If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-121-24364 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.9462642883,"lon":-81.287026147,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2012-10-16 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 0 | |
Latitude: 39.9462642883 | |
Longitude: -81.287026147 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
-1409020029 | 2013-11-01 | The well site meets the preliminary restoration requirements. | ||||
-1554154715 | 2012-10-28 | On site to witness the second stage of the 9.625 cement job. Universal Well Services pumped cement back to surface. 5 bbl of cement returns. | ||||
-415154949 | 2014-03-31 | My inspection today finds the well appears to capable of production. The tank battery consists of eighteen 400 bbl tanks. Identification is posted in accordance with 1501.9-9-05(A)10. The lease road is in good repair. Production records are current. | ||||
1238495263 | 2012-11-13 | I stopped at the well site to check the status of the well. The rig is being moved. | ||||
1350659969 | 2012-10-18 | On site to witness 13.375" surface string cementing. The pipe was run to a depth of 1192' with a guide shoe on bottom. 45 bbl of returns to surface. The job was delayed by a top drive malfunction. | ||||
1371356584 | 2012-11-06 | My inspection today finds the drilling rig crew has ran 5.5" casing to a depth of 12080'. Universal is on site to cement the well. |