34-155-24061

Well Details

Well ID: 34-155-24061
Loading map...
County:
Municipality:
Operator Name:
Well Pad ID:
Farm/Lease Name:
First Permit Date:
Last Permit Date:
Spud Date: 2013-01-17
Unconventional:
Horizontal:
Producing: No
Violations: 0
Latitude: 41.1910460785
Longitude: -80.6130069729

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID VIOLATION CODE VIOLATION_COMMENT
-1273753632 2013-03-04 My inspection found the pit filled and all debris removed. The tank battery was in place and contained one, 210 barrel production tank, one, 50 barrel brine tank, and a separator. The safety equipment was installed on the production tank. There was a plug on the load line. A frac tank was on location. Restoration operations were still in progress.
-1964055280 2013-01-15 My inspection found the well pad construction complete. The pits will be dug later in the day. Wildcat rig will be moving onto location starting 1/16/2012.
1356701364 2012-12-28 My inspection found the lease road and well pad under construction.
1357574800 2013-01-07 My inspection found PAC Drilling still working on the lease road and well pad.
1358505995 2013-01-18 I witnessed Universal Well Service cement the conductor casing for PAC Drilling. Hole #1 was drilled to 84' by Wildcat Drilling. The conductor was set to a depth of 72' with 12' foot of rat hole. Universal establish circulation with 8 barrels of fresh water, mixed 10 barrels of gel with unicele, and pumped 21 barrels of Type 1 3% Calcium 1/2 lb/sk Unicele cement. They displaced with 8 barrels of fresh water to a depth of 64'. There was 5 barrels of good cement return to surface. The cement held at surface for 20 minutes. The glacial till depth was estimated at 18'.
1864017697 2013-10-01 My inspection found the site graded and seeded. Vegetation was well established. The proper safety equipment was installed on the production tank. The dike met containment requirements. The tank battery contained a 210 barrel production tank, a 50 barrel brine tank, and a separator. There were plugs on the load lines. The proper identification signs were posted. The lease road was in good condition. The pits were filled and closed. The proper drainage and erosion controls were in place.
302502706 2013-10-01 My inspection found the site graded and seeded. Vegetation was well established. The tank battery contained a 210 barrel production tank, a 50 barrel brine tank, and a separator. There was a 7 day production chart in the separator. The well was equipped with a plunger lift unit. All debris has been removed. The pits were filled and closed. The proper identification sign was posted. The proper safety equipment was installed on the production tank.