X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-119-28742

Well Details

Well ID: 34-119-28742
Loading map...
Country: United States
State: Ohio
County: Muskingum
Municipality: Jackson Township
Operator Name: DONALD BYERS OIL & GAS LLC
Well Pad ID:
Farm/Lease Name: WOLFORD
License Status: Producing
License Date: 2011-09-09
Spud Date: 2011-09-22
Spud Drilling Contractor: B & J DRLG
Final Drill Date: 2012-01-18
Well Total Depth: 3142.00 ft
Configuration: Vertical
Latitude: 40.150000
Longitude: -82.150000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2011-09-09 Proposed Formations:CLINTON, Issued Date:9/9/2011, Expired Date:9/8/2013 12:00:00 PM, Drilling unit acres:88, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2012-01-18
Completion Report Received 2012-03-07
Construction Permit Expires 2013-09-08
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2012-03-21 3070 3142 0
3070 3142 0
3070 3142 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2012-01-23 H2O 0 58184 Gal 30000 Universal Well Services Inc.

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2012 DONALD BYERS OIL & GAS LLC 0.00 2143.00 366
2013 DONALD BYERS OIL & GAS LLC 0.00 1041.00 365
2014 DONALD BYERS OIL & GAS LLC 0.00 668.00 365
2015 DONALD BYERS OIL & GAS LLC 0.00 490.00 365
2016 DONALD BYERS OIL & GAS LLC 0.00 386.00 365
2017 DONALD BYERS OIL & GAS LLC 0.00 373.00 365
2018 DONALD BYERS OIL & GAS LLC 0.00 307.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2012 DONALD BYERS OIL & GAS LLC Brine 1110 366
2013 DONALD BYERS OIL & GAS LLC Brine 330 365
2014 DONALD BYERS OIL & GAS LLC Brine 140 365
2015 DONALD BYERS OIL & GAS LLC Brine 75 365
2016 DONALD BYERS OIL & GAS LLC Brine 150 365
2017 DONALD BYERS OIL & GAS LLC Brine 75 365
2018 DONALD BYERS OIL & GAS LLC Brine 70 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1460442325 2011-10-21 0:00 DD No Violations 0.50
-1642979960 2012-1-20 0:00: DD No Violations 1.00
-277689669 2011-12-28 0:00 DD No Violations 1.00
-442979429 2012-1-13 0:00: DD No Violations 2.00
-764391486 2011-10-11 0:00 DD No Violations 1.00
0116613770 2011-10-04 Drill / Deepen / Reopen No Violations Rig set surface casing. Cemenco cemented casing with good circulation established.
0277689669 2011-12-28 Drill / Deepen / Reopen No Violations On day of inspection rig is at depth of 2960.Bottom of lime is at 2895.
0442979429 2012-01-13 Drill / Deepen / Reopen No Violations On day of inspection cable rig was drilling at a depth of 3080.Started into the clinton formation.
0452883776 2011-09-28 Drill / Deepen / Reopen No Violations On day of inspection the rig is drilling 10 hole. The rig spudded on 9-22-11.
0543044510 2011-11-18 Drill / Deepen / Reopen No Violations Drilling into the Big Lime at depth of 2190. Top of the Big Lime is at 2005.
0687894524 2012-09-14 Preliminary Restoration No Violations Preliminary Restoration has passed on 9-14-12 by Patrick Shreve. Well is equipped with artificial lift system and two 100 barrel tanks. Dike and id are in place.
0764391486 2011-10-11 Drill / Deepen / Reopen No Violations Rig is drilling through the Berea at a depth of 743.
0809707426 2011-12-01 Drill / Deepen / Reopen No Violations Drilling at depth of 2575.Still in the lime.
1045297275 2011-11-01 Drill / Deepen / Reopen No Violations Rig was drilling at depth of 1560 in the Big Cinnamon. They drilled into this formation at 1510.
1131961116 2012-01-09 Drill / Deepen / Reopen No Violations On day of inspection B&J cable rig set 5.5casing for production.Cemenco set cement in place .Good circulation.Set pipe above formation and rig will drill thru and produce open hole or thru liner.
116613770 2011-10-4 0:00: DD No Violations 2.00
1327464595 2012-01-05 Drill / Deepen / Reopen No Violations On day of inspection Drilling rig is at a depth of 3045.Rig is presently drilling in the Gray Shale.
1460442325 2011-10-21 Drill / Deepen / Reopen No Violations Stopped by rig and they had left for the week end. No violations noted .
1536972854 2011-11-25 Drill / Deepen / Reopen No Violations Drilling at depth of 2400.Still into lime.
1642979960 2012-01-20 Drill / Deepen / Reopen No Violations On day of inspection cable rig was drilled to total depth of 3117. Operator was sand pumping well.Rig operator stated that frac was on 1-23-12 at 8:00am.
452883776 2011-9-28 0:00: DD No Violations 1.00
543044510 2011-11-18 0:00 DD No Violations
687894524 2012-9-14 0:00: PL No Violations 1.00
809707426 2011-12-1 0:00: DD No Violations 2.00

For data sources see[9]

References