If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-019-22332 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.71,"lon":-80.95,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Carroll | |
Municipality: East Township | |
Operator Name: EAP OHIO LLC | |
Well Pad ID: US-OH-000474 | |
Farm/Lease Name: CONIGLIO 7-14-4 | |
License Status: Producing | |
License Date: 2013-02-22 | |
Spud Date: 2013-03-09 | |
Spud Drilling Contractor: NOMAC DRILLING CORP | |
Final Drill Date: 2013-03-26 | |
Well Total Depth: 13705.00 ft | |
Configuration: Horizontal | |
Latitude: 40.710000 | |
Longitude: -80.950000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-02-22 | Proposed Formations:POINT PLEASANT, Issued Date:2/22/2013, Expired Date:2/22/2015 12:00:00 PM, Drilling unit acres:335.93, Proposed Well Type:OG, Proposed Well Class:EOUT |
Reached Total Depth | 2013-03-26 | |
Correction to Well | 2013-06-28 | CORRECTION TO TARGET INFORMATION (FOOTAGE & X,Y COORDINATES) FROM AS DRILLED SURVEY PLAT. UNIT SIZE CHANGED TO 333.91 ACRES. |
Completion Report Received | 2013-11-04 | |
Construction Permit Expires | 2015-02-22 | |
Record Last Modified | 2017-09-11 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2013-11-04 | 8182 | 13509 | 684 |
8182 | 13509 | 684 | |
8182 | 13509 | 684 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 04/19/2013 | 04/24/2013 | 7715 | 4,981,490.0 | 371637 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | WCS-631LC | WEATHERFORD | Clay Stabilizer | No Hazardous Components | NONE | 0 | 0 | 0 |
WFR-61LA | WEATHERFORD | Friction Reducer | Sodium Chloride | 007647-14-5 | 10 | 0.00635 | 0 | |
Petroleum Distillate Hydrotreated Light | 064742-47-8 | 40 | 0.02538 | 0 | ||||
Quaternary Ammonium Chloride (Ammonium Chloride) | 012125-02-9 | 7 | 0.00444 | 0 | ||||
Alcohols ethoxylated C12-16 | 068551-12-2 | 7 | 0.00444 | 0 | ||||
WAI-251LC, WBK-134, WCS-631LC,
WFR-61LA, WGA-15L, WIC-641L, WXL-106L |
WEATHERFORD | Breaker, Clay Stabilizer, Corrosion Inhibitor, Cross Linker, Friction Reducer, Gelling Agent, Iron Control Agent | Guar Gum | 009000-30-0 | 0 | 0.07788 | 0 | |
Proprietary Non-Hazardous Salt | TRADE SECRET | 0 | 0.09911 | 0 | ||||
Proprietary Ethoxylated Nonylphenol | TRADE SECRET | 0 | 0.0007 | 0 | ||||
Alcohols ethoxylated C12-16 | 068551-12-2 | 0 | 0.07788 | 0 | ||||
Proprietary Breaker Additive (WBK-134) | TRADE SECRET | 0 | 0.00085 | 0 | ||||
Water | 007732-18-5 | 0 | 0.1309 | 0 | ||||
Sorbitan | 008007-43-0 | 0 | 0.07788 | 0 | ||||
Proprietary Alcohol | TRADE SECRET | 0 | 0.0007 | 0 | ||||
Proprietary Friction Reducer Additive (WFR-61LA) | TRADE SECRET | 0 | 0.05415 | 0 | ||||
WBK-134 | WEATHERFORD | Breaker | Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 10 | 0.00021 | 0 | |
Ammonium Persulfate | 007727-54-0 | 80 | 0.00169 | 0 | ||||
WAI-251LC | WEATHERFORD | Corrosion Inhibitor | Cinnamaldehyde | 000104-55-2 | 10 | 0.00021 | 0 | |
Isopropanol (Isopropyl Alcohol, Propan-2-ol) | 000067-63-0 | 7 | 0.00015 | 0 | ||||
Tar bases, quinoline derivs, benzyl chloride-qauternized | 072480-70-7 | 13 | 0.00027 | 0 | ||||
Branched-Ethoxylated Nonyl Phenol
(Branched-Nonyl Phenol Ethoxylate) |
068412-54-4 | 10 | 0.00021 | 0 | ||||
Dimethyl Formamide | 000068-12-2 | 40 | 0.00084 | 0 | ||||
2-Butoxyethanol (Ethylene Glycol Monobutyl Ether) | 000111-76-2 | 7 | 0.00015 | 0 | ||||
Ethylene Glycol | 000107-21-1 | 60 | 0.00125 | 0 | ||||
Triethyl Phosphate | 000078-40-0 | 7 | 0.00015 | 0 | ||||
EC6486A | NALCO | Scale Inhibitor | Ethylene Glycol | 000107-21-1 | 30 | 0.00471 | 0 | |
WGA-15L | WEATHERFORD | Gelling Agent | Petroleum Distillate Hydrotreated Light | 064742-47-8 | 70 | 0.07879 | 0 | |
100 Mesh Sand | WEATHERFORD | Proppant - Natural | Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 100 | 1.25792 | 0 | |
Northern White Sand | WEATHERFORD | Proppant - Natural | Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 100 | 12.0212 | 0 | |
ACID, HYDROCHLORIC, 15 PCT | WEATHERFORD | Acid | Hydrochloric Acid | 007647-01-0 | 15 | 0.16768 | 0 | |
Water | 007732-18-5 | 85 | 0.95018 | 0 | ||||
WBK-133 OXIDIZER | WEATHERFORD | Breaker | Ammonium Persulfate | 007727-54-0 | 100 | 0.00094 | 0 | |
WXL-106L | WEATHERFORD | Cross Linker | Potassium Tetraborate | 001332-77-0 | 40 | 0.01228 | 0 | |
Potassium Hydroxide | 001310-58-3 | 13 | 0.00399 | 0 | ||||
WIC-641L | WEATHERFORD | Iron Control Agent | Citric Acid | 000077-92-9 | 70 | 0.00423 | 0 | |
EC6110A | NALCO | Anti-Bacterial Agent | Quaternary Ammonium Compounds | NA | 10 | 0.00271 | 0 | |
Glutaraldehyde | 000111-30-8 | 60 | 0.01628 | 0 | ||||
Ethanol | 000064-17-5 | 5 | 0.00136 | 0 | ||||
EC6110A, EC6486A | NALCO | Anti-Bacterial Agent, Scale Inhibitor | Proprietary Inorganic Phosphate | TRADE SECRET | 0 | 0.00181 | 0 | |
Diethylene Glycol | 000111-46-6 | 0 | 0.00018 | 0 | ||||
Water | 007732-18-5 | 0 | 0.03088 | 0 | ||||
Proprietary Organic Acid Derivatives | TRADE SECRET | 0 | 0.00543 | 0 | ||||
Fresh Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 85.2564 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2013-04-23 | H2O | 15 | 5704 Bbl | 341140 | Weatherford | STAGE 15
36 SHOTS |
0 | 0 | 0 | ||||
2013-04-20 | H2O | 15 | 6156 Bbl | 340721 | Weatherford | STAGE 2
36 SHOTS |
2013-04-22 | H2O | 15 | 5950 Bbl | 341220 | Weatherford | STAGE 7
36 SHOTS |
2013-04-24 | H2O | 15 | 5799 Bbl | 334900 | Weatherford | STAGE 19
36 SHOTS |
2013-04-23 | H2O | 15 | 5502 Bbl | 341240 | Weatherford | STAGE 14
36 SHOTS |
2013-05-22 | H2O | 15 | 7614 Bbl | 340821 | Weatherford | STAGE 5
36 SHOTS |
2013-04-19 | H2O | 15 | 6251 Bbl | 340740 | Weatherford | STAGE 1
36 SHOTS |
2013-04-24 | H2O | 15 | 5921 Bbl | 342020 | Weatherford | STAGE 18
36 SHOTS |
2013-04-22 | H2O | 15 | 5924 Bbl | 341560 | Weatherford | STAGE 9
36 SHOTS |
2013-04-23 | H2O | 15 | 6307 Bbl | 341581 | Weatherford | STAGE 12
36 SHOTS |
2013-04-21 | H2O | 15 | 6379 Bbl | 341420 | Weatherford | STAGE 4
36 SHOTS |
2013-04-22 | H2O | 15 | 6222 Bbl | 3417000 | Weatherford | STAGE 6
36 SHOTS |
2013-04-23 | H2O | 15 | 5504 Bbl | 341240 | Weatherford | STAGE 13
36 SHOTS |
2013-04-23 | H2O | 15 | 6578 Bbl | 340181 | Weatherford | STAGE 10
36 SHOTS |
2013-04-22 | H2O | 15 | 5959 Bbl | 340980 | Weatherford | STAGE 8
36 SHOTS |
2013-04-23 | H2O | 15 | 5383 Bbl | 341750 | Weatherford | STAGE 16
36 SHOTS |
2013-04-23 | H2O | 15 | 5981 Bbl | 341380 | Weatherford | STAGE 11
36 SHOTS |
2013-04-24 | H2O | 15 | 5970 Bbl | 341880 | Weatherford | STAGE 17
36 SHOTS |
2013-04-20 | H2O | 15 | 5956 Bbl | 342200 | Weatherford | STAGE 3
36 SHOTS |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | CHESAPEAKE EXPLORATION LLC | 254244 | 13639 | 160 |
2014 | CHESAPEAKE EXPLORATION LLC | 322006 | 12310 | 358 |
2015 | CHESAPEAKE EXPLORATION LLC | 227343 | 6811 | 362 |
2016 | CHESAPEAKE EXPLORATION LLC | 187303 | 4847 | 366 |
2017 | CHESAPEAKE EXPLORATION LLC | 161025 | 3418 | 365 |
2018 | CHESAPEAKE EXPLORATION LLC | 141397 | 2617 | 364 |
2019 | CHESAPEAKE EXPLORATION LLC | 31386 | 549 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | CHESAPEAKE EXPLORATION LLC | Brine | 15388 | 160 |
2014 | CHESAPEAKE EXPLORATION LLC | Brine | 3174 | 358 |
2015 | CHESAPEAKE EXPLORATION LLC | Brine | 2130 | 362 |
2016 | CHESAPEAKE EXPLORATION LLC | Brine | 842 | 366 |
2017 | CHESAPEAKE EXPLORATION LLC | Brine | 321 | 365 |
2018 | CHESAPEAKE EXPLORATION LLC | Brine | 278 | 364 |
2019 | CHESAPEAKE EXPLORATION LLC | Brine | 45 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-366967212 | 2015-12-7 0:00: | PL | No Violations | |
-46257149 | 2013-3-28 0:00: | DD | No Violations | |
-528006226 | 2013-3-18 0:00: | DD | No Violations | |
0031179649 | 2013-03-13 | Drill / Deepen / Reopen | No Violations | I met on site with drilling consultant Rodney Bean. Rig was drilling intermediate hole at 1000. Anticipated finishing intermediate hole in early hours of morning 03/14/2013. |
0046257149 | 2013-03-28 | Drill / Deepen / Reopen | No Violations
-based mud used to drill the hole and condition the hole, respectively, a lead cement followed by a tail cement were pumped. The lead cement was mudscaled at 14.4 pounds per gallon (ppg), and the density adjusted. Halliburton pumped 157 bbls of lead cement at 14.2 ppg. Halliburton pumped 269 bbls of tail cement at 15.6 ppg. The plug was dropped, and displaced with 304 bbls of water. The plug bumped the float collar at 04:31pm on 03/28/2013. Pressure held. The float held when the pressure was released. 4.0 bbls of water bled back. | |
0206835090 | 2013-03-14 | Drill / Deepen / Reopen | No Violations | I was onsite to witness the cementing of the 9 5/8 intermediate casing that was set to 1491. There were delays in the job as the wrong shoe joint parts were ordered and they needed new ones to be ordered to run the casing. There was also a delay as there was a miscommunication between Halliburton and Chesapeake as to when the required callout time was. In total 16 barrels of cement came back to surface with full returns through the job. Cement was scaled at 14.7ppg at end of the job, target was 15.6. |
0366967212 | 2015-12-07 | Preliminary Restoration | No Violations | I was on location to conduct a preliminary restoration inspection. The well is equipped with a plunger lift unit. Jersey barriers were installed around the wellhead. The well is properly identified with a clear, legibly-marked well identification sign. The tank battery consisted of six, 400 BBL production tanks and was diked. The tanks are located within a spray-lined and sealed secondary containment. There are e-stops outside the barriers, and the tanks are grounded, and have static dissipators. There is a truck grounding area for trucks collecting condensate and/or produced water. Lightning protection and a windsock are installed on top of the production tanks. Other production equipment on the well pad consisted of:
Jersey barriers are installed around the production equipment. The entire well pad is enclosed with a six-foot high, chain link fence with three-strand barbed wire and the man doors were locked. Along the interior of the chain link fence there is an earthen berm and it was stable. The soil stockpile is well-stabilized with vegetation. Drainage and erosion controls at the pad are in place and functioning. A closed-loop, above-ground drilling pit system was used, so there are no earthen pits requiring closure. The pad has a crushed limestone surface, and is in good repair. The lease road is stable and drivable. Preliminary restoration passed. |
0528006226 | 2013-03-18 | Drill / Deepen / Reopen | No Violations | Met with drilling supertintendent John Snook. Rig was tripping at 6900. |
1363108264 | 2013-03-05 | Drill / Deepen / Reopen | No Violations | I went to the site to check on the status of the rig move. The derrick was still down, and equipment was being moved from drilling the 1H to the 3H. |
1363289973 | 2013-03-13 | Drill / Deepen / Reopen | No Violations | I was onsite to check the status of drilling for the intermediate casing. They were currently 1350 of their target depth of 1500. They estimate that they will be cementing casing in 9 hours time. |
1364922186 | 2013-03-26 | Drill / Deepen / Reopen | No Violations | I went to the site and met with drilling consultant Rodney Bean, and reviewed the drilling data, and the planned production casing installation data. The well was drilled to a total measured depth of 13,705 this morning. |
1541479049 | 2013-03-11 | Drill / Deepen / Reopen | No Violations | |
206835090 | 2013-3-14 0:00: | DD | No Violations | 9.00 |
2078849353 | 2016-02-25 | Production Wells | No Violations | I was on location for a status check. My inspection found the access road gate locked and the access road is in good repair. An identification sign at the access road entrance, well, and tank battery. The pad is fenced and all man doors are locked. The #3H well is in production. The well is equipped with a plunger lift assembly. There is a steel dike around the tank battery.
The equipment on the pad consists of the following: 6 Storage tanks 1 Vapor recovery unit (VRU) 3 Gas processing units (GPU) 1 Vertical separator 3 Sand separators 1 Thermal electric generator 1 Heat treater 3 Producing wells Site fenced and man doors locked |
31179649 | 2013-3-13 0:00: | DD | No Violations |
For data sources see[10]