34-055-21841

Well Details

Well ID: 34-055-21841
Loading map...
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2006-10-17
Unconventional:
Horizontal:
Producing: No
Violations: 0
Latitude: 41.5412933769
Longitude: -81.3883337882

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
-1454690552 2006-10-24 Two joints remaining to be drilled. Safety fence will need to be moved in closer to the pits once rig is moved off site. Will be moving off site Monday.
-48613039 2006-10-16 Drilling is idle, operator is currently working on the rig. Pit construction started, sub-soil is clay. No ground water was encountered during the construction of the pits. Safety fence needs to be installed.
1118486086 2007-10-31 Well head has not been fenced. Well is in production. Area where the pits were is barren. Site needs limed, fertilized and re-seeded. Lease road to the well head is not stable. Either needs restored or reclaimed. Lease road is not constructed out of durable material. Silt fence is still up and controlling drainage.
1160588621 2006-10-10 Rig has been moved on site. Drilling is idle till Friday or Saturday, rig is shut down for repairs. Silt fence has been installed to the north and west of rig. Pits have not been constructed. Permit was posted at the entrance.
1161870979 2006-10-16 Surface cement set. Safety fence is 50% up, will finish install once blow line is in. 10BBL return on surface cement. Casing set a 265. 8 5/8 pipe new. Top of the Berea was at 57' bottom 97'.
1162821812 2006-11-06 Drill rig has moved off site. Pits have safety fence around them. Pit liners are up. Lease road is in poor condition.
1262030421 2009-12-22 On site to meet with representative from Howard Hanna, FHA loan was denied due to the spacing of the tank battery from the garage with an apartment in it on the property. Measured distance from production tank to the building, distance was 70'. Separator was closer. Walked site with FHA requirements for spacing are different than ORC, I informed that I can only enforce ORC laws. There is a spacing issue and the company will be contacted. Called Don Craiger from David Hill, regarding the spacing issues. Don will meet me on site on December 28,2009.
1372701613 2013-07-01 My inspection found the well to be equipped with a plunger lift unit. The annulus valve is open. The casing has three house lines plumbed into it. The well and the tank battery are in good repair and are surrounded by a wooden fence. The tank battery consists of a 100 BBL production tank, a 100 BBL brine tank, and a mechanical separator. The proper identification is located on the tank battery. The lease road is in stable condition.
1734889611 2009-12-28 On site with Don Craiger from Hill David R INC. Measured distance from garage with apartment in it to the production tank, distance was 67'. Took measurements with Don to work out how to move the battery to meet spacing. Tank battery was to be built into the side of the slope south side of the lease road. Tank battery was built at the end of the lease road. Operator has two 100BBL tanks and a mechanical separator in the battery. Tank will need to be moved west. Battery is in good repair. Dike is sufficient to prevent escape of fluids. Spoke to Dave Hill changes will be made immediately.
295287423 2006-10-04 Lease road under construction. Operator on site was informed that permit must be posted before site construction is started.