If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-153-22988 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.2859482793,"lon":-81.4280536679,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2009-07-20 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 0 | |
Latitude: 41.2859482793 | |
Longitude: -81.4280536679 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
-1415966745 | 2009-08-06 | The pits have been solidified and graded over. The well is scheduled to be fraced next week. | ||||
-1868533033 | 2009-09-03 | No change in the status of this well. The site has been rought graded, the pits have been solidified and closed and the tank battery is under construction. The well has not been fraced. | ||||
106817803 | 2010-07-23 | Preliminary restoration is approved. | ||||
1249938029 | 2009-07-31 | Status check inspection found the pits fenced, lined and in good condition with sufficient freeboard. Solidification is scheduled for 08/04. | ||||
1250086058 | 2009-08-04 | Transcontinental was on site to solidify the drilling pits. The air can tractor trailer dust application method caused a large portion of the affected area to be covered. I talked to Cal Marks about changing the application method to control the dust. A dump truck will be used when the pits at the Ferrara well are solidified. | ||||
1275665626 | 2010-06-02 | The well is in production and the tank battery and wellhead are fenced. Preliminary restoration is due now. The site still needs a considerable amout of grading before seed and mulch. If the work is not completed by the end of June, a NOV will be issued. | ||||
2076416839 | 2009-07-20 | Capstar Drilling Rig 4 is moving on location and should spud later tonight. The permit and ID sign are posted as required. No violations at this time. | ||||
560190326 | 2009-07-23 | Capstar is drilling ahead. The pits are fenced, lined and in good condition. No violations at this time. |