Spud Date: 2011-10-03
Unconventional:
Horizontal:
Producing: No
Violations: 3
Latitude: 39.1475829247
Longitude: -81.9005328112

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
-1090736016 2012-06-11 The area was partially graded and seeded and mulched. Area still needs to be fully graded and erosion must be under control. I met with Jon Kent of Mountaineer Energy and we discussed completing the restoration. We also spoke about the erosion issues the landowner is having with her barn.
-1689560625 2012-05-21 Met with Tom Stone of Mountaineer State Operations to discuss erosion issues at well and remediation.
-1763720610 2012-10-31 Follow up to inspection -695586936. The vegetative cover is returning. The erosion control methods that have been emplaced appears to be working. The drain pipe has been replaced. The land owner is having a new garage installed and those operations have used the lower portion of the lease road. The garage installation has disturbed the soil around the entrance to the lease road.
-2033864094 2012-04-27 Area has not been graded and vegetative cover has not been established. Area shall be graded and vegetative cover shall be established in order to prevent erosion. NONE5
-2113594048 2011-10-04 Surface casing cement job. 683.1' of new 9 5/8" casing cemented into 690' of 12.25" borehole with 290 sacks of class A cement containing 500 lb of gel, 75 lb of CaCl, 240 lb of LCM, and 2 quarts of polymer. Circulation established and good cement returns at surface.
-288150667 2012-01-21 Well is connected for annular disposal (AD). AD line is connected to two 100 barrel steel tanks and a mechanical separator located with in a dike. A portable steel tank is also connected for AD. Pictures of well connections and tank connections were taken. Accompanied by Josh Garland MRI.
-456505269 2011-10-05 Fresh water AD test on surface casing. Passed test.
-591781255 2011-10-11 Total depth reached at 1999'. Well to be logged and longstring cemented tonight.
-695586936 2012-09-27 Failure to complete the initial restoration requirements as required under division (A) of section 1509.072 of the Revised Code. An oblong area around the wellhead roughly 165' on each side and 36' wide in the front while 240' wide in the back is void of vegetative cover. Significant erosion and sedimentation is occurring along the lease road and effecting the foundation of the landowners barn. The barn is less than 20' downhill from the point of greatest erosion impact. The Photos taken. The owner or the owner's agent shall grade or terrace and plant, seed, or sod the area disturbed that is not required in production of the well where necessary to bind the soil and prevent substantial erosion and sedimentation. Failure to comply with in the given time period will result in a material and substantial violation. NONE5
-797392741 2011-10-03 Inspection of surface casing cementing. Lasted 12 hours total, from 4:30PM 10-3-11 to 4:45AM 10-4-11. Crooked hole unable to successfully run surface casing. Dropped 300' of casing in hole and began fishing it out.
-943989366 2012-10-18 Follow up to violation #479784943. The area has been reseeded and mulched. A trench has been dug across the entrance to the site in order to divert water run-off away from the barn.
1317648890 2011-10-03 Drilling status check. Pit is lined and looks large enough to handle Injun water. Drilling at approximately 360'.
1319212198 2011-10-21 Witnessed frac job on the Sheets 168. 2500 PSI-breakdown, ~12.5 Bbl/min at ~1000 PSI, 200 sacks of 20/40 sand used with 5999 total barrels of water. Initial shut in pressure (ISIP)-760, and after 5 minutes pressure was 720 PSI.
1328637992 2012-02-07 The pit is being drained and a dozer is on site.
1328637992 2012-02-07 The pit is being drained and a dozer is on site.
1330004333 2012-02-23 The pit has been completely filled in.
141148562 2012-01-23 Observed lease road for brine hauling activity into well site. No brine trucks observed hauling water into well site.
1876468945 2012-02-24 Inspected well site with Josh Garland MRI and Gene Chini Oil and Gas Supervisor. Informed Tom Stone and John Kent of Mountaineer that they cannot haul water to the well site for annular disposal and that they must remove the portable tank and line that is connected to the annulus.
2073076286 2012-02-02 The Frac Tank has been removed and the annular disposal is functioning normally. The pit level has been lowered and is no longer overflowing. Brine trucks will be hauling the pit water out today and tomorrow and the company should begging closing the pit early next week.
2073076286 2012-02-02 The Frac Tank has been removed and the annular disposal is functioning normally. The pit level has been lowered and is no longer overflowing. Brine trucks will be hauling the pit water out today and tomorrow and the company should begging closing the pit early next week.
2073621040 2012-06-25 The equipment has been removed and vegetation has returned. There are still areas of the site which need gradede.
21257422 2012-02-06 The pit level has been lowered but is not empty.
21257422 2012-02-06 The pit level has been lowered but is not empty.
316873816 2012-01-27 The water level had over topped the pit and had spilled out onto the ground. The field supervisor says the company had been emptying the pit by truck. I saw evidence of this in the fact there was a pump truck hose laying on the ground at the well site. The area got almost 2 inches of rain yesterday. I spoke with the field supervisor and told him he needed to keep the fluid levels down regardless of the weather. Pit shall be closed as soon as possible.
316873816 2012-01-27 The pit overflowed and had spilled out onto the ground. This area got almost 2" of rain yesterday. The field supervisor said the company had been emptying the pit by truck and I saw evidence of this as there was a pump truck hose laying on the ground at the well site. I told him he needed to keep the fluid levels down regardless of the weather. The pit shall be closed as soon as possible.
415065574 2012-05-24 The tanks have been removed from the site and the hill is being restored to its original grade to prevent erosion.
479784943 2012-01-24 Preliminary restoration inspection. The pit was not closed yet and the liner had fallen down in many places. The pit level had overflown. Pit water was running down the landowners driveway. Pit shall immediately be drained and liner shall be pulled back into place. All pits used for drilling shall be closed two months after completion of a well. A 2 inch line was connected to a frac tank on site near the well. The line was temporarily being used to dispose of saltwater from the well down the annulus. Now that the permanent Annular Disposal setup is complete the temporary setup shall be removed. NONE3
815310184 2012-02-13 The pit is being closed.
893184956 2012-09-27 Inspection #2033864094 has been voided because violation was given verbally. A written violation is being issued to the company today.