Well ID: 34-153-23074 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.02,"lon":-81.52,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: <County> | |
Municipality: | |
Operator Name: SOUND ENERGY CO INC | |
Well Pad ID: | |
Farm/Lease Name: GOSPEL TABERNACLE | |
License Status: Producing | |
License Date: 2009-03-11 | |
Spud Date: 2010-01-15 | |
Spud Drilling Contractor: ADVENT DRLG | |
Final Drill Date: 2010-01-21 | |
Well Total Depth: 4186.00 ft | |
Configuration: Directional | |
Latitude: 41.020000 | |
Longitude: -81.520000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2009-03-11 | Proposed Formations:CLINTON, Issued Date:3/11/2009, Expired Date:3/11/2010 6:00:00 AM, Drilling unit acres:20.97, Proposed Well Type:OG, Proposed Well Class:POOL |
Correction to Well | 2009-06-05 | UNIT SIZE INCREASED TO 21.49 ACRES. |
Reached Total Depth | 2010-01-21 | |
Construction Permit Expires | 2010-03-11 | |
Completion Report Received | 2010-03-12 | |
Correction to Well | 2010-04-02 | CORRECTION TO TARGET INFORMATION: 706'SL & 7195'WL OF TRACT 11/ X= 2,269,093/Y= 494,789. UNIT SIZE CORRECTED TO 21.49 ACRES. (AS DRILLED SURVEY). |
Change of Owner | 2015-05-12 | Operator changed from 7626, M & M ROYALTY LTD to 4327, SOUND ENERGY CO INC |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2010-06-17 | 3973 | 4040 | 107 |
3973 | 4040 | 107 | |
3973 | 4040 | 107 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 1500 Bbl | 60000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2010 | M & M ROYALTY LTD | 5624.00 | 1428.00 | 365 |
2011 | M & M ROYALTY LTD | 16112.00 | 1407.00 | 365 |
2012 | M & M ROYALTY LTD | 8723.00 | 876.00 | 366 |
2013 | M & M ROYALTY LTD | 5977.00 | 626.00 | 365 |
2014 | M & M ROYALTY LTD | 4292.00 | 618.00 | 365 |
2015 | SOUND ENERGY CO INC | 2738.00 | 305.00 | 305 |
2016 | SOUND ENERGY CO INC | 4102.00 | 351.00 | 365 |
2017 | SOUND ENERGY CO INC | 3258.00 | 347.00 | 365 |
2018 | SOUND ENERGY CO INC | 2890.00 | 308.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2010 | M & M ROYALTY LTD | Brine | 786 | 365 |
2011 | M & M ROYALTY LTD | Brine | 424 | 365 |
2012 | M & M ROYALTY LTD | Brine | 334 | 366 |
2013 | M & M ROYALTY LTD | Brine | 191 | 365 |
2014 | M & M ROYALTY LTD | Brine | 225 | 365 |
2015 | SOUND ENERGY CO INC | Brine | 229 | 305 |
2016 | SOUND ENERGY CO INC | Brine | 131 | 365 |
2017 | SOUND ENERGY CO INC | Brine | 211 | 365 |
2018 | SOUND ENERGY CO INC | Brine | 117 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1008606382 | 2010-1-11 0:00: | DD | No Violations | |
-1350901378 | 2010-1-15 0:00: | DD | No Violations | |
-1529249407 | 2010-3-5 0:00:0 | DD | No Violations | |
-1673537400 | 2010-4-30 0:00: | PW | No Violations | |
-476059423 | 2010-1-25 0:00: | DD | No Violations | |
-595753836 | 2010-1-20 0:00: | DD | No Violations | |
-804417792 | 2010-2-18 0:00: | DD | No Violations | |
0476059423 | 2010-01-25 | Drill / Deepen / Reopen | No Violations | Advent Drilling has moved all equipment except the rig, off site. The drilling pits are fenced, lined and in good condition with adequate freeboard. |
0571776645 | 2010-01-22 | Drill / Deepen / Reopen | No Violations | Advent Drilling has rigged down and is moving equipment off the location. The drilling pits are lined and in good condition. The fence will be installed on the south side of the pits after the rig has moved off. No violations at this time. |
0595753836 | 2010-01-20 | Drill / Deepen / Reopen | No Violations | Advent is drilling ahead. The pits are fenced, lined and in good condition. |
0804417792 | 2010-02-18 | Drill / Deepen / Reopen | No Violations | The drilling pits are solidified and closed. The well has been fraced and is waiting for a jump jack and the tank battery. No violations at this time. |
1008606382 | 2010-01-11 | Drill / Deepen / Reopen | No Violations | Turbo Excavating was on site to dig a test hole near the proposed well. Also present were Mike Weinsz, Matt Egnatovich and Charlie Keeny. Indications are that the are has been filled from an unknown source and the test is to determine the type of material and the depth to the water table. Both issues will determine if earthen pits will be allowed. The first test pit approximately 75 southeast of the stake encountered bricks, crushed drums, steel, rebar, metal banding and other materials that would make earthen pits difficult if not impossible to manage. The second test pit located approximately 50 north of the stake, encountered a thin layer of fill overlying sand. The decision was made to move the pits to the north side of the stake and to permit earthen pits for drilling. Ground water was not encountered in either test pit. |
1178143158 | 2010-04-02 | Drill / Deepen / Reopen | No Violations | The tank battery is under construction and the site has been rough graded. Turn on should be in the near future. No violations at this time. |
1350901378 | 2010-01-15 | Drill / Deepen / Reopen | No Violations | Advent Drilling is moving on site and rigging up. Turbo Excavating is digging the drilling pits. Should be ready to spud the well later tonight. No violations at this time. |
1516501707 | 2011-06-22 | Preliminary Restoration | No Violations | The affected areas have been graded, seeded and are growing. The containment dike, security fence and well identification are in place and the well is in production. Preliminary restoration is approved. |
1529249407 | 2010-03-05 | Drill / Deepen / Reopen | No Violations | The well has been completed and tank battery equipment has been delivered to the site. |
1673537400 | 2010-04-30 | Production Wells | No Violations | The well is being pumped up and is scheduled for turn on next week. The fencing and identification are in place. |
1941717701 | 2010-05-24 | Production Wells | No Violations | The well is now in production. The required security fencing is in place and the identification is posted. Preliminary restoration is due later this summer. |
571776645 | 2010-1-22 0:00: | DD | No Violations |