Well ID: 34-167-29577 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.434900484,"lon":-81.3120119685,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2005-04-04 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 1 | |
Latitude: 39.434900484 | |
Longitude: -81.3120119685 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
-104829324 | 2014-08-14 | Inspection revealed that injection pump was in operation during my inspection and it was noted that one company owned vacuum truck was unloading at facility during my inspection. | ||||
-1130149776 | 2008-12-10 | Inspection this day found unloading pad is complete - concrete with side curbs and looks very good. Gauges, ID's up at well, still only need to do something about the exposed plastic. | ||||
-1638843856 | 2007-11-28 | Performed annulus test this day. Pressured up with pump truck to 1775# between 4.5" casing and tubing - in 15 min. fell only to 1765#. Dropped 10# - passed. | ||||
-1667679741 | 2009-10-02 | Inspection this day found brine spill had been cleaned up - grass growing nicely downhill from the pump that ran over due to neighbor opening tank. Still small area about 2' x 6' that needs more lime, have seeded it but nothing growing yet. Now have cameras up to observe any intruders. | ||||
-1788497889 | 2009-12-01 | Inspection this day found pump running, pressures read 1600# on tubing, 0# on annulus. New employee Matt McElfresh on site, total water for 10/09 was 5765 bbl. | ||||
-180398040 | 2005-06-01 | Inspection this day found well producing, has not been reclaimed yet, pushed drill mud and cuttings over the hill and into swamp-like depression. Will have Joe look at it. | ||||
-188503794 | 2013-03-18 | Inspection revealed that well was not in operation during my inspection and according to well tender they were slow receiving water this week.
Note: Unloading pad clean and neat and it was noted that a small building has been placed by unloading to accommodate drivers that visit facility. |
||||
-1893577927 | 2013-04-30 | Inspection revealed that injection pump was not in operation during my inspection and it was noted that operator was weed eating and mowing around facility during my inspection.
Note: Facility in satisfactory condition this inspection. |
||||
-228424644 | 2013-09-30 | Went by site to check on service rig they were releasing packer and removing from well they will possibly want to start new packer and tubing in well tomorrow afternoon. | ||||
-31122514 | 2012-12-27 | Inspection revealed that injection pump was not in operation today and it was noted that two company owned vacuum tucks were unloading at facility during my inspection. | ||||
-353914256 | 2011-06-17 | |||||
-440540296 | 2008-11-03 | Inspection this day found well not running - has gauges now on well, working on sign - ID's for well, have not done anything about the un-loading pad or uncovered plastic liner in the pit. Operator at well says they are working on it. | ||||
-577179676 | 2012-06-13 | Inspected site at request of UIC Director he received complaint from adjacent landowner of mist from vacuum trucks was killing grass and trees around site, inspected site and found no evidence of such claim.
Note: Stone needs to be applied to exposed liner to help protect it from sunlight it will decay if left exposed and it starts to crack you will be required to replace liners in both storage areas. |
||||
-656706744 | 2009-08-31 | Inspection this day found Grant on location, no trucks dumping. He says all tanks full, pumping down but well down at this time of visit. | ||||
-939175556 | 2013-10-01 | On site to witness changing out of tubing and packer Baker Tool Rep's on site to start new A-3-Set Lock in well and once they reach 6850' they will attempt to set packer and once set they will J off of packer and circulate inhibitor and pressure test annulus@1660 psi and monitor for required time period. | ||||
-990843766 | 2012-12-20 | On site to witness Producers Services perform acid job on said well they pumped 500 gal of 15%acid into formation and they let it soak for 30 minutes and then we pumped brine at 1.3 bpm and monitored pressures with 1570 psi noted as top pressure recorded. | ||||
1057563087 | 2010-12-02 | Ran in remaining tubing, pressure testing it as it went in. Found no more leaks. Universal pressured up on well to 1730#, held 20 min. pressure falling to 1670#, then set packer, pressured up on tubing to 1685#, held 20 min., with pressure falling to 1609#. Passed integrity test, well put back into operation. | ||||
1107498199 | 2010-12-21 | Complaint from Mr. McIntire across the road that brine trucks leaving valves open as driving down the road - has pictures to give to AG's from last Thurs, he says. As I drove the roads to facilty, saw no sign of melted snow from brine, no damage at all. Talked to Jay at site and asked if they were leaving valves open - he did not believe so. Got a complaint last week from OEPA from Mr. McIntire that dumping brine on roads - called and found out they were having to transfer brine from big trucks to short trucks at end of road - possibly a small amount from that procedure but today saw no kill area or melted snow at end of road where occurred. Explained to Mr. McIntire that insugnificant amounts were not regulated, that with a permit companies were allowed to spread brine on roads. Told him I was concerned over 10 bbl being dumped but not a gallon at a time. He got very angry, continues to complain about the facility across the road from the house he rents. I saw no problem this day. | ||||
1123697678 | 2011-05-24 | Minor reclamation still needs completed on site due to recent tubing/packer work. The plastic fence is still up around where pit was located. The site needs final grading and additional seeding, especially where drill pit and other excavation occurred. There is a frac tank still on location, near the well, which should be removed. 11/21/11 - Frac tank has been removed and the site has been reclaimed from recent work-over on the well. All violations RESOLVED. | NONEC | |||
1130592022 | 2005-06-15 | Inspection this day found location had been reclaimed, has been seeded and mulched, still small amount of black plastic from the pit didn't get buried as did several of the plastic collar protectors from the casing that was run. Will ask them to remove. Well producing, current chart in meter, GPS'd locations at earlier date. | ||||
1184222353 | 2013-05-08 | Pressures equalizing shut down for repair, trying to get service rig and new tubing and packer ordered and as soon as they get equipment they will repair well and pressure test as required. | ||||
119009410 | 2009-02-12 | Inspection this day found Grant manning the facility - everything looks good, pumps running, 260,000 gal this month already, putting rock on the township and lease road. Quarterly inspection passes - no violations, pad clean. | ||||
1190896581 | 2007-09-28 | Inspection this day required to run packer into new disposal well. New Baker "J" or tension packer run into hole on new 2 3/8" tubing to 6926'. Baker man on location to supervise running of packer. Water well in use - landowner estimated it 40' deep, at GPS N39.43571, W81.31373. Also water well further away at GPS N39.43188, W81.31466, in use. Tanks will be set on top of hill, about 150' from well - further downhill from well about 200' is a low, usually swampy drainage area coming off the rolling hills. Will try and take a couple pictures. This day spent running tubing and packer to 6926', then loaded the tubing slowly with fresh water but still too much air in it at 6:30 PM to complete the pressure test this day. 9/28 - Returned to find air out of tubing, ran pressure up to 1775# with pump truck, after 15 min. was at 1650#. Passed. Next sheared pins off bottom of packer with 2700#, circulated to make sure packer open, then filled with packer inhibitor. Set packer at 6926', tested annulurs to 525# for 15 min. No drop in pressure. Completed volume/rate tests that showed at 1 bbl/min, needed 700#, 1/4 bbl/min, needed 50#. All were satisfied. | ||||
1213197337 | 2008-06-11 | Inspection this day found construction of building for pump has been started - still framing. 8 big tanks in place with dike lined with heavy plastic, then stone on top. Some lines in place, drain at pad - making progress, says will be another month. | ||||
1227190167 | 2008-11-19 | Inspection this day found attendent on hand, working on framing up the unloading pad to pour concrete. Pump house clean, pump not running. Have plans to put felt over the exposed plastic around edges of dike to prevent UV damage. All looked good. Id's up at well, new gauges. Volume is being measured in gallons and will be zero'd each month. | ||||
1231355990 | 2009-01-06 | Went by well as right across the road on oil spill clean-up. All looks in order, no trucks unloading, operator on site for incoming water. Unloading pad looks great, very clean. | ||||
1284143445 | 2010-05-24 | Inspection this day found Bob Handshumaker and helper performing maintanence on the pumps, other equipment. Pump not running, no problems, good ID's. | ||||
1290430992 | 2010-01-19 | Ben Smeltzer called to say integrity has failed - they have shut down well and bled off pressure. Will pull tubing, packer Tues with Baker man, plan on rebuilding packer, then running back in 1st week in Dec. Notified Columbus. | ||||
1322058841 | 2011-11-21 | Inspection this day found well equipped with a pumping unit and in production. Identification sign at well damaged by the cows. Owner said they will install new ones today. Tank and facility appear in good condition. Pooled water in some areas due to heavy rain. The frac tank that was between the well and the building has finally been removed. Violations are all RESOLVED. | ||||
1343596591 | 2012-07-27 | Inspection revealed that injection pump was in operation during my inspection.
Note: Owner has applied adhesive to exposed portion of liner and has applied stone to it too help prevent decay due to exposure to sunlight. |
||||
1350339571 | 2012-10-15 | Inspection revealed that injection pump was not in operation during my inspection, it was noted that annulus of tubing was at zero pressure and I suggested to operator to have positive pressure applied to annulus ASAP.
|
||||
1354236163 | 2012-11-28 | Inspection revealed that injection pump was not in operation during my inspection and it was noted that two Select Energy vacuum trucks were on unloading pad during my inspection. | ||||
1355345832 | 2012-12-12 | Inspection revealed that injection pump was in operation and two company owned vacuum trucks were unloading at facility during my inspection.
Note: Pump house interior was clean and neat and there was no fresh water built up in dike area. |
||||
1358376334 | 2013-01-16 | Inspection revealed that injection pump was in operation during my inspection and it as noted that one Green Hunter vacuum truck was unloading at facility this inspection.
Note: Fresh water build up in dike area told well operator to have excess water removed and properly disposed of. |
||||
1381103088 | 2013-10-03 | On site to witness Baker A-3 set lock run into well and pressure test annulus of tubing Producers Services pumped 72 bbl of fresh water fluid with 10 gal of inhibitor and they pressured tested annulus @ 1980 psi with no decline in pressure and we also tested tubing @ 2000 psi which that is what it took to release plug on bottom of packer.
Note: Setting depth of new packer is 6891' to center of element and overall length of string is 6894.' |
||||
1383779959 | 2013-11-06 | Inspection revealed that injection pump was in operation and it was noted that one Green Hunter vacuum truck was unloading at facility during my inspection. | ||||
1386109642 | 2013-12-02 | Inspection revealed that injection pump was in operation during my inspection. | ||||
1388534086 | 2013-12-30 | Inspection revealed that injection pump was in operation during my inspection and it was noted that two Green Hunter vacuum trucks were unloading at facility during my inspection. | ||||
1397244766 | 2014-04-10 | Inspection revealed that injection pump was in operation during my inspection and it was noted that two company owned vacuum trucks were unloading at facility during my inspection.
Note: Owner is planning on changing out injection pump in the near future. |
||||
1417610449 | 2010-11-19 | Ben Smeltzer called to say integrity of disposal well had failed. They are shut down - have bled off pressure and will pull tubing and packer on 11/23/2010 with Baker man present. Packer will be rebuilt and run back in week of Dec. 1st. Notified Columbus. | ||||
1424356735 | 2010-11-29 | Ben Smeltzer called to say they had lost integrity of well on 11/19/10 - are bleeding well down. Tubing and packer pulled with Baker man present on 11/22/10 - packer taken to be rebuilt. This day found crew and rig running rebuilt packer, tubing back in hole. Witnessed packer going in hole. Will pressure test tomorrow. | ||||
1571062469 | 2010-12-01 | Continuing to pull tubing, 10 joints at a time and testing pressure to try and find leak. None found up to now. | ||||
1583392514 | 2008-08-18 | First inspection since approval to use. Well down when arrived - tubing pressure at 300#, annulus 0, operator arrived and started pump and was taking water at 585# before I left. Location still needs little cleaning up, good ID's on tank, should also have some at well. | ||||
165215397 | 2008-08-13 | Testing pipeline this day - is steel line that has already been buried, pressured up to 2000# with pump - fell 80# over 15 minute period to 1920#. No way to retest tubing/casing pressures unless packer is undone. Ben will call Tom and discuss previous test - failed only due to leaks in fittings of pump truck doing test. Ben called later - says Tom has given permission to use. | ||||
1676913103 | 2013-08-21 | Well is down waiting on service rig to replace tubing and packer. | ||||
17729066 | 2012-05-22 | Inspection revealed that injection pump was not in operation during my inspection but well tender was expecting brine trucks to show up so he could start pump.
Note:Stone needs to be applied to exposed pit liner in tank area's to help prevent decay from sunlight liner is showing signs of fatique due to exposure to the elements. |
||||
2109535211 | 2014-06-16 | Inspection revealed that injection pump was not in operation during my inspection but it was noted that three company owned vacuum trucks were unloading at facility during my inspection. | ||||
227923874 | 2010-11-30 | Service rig runs in remaining tubing in hole to depth of 6829'. Baker Hughes man on location to set Baker A-1 Lok-Set Retrievable packer and Universal used to pressure up well. Pump truck took pressure up to 1690, tested their lines, then opened valves to pressure up on well. Immediately fell to 200#, indicating a leak in tubing. Baker set packer, connected to 4.5" casing to see if tubing would flow and it did, also confirming hole in tubing. While pump truck on location, pulled tubing 10 joints at a time, testing pressure after each 10 joints to try and isolate joint with hole. Pulled 50 joints this day without finding problem. Will continue tomorrow. | ||||
265561816 | 2009-09-11 | OEPA Deavers called to say received a call on 9/10/09 about truck "dumping brine over the hill off the side of road, oil on the ground, and man's dog sick after drinking the dumped water in the creek". Found area about 3' x 10' showing brine kill, but did not find it to go all the way downhill into the creek, green grass/weeds between the 2 areas. George McIntyre, the complaints came down the road to show me - I agree a small amount of brine was released from truck, small oil spot in middle of road (where truck sat) about 3" x 6" and could be transmission fluid/oil from truck. Says brine was dumped 9/2/09 from an orange and white truck and talked with Grant, monitor at well, to try and determine which truck did it and why. Grant said he would review records and figure out which driver it was and talk to him. Virco has had trouble with this man for many months - has already gone to court once with Virco winning, man claims to be disabled veteran - said his dog still sick from drinking brine - told him to take him to the veterinarian. | ||||
6054241 | 2011-05-24 | Inspection this day found well in production. 1400# on tubing, 0# on annulus. Location still needs reclamation work - plastic fence still up where the work-over pit was and ground below the facility needs more grass seed - only growing sporadically. Good ID's, unloading pad looks clean and inside dike area mostly dry. | ||||
633232447 | 2010-02-24 | Inspection this day found pump running attendent at well. Tubing pressure 1450#, 0 on annulus. | ||||
711433922 | 2012-02-10 | My inspection this day due to quarterly requirements. The pump was running and pressures were 1500# on the tubing, 0# on annulus. Two trucks with brine numbers were unloading while I was there. While inspecting the steel flow line from the pump building to the well, found a badly rusted and rotted steel connection - advised them to get it changed out in next few days. Unloading pad clean, good identification, pumphouse clean also. The weather has washed out some of the black plastic used to line the pit when drilled - told them they needed to remove all that plastic - they were instructed to bury it deeply when reclamation was completed. 2/14/12 - Upon inspection, I found the 2" steel line in rusted condition has been replaced with new line. Operator will take propane torch and burn up the plastic found on the ground. | ||||
742017382 | 2013-06-24 | Inspection revealed that well is still waiting on service rig to remove tubing and packer from well, they suspect that packer or tubing has lost integrity. | ||||
822283669 | 2009-09-14 | |||||
859432696 | 2010-08-23 | Inspection this day found new man at facility - Jay Satterfield. Pump was running, no trucks in, tubing pressure was 1650#, annulus was 30#. Good ID's, starting to fade, all looked good. Flowmeter reading in gal. | ||||
864095042 | 2009-05-27 | Inspection this day found well in operation, all looks good. | ||||
913013303 | 2011-02-24 | Inspection this day found everything in order. Pump running, pumping down tanks with pressure at 1600#, 0# on annulus. Pointed out getting close to limits and operator said office has sent samples in to get top pressure increased. Fresh water in dike area due to recent rains - should be out in next day or 2. |