34-153-23074

Well Details

Well ID: 34-153-23074
Loading map...
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2010-01-15
Unconventional:
Horizontal:
Producing: No
Violations: 0
Latitude: 41.0202367716
Longitude: -81.5224686668

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
-1008606382 2010-01-11 Turbo Excavating was on site to dig a test hole near the proposed well. Also present were Mike Weinsz, Matt Egnatovich and Charlie Keeny. Indications are that the are has been filled from an unknown source and the test is to determine the type of material and the depth to the water table. Both issues will determine if earthen pits will be allowed. The first test pit approximately 75' southeast of the stake encountered bricks, crushed drums, steel, rebar, metal banding and other materials that would make earthen pits difficult if not impossible to manage. The second test pit located approximately 50' north of the stake, encountered a thin layer of fill overlying sand. The decision was made to move the pits to the north side of the stake and to permit earthen pits for drilling. Ground water was not encountered in either test pit.
-1350901378 2010-01-15 Advent Drilling is moving on site and rigging up. Turbo Excavating is digging the drilling pits. Should be ready to spud the well later tonight. No violations at this time.
-1529249407 2010-03-05 The well has been completed and tank battery equipment has been delivered to the site.
-1673537400 2010-04-30 The well is being pumped up and is scheduled for turn on next week. The fencing and identification are in place.
-476059423 2010-01-25 Advent Drilling has moved all equipment except the rig, off site. The drilling pits are fenced, lined and in good condition with adequate freeboard.
-595753836 2010-01-20 Advent is drilling ahead. The pits are fenced, lined and in good condition.
-804417792 2010-02-18 The drilling pits are solidified and closed. The well has been fraced and is waiting for a jump jack and the tank battery. No violations at this time.
1178143158 2010-04-02 The tank battery is under construction and the site has been rough graded. Turn on should be in the near future. No violations at this time.
1516501707 2011-06-22 The affected areas have been graded, seeded and are growing. The containment dike, security fence and well identification are in place and the well is in production. Preliminary restoration is approved.
1941717701 2010-05-24 The well is now in production. The required security fencing is in place and the identification is posted. Preliminary restoration is due later this summer.
571776645 2010-01-22 Advent Drilling has rigged down and is moving equipment off the location. The drilling pits are lined and in good condition. The fence will be installed on the south side of the pits after the rig has moved off. No violations at this time.