Well Details

Well ID: 34-111-24181
Loading map...
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2008-04-28
Unconventional:
Horizontal:
Producing: No
Violations: 3
Latitude: 39.8215712
Longitude: -81.156846225

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
1211460903 2008-05-08 THE DAY OF 05-08-08 IDROVE IN TO SEE THE STATUS ON THE SERVICE RIG.ROB ARMSTRONG WAS OPERATING THE RIG AND WAS SWABBING ON THE OPEN GROUND.THE FLUID WAS BLOWING OUT OF THE OILSAVER AND THE 2"VALVE ON THE 7"WELLHEAD DURING THE RETRACTION OF THE SAND LINE.HE THEN SHUT DOWN THE RIG AND CAME TO THE JEEP AND I ASK WHERE THE FLUID WAS GOING.ROB SAID INTO THE PIT.THEY LEFT AND WENT TO LUNCH AND I WENT TO LOOK AT THE INCIDENT.THEY WERE SWABBING ONTO THE OPEN GROUND.THE FLUID WENT DOWN THE HILL AND INTO A CREEK.PICTURS AND A WATER SAMPLE WERE TAKEN. 9-1-07
1245433005 2009-05-21 DAY OF INSPECTION WELL IS A RABBET WELL WITH 7CAS,4.5CAS,1.5TUBING.WELL IS SUPPLIED WITH A 100BBL TANK AND DIKE AND ID IS SUFFICIENT.SITE NEEDS TO BE SCRATCHED UP AND RESEEDED.CALLED BECKY SIMS.MATT LOGWELL WILL MOVE IN TAKE CARE OF SITE.
1251136328 2009-08-24 WELL IS A RABBIT WELL SUPPLIED WITH 7CAS,4.5CAS,1.5TUBING.100BBL TANK WITH ID AND DIKE IN PLACE.WELL IS COMPLIANT.
2016754140 2008-05-16 ON 05-16-2008 AT 8:30 AM I WAS STOPPING TO SEE IF THE DRILL PIT WAS CLOSED UP.I WENT DOWN TO WELL AND LOOKED AT PIT.THE BACKSIDE WALL GAVE AWAY.CAUSING THE CONTENTS TOSPILL DOWN INTO WOODS AND DOWN TO A CREEK.ALL OF THE FRAC TANKS WERE STILL PRESENT.SHALLOW SPRINGS WERE CHARGING UP THE SITUATION.I CALLED RAY BECK ON THE MATTER.HE DIRECTLY HAD SOME OF HIS EMPLOYEES SHOW UP AT ABOUT 9:30 AM.WE TOOK A DOZER AND CLOSED OFF THE OPEN PART OF THE PIT.WE THEN STARTED DIKING UP THE LOWER PART OF THE SPILL SO FLUID WOULD NOT GO DOWN INTO CREEK.WE TOOK OIL ABSORBENTS AND WENT TO DIKE UP THE LITTLE FEEDERS FROM THE SPRINGS CARRYING SHEEN FROM THE APPARENT SPILL.AT 11:00AM STARTED TO HOOK A PUMP UP TO THE FLOW LINE AND PUMP INTO THE 100BBL TANK AT TANK PAD.AT 1:30PM WE STARTED MOVING 2 300 BBL FRAC TANKS DOWN BY THE TANKPAD.AT 2:30 PM WATER TRUCKS WERE CALLED.AT 3:00 PM THE HAULERS CALLED BACK AND SAID THEY WOULD HAVE TO WAIT TILL SATURDAY MORNING.ALL DISPOSAL WELLS WERE FULL AND ONE WAS DOWN. 9-1-07
2016754140 2008-05-16 ON 05-16-2008 AT 8:30 AM I WAS STOPPING TO SEE IF THE DRILL PIT WAS CLOSED UP.I WENT DOWN TO WELL AND LOOKED AT PIT.THE BACKSIDE WALL GAVE AWAY.CAUSING THE CONTENTS TOSPILL DOWN INTO WOODS AND DOWN TO A CREEK.ALL OF THE FRAC TANKS WERE STILL PRESENT.SHALLOW SPRINGS WERE CHARGING UP THE SITUATION.I CALLED RAY BECK ON THE MATTER.HE DIRECTLY HAD SOME OF HIS EMPLOYEES SHOW UP AT ABOUT 9:30 AM.WE TOOK A DOZER AND CLOSED OFF THE OPEN PART OF THE PIT.WE THEN STARTED DIKING UP THE LOWER PART OF THE SPILL SO FLUID WOULD NOT GO DOWN INTO CREEK.WE TOOK OIL ABSORBENTS AND WENT TO DIKE UP THE LITTLE FEEDERS FROM THE SPRINGS CARRYING SHEEN FROM THE APPARENT SPILL.AT 11:00AM STARTED TO HOOK A PUMP UP TO THE FLOW LINE AND PUMP INTO THE 100BBL TANK AT TANK PAD.AT 1:30PM WE STARTED MOVING 2 300 BBL FRAC TANKS DOWN BY THE TANKPAD.AT 2:30 PM WATER TRUCKS WERE CALLED.AT 3:00 PM THE HAULERS CALLED BACK AND SAID THEY WOULD HAVE TO WAIT TILL SATURDAY MORNING.ALL DISPOSAL WELLS WERE FULL AND ONE WAS DOWN. NONE(B)