If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-105-23683 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.14,"lon":-81.9,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Meigs | |
Municipality: Orange Township | |
Operator Name: MOUNTAINEER STATE OPERATIONS L | |
Well Pad ID: | |
Farm/Lease Name: SHEETS MARY M | |
License Status: Producing | |
License Date: 2015-01-26 | |
Spud Date: 2011-10-03 | |
Spud Drilling Contractor: MONROE DRILLING OPERATION, LLC | |
Final Drill Date: 2011-10-11 | |
Well Total Depth: 1840.00 ft | |
Configuration: Vertical | |
Latitude: 39.140000 | |
Longitude: -81.900000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2011-09-15 | Proposed Formations:BEREA, Issued Date:9/15/2011, Expired Date:9/14/2013 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:EOUT |
Reached Total Depth | 2011-10-11 | |
Last Compliance Report | 2011-11-08 | |
APP | 2015-01-26 | Proposed Formations:SHALE, Issued Date:1/26/2015, Expired Date:1/25/2017 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL |
Completion Report Received | 2015-10-08 | |
Construction Permit Expires | 2017-01-25 | |
Record Last Modified | 2017-10-23 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2015-10-09 | 1830 | 1842 | 0 |
1830 | 1842 | 0 | |
1830 | 1842 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 1200 Bbl | 0 | Universal Well Services Inc. |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2012 | MOUNTAINEER STATE OPERATIONS L | 34.00 | 0.00 | 61 |
2013 | MOUNTAINEER STATE OPERATIONS L | 0.00 | 0.00 | 0 |
2014 | MOUNTAINEER STATE OPERATIONS L | 0.00 | 0.00 | 0 |
2015 | MOUNTAINEER STATE OPERATIONS L | 0.00 | 0.00 | 0 |
2016 | MOUNTAINEER STATE OPERATIONS L | 0.00 | 0.00 | 365 |
2017 | MOUNTAINEER STATE OPERATIONS L | 327.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2012 | MOUNTAINEER STATE OPERATIONS L | Brine | 0 | 61 |
2013 | MOUNTAINEER STATE OPERATIONS L | Brine | 0 | 0 |
2014 | MOUNTAINEER STATE OPERATIONS L | Brine | 0 | 0 |
2015 | MOUNTAINEER STATE OPERATIONS L | Brine | 70 | 0 |
2016 | MOUNTAINEER STATE OPERATIONS L | Brine | 0 | 365 |
2017 | MOUNTAINEER STATE OPERATIONS L | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1090736016 | 2012-6-11 0:00: | PL | No Violations | 1.50 |
-1689560625 | 2012-5-21 0:00: | AM | No Violations | 0.50 |
-1763720610 | 2012-10-31 0:00 | PL | No Violations | |
-1768690712 | 2015-3-19 0:00: | DD | No Violations | 1.50 |
-2033864094 | 2012-4-27 0:00: | PL | No Violations | 0.50 |
-2113594048 | 2011-10-4 0:00: | DD | No Violations | 4.50 |
-288150667 | 2012-1-21 0:00: | AD | No Violations | |
-456505269 | 2011-10-5 0:00: | AD | No Violations | |
-567078350 | 2017-3-14 0:00: | PW | No Violations | 1.20 |
-591781255 | 2011-10-11 0:00 | DD | No Violations | 0.50 |
-695586936 | 2012-9-27 0:00: | PL | No Violations | 1.50 |
-797392741 | 2011-10-3 0:00: | DD | No Violations | 12.00 |
-943989366 | 2012-10-18 0:00 | DD | No Violations | 1.00 |
0021257422 | 2012-02-06 | Preliminary Restoration | No Violations | The pit level has been lowered but is not empty. |
0141148562 | 2012-01-23 | Annular Disposal | No Violations | Observed lease road for brine hauling activity into well site. No brine trucks observed hauling water into well site. |
0288150667 | 2012-01-21 | Annular Disposal | No Violations | Well is connected for annular disposal (AD). AD line is connected to two 100 barrel steel tanks and a mechanical separator located with in a dike. A portable steel tank is also connected for AD. Pictures of well connections and tank connections were taken. Accompanied by Josh Garland MRI. |
0316873816 | 2012-01-27 | Preliminary Restoration | No Violations | The water level had over topped the pit and had spilled out onto the ground. The field supervisor says the company had been emptying the pit by truck. I saw evidence of this in the fact there was a pump truck hose laying on the ground at the well site. The area got almost 2 inches of rain yesterday. I spoke with the field supervisor and told him he needed to keep the fluid levels down regardless of the weather. Pit shall be closed as soon as possible. |
0415065574 | 2012-05-24 | Drill / Deepen / Reopen | No Violations | The tanks have been removed from the site and the hill is being restored to its original grade to prevent erosion. |
0456505269 | 2011-10-05 | Annular Disposal | No Violations | Fresh water AD test on surface casing. Passed test. |
0479784943 | 2012-01-24 | Preliminary Restoration | Violations Noted | Preliminary restoration inspection. The pit was not closed yet and the liner had fallen down in many places. The pit level had overflown. Pit water was running down the landowners driveway. Pit shall immediately be drained and liner shall be pulled back into place. All pits used for drilling shall be closed two months after completion of a well. A 2 inch line was connected to a frac tank on site near the well. The line was temporarily being used to dispose of saltwater from the well down the annulus. Now that the permanent Annular Disposal setup is complete the temporary setup shall be removed. |
0567078350 | 2017-03-14 | Production Wells | No Violations | Inspection of this well found a gas well. The valve appeared to be cracked open there was a chart in the mete dated 2/28/17. This well is producing gas from the back side of the 2 inch diameter tubing. |
0591781255 | 2011-10-11 | Drill / Deepen / Reopen | No Violations | Total depth reached at 1999. Well to be logged and longstring cemented tonight. |
0695586936 | 2012-09-27 | Preliminary Restoration | Violations Noted | Failure to complete the initial restoration requirements as required under division (A) of section 1509.072 of the Revised Code. An oblong area around the wellhead roughly 165 on each side and 36 wide in the front while 240 wide in the back is void of vegetative cover. Significant erosion and sedimentation is occurring along the lease road and effecting the foundation of the landowners barn. The barn is less than 20 downhill from the point of greatest erosion impact. The Photos taken. The owner or the owners agent shall grade or terrace and plant, seed, or sod the area disturbed that is not required in production of the well where necessary to bind the soil and prevent substantial erosion and sedimentation. Failure to comply with in the given time period will result in a material and substantial violation. |
0797392741 | 2011-10-03 | Drill / Deepen / Reopen | No Violations | Inspection of surface casing cementing. Lasted 12 hours total, from 4:30PM 10-3-11 to 4:45AM 10-4-11. Crooked hole unable to successfully run surface casing. Dropped 300 of casing in hole and began fishing it out. |
0815310184 | 2012-02-13 | Preliminary Restoration | No Violations | The pit is being closed. |
0893184956 | 2012-09-27 | Administrative Inspection | No Violations | Inspection #2033864094 has been voided because violation was given verbally. A written violation is being issued to the company today. |
0943989366 | 2012-10-18 | Drill / Deepen / Reopen | No Violations | Follow up to violation #479784943. The area has been reseeded and mulched. A trench has been dug across the entrance to the site in order to divert water run-off away from the barn. |
1090736016 | 2012-06-11 | Preliminary Restoration | No Violations | The area was partially graded and seeded and mulched. Area still needs to be fully graded and erosion must be under control. I met with Jon Kent of Mountaineer Energy and we discussed completing the restoration. We also spoke about the erosion issues the landowner is having with her barn. |
1317648890 | 2011-10-03 | Drill / Deepen / Reopen | No Violations | Drilling status check. Pit is lined and looks large enough to handle Injun water. Drilling at approximately 360. |
1319212198 | 2011-10-21 | Completion Testing | No Violations | Witnessed frac job on the Sheets 168. 2500 PSI-breakdown, ~12.5 Bbl/min at ~1000 PSI, 200 sacks of 20/40 sand used with 5999 total barrels of water. Initial shut in pressure (ISIP)-760, and after 5 minutes pressure was 720 PSI. |
1328637992 | 2012-02-07 | Preliminary Restoration | No Violations | The pit is being drained and a dozer is on site. |
1330004333 | 2012-02-23 | Preliminary Restoration | No Violations | The pit has been completely filled in. |
141148562 | 2012-1-23 0:00: | AD | No Violations | |
1689560625 | 2012-05-21 | Administrative Inspection | No Violations | Met with Tom Stone of Mountaineer State Operations to discuss erosion issues at well and remediation. |
1762674158 | 2015-03-20 | Drill / Deepen / Reopen | No Violations | Currently drilling around 3810 feet. Once TD is reached around 3990, hole will be logged and production casing will be set tonight or early tomorrow. |
1763720610 | 2012-10-31 | Preliminary Restoration | No Violations | Follow up to inspection -695586936. The vegetative cover is returning. The erosion control methods that have been emplaced appears to be working. The drain pipe has been replaced. The land owner is having a new garage installed and those operations have used the lower portion of the lease road. The garage installation has disturbed the soil around the entrance to the lease road. |
1768690712 | 2015-03-19 | Drill / Deepen / Reopen | No Violations | Deepening well to a proposed TD of 3990 feet into the Ohio Shale. Drilled out Aluminum plug and now about 2310 feet. The company has installed an annular BOP on the production casing and was tested last night according to the company representative and the drilling contractor. |
1876468945 | 2012-02-24 | Annular Disposal | No Violations | Inspected well site with Josh Garland MRI and Gene Chini Oil and Gas Supervisor. Informed Tom Stone and John Kent of Mountaineer that they cannot haul water to the well site for annular disposal and that they must remove the portable tank and line that is connected to the annulus. |
2019271136 | 2015-04-08 | Drill / Deepen / Reopen | No Violations | The 4 1/2 production casing was perforated at 2733 and 75 sacks of Class A cement was squeezed through the perforations in an attempt to bring the cement top up to provide adequate coverage to produce the well. I did not witness most of the job. |
2033864094 | 2012-04-27 | Preliminary Restoration | Violations Noted | Area has not been graded and vegetative cover has not been established. Area shall be graded and vegetative cover shall be established in order to prevent erosion. |
2073076286 | 2012-02-02 | Preliminary Restoration | No Violations | The Frac Tank has been removed and the annular disposal is functioning normally. The pit level has been lowered and is no longer overflowing. Brine trucks will be hauling the pit water out today and tomorrow and the company should begging closing the pit early next week. |
2073621040 | 2012-06-25 | Preliminary Restoration | No Violations | The equipment has been removed and vegetation has returned. There are still areas of the site which need gradede. |
2113594048 | 2011-10-04 | Drill / Deepen / Reopen | No Violations | Surface casing cement job. 683.1 of new 9 5/8 casing cemented into 690 of 12.25 borehole with 290 sacks of class A cement containing 500 lb of gel, 75 lb of CaCl, 240 lb of LCM, and 2 quarts of polymer. Circulation established and good cement returns at surface. |
21257422 | 2012-2-6 0:00:0 | PW | No Violations | 0.30 |
316873816 | 2012-1-27 0:00: | PW | No Violations | 0.50 |
415065574 | 2012-5-24 0:00: | DD | No Violations | 0.50 |
479784943 | 2012-1-24 0:00: | PL | No Violations | 2.50 |
815310184 | 2012-2-13 0:00: | PL | No Violations | 0.50 |
893184956 | 2012-9-27 0:00: | AM | No Violations | 0.30 |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
0479784943 | US-OH-125232 | 2012-01-25 | Failure to close drilling pits within two months | |
0695586936 | US-OH-127866 | 2012-10-31 | Failure to restore within six months | |
2033864094 | US-OH-120685 | 2013-04-05 | Failure to restore within six months |
For data sources see[9]