump was not in operation during my inspection.

Note: Walked flow line area to monitor area for leakage none were noted on this day.

1270087787 2013-07-05 Inspection revealed that injection pump was not in operation during my inspection .

Note: Walked flowline area to monitor for possible leaks,none were found on this day.

1330657832 2012-02-22 On day of inspection well was not being pumped into. Well and Facility in good working order.
1384806256 2013-11-18 Inspection revealed that owner has covered exposed portions of liner as requested by inspector and it was noted that company owned water truck was unloading at facility during my inspection.
1623066692 2009-04-09 Pressured up on backside and well passed MIT. Well was supposed to have been plugged years ago by previous owner. Current owener wants to put the well back in use. Will do an injection test to see if well can take fluid at < the maximum injection pressure. No tank battery.
1760483633 2011-11-18 In process of building facility. They are preparing to pour dike walls for unloading pad. A liner was placed on the dike walls around tanks. The tanks were set and painted. The chain link fence is also in place. The pump house is built.
2006771008 2013-09-27 On site to witness owner apply positive pressure to annulus of tubing , on my last inspection pressure was at zero so I contacted Josh Adams and requested that he apply pressure to annulus of tubing to ensure that they had good casing integrity.
29663923 2011-12-05 JM Adams and I met and tested the annulas at 420psi.The flow line was also tested at 420 psi.All tests passed.
342274625 2014-05-14 Inspection revealed that injection pump was not in operation today and it was noted that company owned vacuum truck was parked on unloading on the day of my inspection.
901207658 2012-05-17 Inspection on this day revealed that injection pump was in operation when I arrived on site but by the time I walked to wellhead it had shut off and it was noted that pit liner in tank area needs to be covered with stone to help prevent damage to liner due to exposure to the sunlight.
UIC1112 1991-06-21 1501:9-3-07 (E) & (F) 1ST.QTR. 1991 RPT.