If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-055-21841 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.54,"lon":-81.38,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Geauga | |
Municipality: Chester Township | |
Operator Name: DAVID R HILL INC | |
Well Pad ID: | |
Farm/Lease Name: MAYNE-OSBOURN UNIT | |
License Status: Producing | |
License Date: 2006-09-29 | |
Spud Date: 2006-10-17 | |
Spud Drilling Contractor: KILBARGER DRLG | |
Final Drill Date: 2006-10-26 | |
Well Total Depth: 3777.00 ft | |
Configuration: Vertical | |
Latitude: 41.540000 | |
Longitude: -81.380000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2005-07-29 | Proposed Formations:SHALE-ORISKANY-CLINTON, Issued Date:7/29/2005, Expired Date:7/29/2006 6:00:00 AM, Drilling unit acres:21.085, Proposed Well Type:OG, Proposed Well Class:POOL |
APP | 2006-09-29 | Proposed Formations:OHIO SHALE-ORISKANY-CLINTON, Issued Date:9/29/2006, Expired Date:9/29/2007 6:00:00 AM, Drilling unit acres:21.085, Proposed Well Type:OG, Proposed Well Class:POOL |
Completed | 2006-10-26 | RBDMS Rec |
Reached Total Depth | 2006-10-26 | RBDMS Rec |
Change of Owner | 2007-03-27 | Operator changed from 432, BAKERWELL INC to 490, HILL DAVID R INC |
Completion Report Received | 2007-04-23 | RBDMS Rec |
Construction Permit Expires | 2007-09-29 | RBDMS Rec |
Record Last Modified | 2017-02-15 | RBDMS Rec |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2007-07-29 | 3558 | 3590 | 41 |
3558 | 3590 | 41 | |
3558 | 3590 | 41 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 73000 Gal | 40000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2007 | DAVID R HILL INC | 3342.00 | 0.00 | 334 |
2008 | DAVID R HILL INC | 10499.00 | 174.00 | 365 |
2009 | DAVID R HILL INC | 5447.00 | 64.00 | 365 |
2010 | DAVID R HILL INC | 3314.00 | 64.00 | 365 |
2011 | DAVID R HILL INC | 1873.00 | 0.00 | 365 |
2012 | DAVID R HILL INC | 856.00 | 39.00 | 366 |
2013 | DAVID R HILL INC | 1024.00 | 0.00 | 365 |
2014 | DAVID R HILL INC | 312.00 | 0.00 | 365 |
2015 | DAVID R HILL INC | 254.00 | 41.00 | 365 |
2016 | DAVID R HILL INC | 728.00 | 0.00 | 365 |
2017 | DAVID R HILL INC | 1617.00 | 81.00 | 365 |
2018 | DAVID R HILL INC | 1457.00 | 58.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2007 | DAVID R HILL INC | Brine | 736 | 334 |
2008 | DAVID R HILL INC | Brine | 490 | 365 |
2009 | DAVID R HILL INC | Brine | 328 | 365 |
2010 | DAVID R HILL INC | Brine | 189 | 365 |
2011 | DAVID R HILL INC | Brine | 136 | 365 |
2012 | DAVID R HILL INC | Brine | 2 | 366 |
2013 | DAVID R HILL INC | Brine | 81 | 365 |
2014 | DAVID R HILL INC | Brine | 0 | 365 |
2015 | DAVID R HILL INC | Brine | 69 | 365 |
2016 | DAVID R HILL INC | Brine | 84 | 365 |
2017 | DAVID R HILL INC | Brine | 235 | 365 |
2018 | DAVID R HILL INC | Brine | 260 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1454690552 | 2006-10-24 0:00 | DD | No Violations | |
-48613039 | 2006-10-16 0:00 | DD | No Violations | |
0048613039 | 2006-10-16 | Drill / Deepen / Reopen | No Violations | Drilling is idle, operator is currently working on the rig. Pit construction started, sub-soil is clay. No ground water was encountered during the construction of the pits. Safety fence needs to be installed. |
0295287423 | 2006-10-04 | Drill / Deepen / Reopen | No Violations | Lease road under construction. Operator on site was informed that permit must be posted before site construction is started. |
1118486086 | 2007-10-31 | Preliminary Restoration | No Violations | Well head has not been fenced. Well is in production. Area where the pits were is barren. Site needs limed, fertilized and re-seeded. Lease road to the well head is not stable. Either needs restored or reclaimed. Lease road is not constructed out of durable material. Silt fence is still up and controlling drainage. |
1160588621 | 2006-10-10 | Drill / Deepen / Reopen | No Violations | Rig has been moved on site. Drilling is idle till Friday or Saturday, rig is shut down for repairs. Silt fence has been installed to the north and west of rig. Pits have not been constructed. Permit was posted at the entrance. |
1161870979 | 2006-10-16 | Drill / Deepen / Reopen | No Violations | Surface cement set. Safety fence is 50% up, will finish install once blow line is in. 10BBL return on surface cement. Casing set a 265. 8 5/8 pipe new. Top of the Berea was at 57 bottom 97. |
1162821812 | 2006-11-06 | Drill / Deepen / Reopen | No Violations | Drill rig has moved off site. Pits have safety fence around them. Pit liners are up. Lease road is in poor condition. |
1262030421 | 2009-12-22 | Production Wells | No Violations | On site to meet with representative from Howard Hanna, FHA loan was denied due to the spacing of the tank battery from the garage with an apartment in it on the property. Measured distance from production tank to the building, distance was 70. Separator was closer. Walked site with FHA requirements for spacing are different than ORC, I informed that I can only enforce ORC laws. There is a spacing issue and the company will be contacted. Called Don Craiger from David Hill, regarding the spacing issues. Don will meet me on site on December 28,2009. |
1372701613 | 2013-07-01 | UrbanProduction Wells | No Violations | My inspection found the well to be equipped with a plunger lift unit. The annulus valve is open. The casing has three house lines plumbed into it. The well and the tank battery are in good repair and are surrounded by a wooden fence. The tank battery consists of a 100 BBL production tank, a 100 BBL brine tank, and a mechanical separator. The proper identification is located on the tank battery. The lease road is in stable condition. |
1454690552 | 2006-10-24 | Drill / Deepen / Reopen | No Violations | Two joints remaining to be drilled. Safety fence will need to be moved in closer to the pits once rig is moved off site. Will be moving off site Monday. |
1632474482 | 2017-02-14 | UrbanProduction Wells | No Violations | At the time of this inspection, the well was equipped with a plunger lift assembly and the valves on the wellhead were open. The well was fenced. The last reported production for this well was in 2015. The tank battery consisted of one 100 BBL production tank, one 100 BBL brine tank, a mechanical separator and a sales line. The valves on the separator were open and the chart showed production. The production tank vent stack was plumbed into a 55 gallon charcoal filter and then topped with a spark arrestor. The tank valves were equipped with flat plugs. The tank battery was diked and fenced but the fence had moved due to frost heave and no longer lined up with the man door opening, leaving the door unable to be closed and locked. The proper, legible signage was located at the tank battery location. The lease access was stable. I contacted John Suhar (740) 680-1483 from the David R. Hill Inc. and discussed the fence repair. |
1734889611 | 2009-12-28 | Production Wells | No Violations | On site with Don Craiger from Hill David R INC. Measured distance from garage with apartment in it to the production tank, distance was 67. Took measurements with Don to work out how to move the battery to meet spacing. Tank battery was to be built into the side of the slope south side of the lease road. Tank battery was built at the end of the lease road. Operator has two 100BBL tanks and a mechanical separator in the battery. Tank will need to be moved west. Battery is in good repair. Dike is sufficient to prevent escape of fluids. Spoke to Dave Hill changes will be made immediately. |
1902620939 | 2017-02-23 | UrbanProduction Wells | No Violations | At the time of this reinspection, the well was equipped with a plunger lift assembly and the valves on the wellhead were open. The well was fenced. The last reported production for this well was in 2015. The tank battery consisted of one 100 BBL production tank, one 100 BBL brine tank, a mechanical separator and a sales line. The valves on the separator were open and the chart showed production. The production tank vent stack was plumbed into a 55 gallon charcoal filter and then topped with a spark arrestor. The tank valves were equipped with flat plugs. Proper, legible signage was located at the tank battery. The previous inspection report dated 2/14/2017 discussed the tank battery fence needing repair due to frost heave. During this inspection, the fence had been repaired and the man door realigned and locked. The lease access was stable. No violations were observed. |
295287423 | 2006-10-4 0:00: | DD | No Violations |
For data sources see[9]