If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-119-28742 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.1594911678,"lon":-82.1536702548,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2011-09-22 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 0 | |
Latitude: 40.1594911678 | |
Longitude: -82.1536702548 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
-1460442325 | 2011-10-21 | Stopped by rig and they had left for the week end. No violations noted . | ||||
-1642979960 | 2012-01-20 | On day of inspection cable rig was drilled to total depth of 3117'. Operator was sand pumping well.Rig operator stated that frac was on 1-23-12 at 8:00am. | ||||
-277689669 | 2011-12-28 | On day of inspection rig is at depth of 2960'.Bottom of lime is at 2895. | ||||
-442979429 | 2012-01-13 | On day of inspection cable rig was drilling at a depth of 3080'.Started into the clinton formation. | ||||
-764391486 | 2011-10-11 | Rig is drilling through the Berea at a depth of 743'. | ||||
1045297275 | 2011-11-01 | Rig was drilling at depth of 1560' in the Big Cinnamon. They drilled into this formation at 1510'. | ||||
1131961116 | 2012-01-09 | On day of inspection B&J cable rig set 5.5casing for production.Cemenco set cement in place .Good circulation.Set pipe above formation and rig will drill thru and produce open hole or thru liner. | ||||
116613770 | 2011-10-04 | Rig set surface casing. Cemenco cemented casing with good circulation established. | ||||
1327464595 | 2012-01-05 | On day of inspection Drilling rig is at a depth of 3045'.Rig is presently drilling in the Gray Shale. | ||||
1536972854 | 2011-11-25 | Drilling at depth of 2400'.Still into lime. | ||||
452883776 | 2011-09-28 | On day of inspection the rig is drilling 10 hole. The rig spudded on 9-22-11. | ||||
543044510 | 2011-11-18 | Drilling into the Big Lime at depth of 2190'. Top of the Big Lime is at 2005'. | ||||
687894524 | 2012-09-14 | Preliminary Restoration has passed on 9-14-12 by Patrick Shreve. Well is equipped with artificial lift system and two 100 barrel tanks. Dike and id are in place. | ||||
809707426 | 2011-12-01 | Drilling at depth of 2575'.Still in the lime. |