Well ID: 34-129-20224 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.6055691918,"lon":-82.9783203982,"icon":""}]} |
County: | |
Municipality: | |
Operator Name: | |
Well Pad ID: | |
Farm/Lease Name: | |
First Permit Date: | |
Last Permit Date: | |
Spud Date: 2009-02-02 | |
Unconventional: | |
Horizontal: | |
Producing: No | |
Violations: 0 | |
Latitude: 39.6055691918 | |
Longitude: -82.9783203982 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID | VIOLATION CODE | VIOLATION_COMMENT |
---|---|---|---|---|---|---|
-1873340269 | 2009-02-02 | - Dow Bowman rig moved on site and in the process of setting up. One pit dug and operator mixing drilling mud. | ||||
-271060519 | 2009-02-10 | - Drilling contractor Dow Bowman call to report that the well was dry and would be cemented.
- On site for cement plugging. Formation Cementing doing cementing. Four (4) plugs were set, 1st at bottom of well, 2nd at the Trenton formation, 3rd at surface casing and 4th at surface. - Drilling contractor plans to remove equipment of location on 2/12/2009 and locate on permit 34-129-2-0219 |
||||
-925001630 | 2009-02-04 | - On site for Surface Casing. 8 7/8 inch hole drilled to 720 feet, 693 feet plus 10foot landing joint of new 7inch casing place into well.
- Formation Cementing Inc. used 120 sacks of cement with 400 lbs. of accelerator and 150 lbs of cotton seed hulls. Good circulation when pumping cement into well. Cement weight 15.7 Yield 1.18. |
||||
1238099804 | 2009-03-24 | - Operator has filled in all pit and graded the area. The casing has been cut below grade and operator has photo of ID plate on casing.
- The area will be used for agricultural framing, the area has also been prep for planting farm crops. - Photos taken of the area. |
||||
246930102 | 2008-02-18 | Well as plugged on 2/10/2009, All drilling equipment removed from site except one water tank. Area has been graded and pits filled in. Well still open to surface.
- GPS well N 39.60555 W 082.97826 Acc. 9 |
||||
283942137 | 2009-02-03 | - On site for update of drilling progress. Drill depth 203 feet, operator will set 195 feet of conductor and cement. Operator plans on cementing conductor at 8:00 PM to night. Formation Cementing contacted. | ||||
887477516 | 2009-06-10 | well was drilled and plugged on 2/10/2009. All pits have been filled area has been graded and soybean have been planted and are growing. Road has been graded and stoned. |