Well ID: 34-019-22332 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.7162403768,"lon":-80.9589276554,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2013-03-09 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 0 | |
Latitude: 40.7162403768 | |
Longitude: -80.9589276554 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
-46257149 | 2013-03-28 | |||||
-528006226 | 2013-03-18 | Met with drilling supertintendent John Snook. Rig was tripping at 6900'. | ||||
1363108264 | 2013-03-05 | I went to the site to check on the status of the rig move. The derrick was still down, and equipment was being moved from drilling the 1H to the 3H. | ||||
1363289973 | 2013-03-13 | I was onsite to check the status of drilling for the intermediate casing. They were currently 1350' of their target depth of 1500'. They estimate that they will be cementing casing in 9 hours time. | ||||
1364922186 | 2013-03-26 | I went to the site and met with drilling consultant Rodney Bean, and reviewed the drilling data, and the planned production casing installation data. The well was drilled to a total measured depth of 13,705' this morning. | ||||
1541479049 | 2013-03-11 | |||||
206835090 | 2013-03-14 | I was onsite to witness the cementing of the 9 5/8" intermediate casing that was set to 1491'. There were delays in the job as the wrong shoe joint parts were ordered and they needed new ones to be ordered to run the casing. There was also a delay as there was a miscommunication between Halliburton and Chesapeake as to when the required callout time was. In total 16 barrels of cement came back to surface with full returns through the job. Cement was scaled at 14.7ppg at end of the job, target was 15.6. | ||||
31179649 | 2013-03-13 | I met on site with drilling consultant Rodney Bean. Rig was drilling intermediate hole at 1000'. Anticipated finishing intermediate hole in early hours of morning 03/14/2013. |